If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26963 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.920167,"lon":-80.380094,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Gray Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 152172 | |
Farm/Lease Name: GRECOE | |
License Status: Active | |
Spud Date: 2015-10-17 | |
Permit Date: 2015-10-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.920167 | |
Longitude: -80.380094 |
Date | Event |
---|---|
2015-10-16 | New Permit Application |
2015-10-17 | Performed Spud Operation |
2016-02-26 | Drilling Completion |
2016-08-10 | Perforation |
2016-08-11 | Perforation |
2016-08-11 | Performed Stage 1 of Stimulation |
2016-08-11 | Performed Stage 2 of Stimulation |
2016-08-12 | Perforation |
2016-08-12 | Performed Stage 3 of Stimulation |
2016-08-12 | Performed Stage 4 of Stimulation |
2016-08-13 | Perforation |
2016-08-13 | Performed Stage 5 of Stimulation |
2016-08-13 | Performed Stage 6 of Stimulation |
2016-08-14 | Perforation |
2016-08-14 | Performed Stage 7 of Stimulation |
2016-08-19 | Perforation |
2016-08-19 | Performed Stage 8 of Stimulation |
2016-08-20 | Perforation |
2016-08-20 | Performed Stage 10 of Stimulation |
2016-08-20 | Performed Stage 9 of Stimulation |
2016-08-21 | Perforation |
2016-08-21 | Performed Stage 11 of Stimulation |
2016-08-22 | Perforation |
2016-08-22 | Performed Stage 12 of Stimulation |
2016-08-22 | Performed Stage 13 of Stimulation |
2016-08-23 | Perforation |
2016-08-23 | Performed Stage 14 of Stimulation |
2016-08-24 | Perforation |
2016-08-24 | Performed Stage 15 of Stimulation |
2016-08-24 | Performed Stage 16 of Stimulation |
2016-08-25 | Perforation |
2016-08-25 | Performed Stage 17 of Stimulation |
2016-08-25 | Performed Stage 18 of Stimulation |
2016-09-08 | Perforation |
2016-09-08 | Performed Stage 19 of Stimulation |
2016-09-09 | Performed Stage 20 of Stimulation |
2016-09-10 | Perforation |
2016-09-11 | Perforation |
2016-09-11 | Performed Stage 21 of Stimulation |
2016-09-12 | Performed Stage 22 of Stimulation |
2016-09-13 | Perforation |
2016-09-15 | Perforation |
2016-09-15 | Performed Stage 23 of Stimulation |
2016-09-16 | Perforation |
2016-09-16 | Performed Stage 24 of Stimulation |
2016-09-17 | Performed Stage 25 of Stimulation |
2016-09-19 | Perforation |
2016-09-19 | Performed Stage 26 of Stimulation |
2016-09-20 | Perforation |
2016-09-20 | Performed Stage 27 of Stimulation |
2016-09-21 | Perforation |
2016-09-22 | Perforation |
2016-09-22 | Performed Stage 28 of Stimulation |
2016-09-23 | Performed Stage 29 of Stimulation |
2018-09-26 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-08-11 | 2016-09-23 | 7,952 | 9,882,180 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 40/70 Mesh Sand | Keane | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 4.69898 | 4,327,080.0 |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 10 | 0.00161076 | 1483.27 | |
Ethylene Glycol | 107-21-1 | 20 | 0.0580168 | 53425.1 | ||||
Ammonium Chloride | 12125-02-9 | 0.9 | 0.000578571 | 532.78 | ||||
Citric Acid | 77-92-9 | 30 | 0.000914289 | 841.927 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 2 | 0.00128571 | 1183.95 | ||||
Propargly Alcohol | 107-19-7 | 1 | 0.00001550 | 14.27 | ||||
Polyacrylamide | 69418-26-4 | 30 | 0.0192857 | 17759.3 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 20 | 0.0128571 | 11839.6 | ||||
Potassium Iodide | 7681-11-0 | 5 | 0.00007748 | 71.35 | ||||
Alcohols, C12-16, Ethoxylated | 68551-12-2 | 2 | 0.00128571 | 1183.95 | ||||
Water | Vantage | Carrier/ Base Fluid | Water | 7732-18-5 | 100 | 89.5546 | 82,466,800.0 | |
Al-11 | Keane | Corrosion Inhibitor | Propargyl Alcohol Derivative | Proprietary | 60 | 0.000929785 | 856.197 | |
Propargly Alcohol | 107-19-7 | 1 | 0.00001550 | 14.27 | ||||
Potassium Iodide | 7681-11-0 | 5 | 0.00007748 | 71.35 | ||||
Bactron K-219 | NALCO | Biocide | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 10 | 0.00161076 | 1483.27 | |
Methanol | 67-56-1 | 30 | 0.00483227 | 4449.82 | ||||
100 Mesh | Keane | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 4.83416 | 4,451,560.0 | |
EC6486A Scale Inhibitor | NALCO | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 20 | 0.0580168 | 53425.1 | |
Amine Triphosphate | Proprietary | 20 | 0.0580168 | 53425.1 | ||||
7.5% HCL | Keane | Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0402879 | 37099.3 | |
TXP-34 | Keane | Friction Reducer | Ammonium Chloride | 12125-02-9 | 0.9 | 0.000578571 | 532.78 | |
Oleic Acid Diethanolamide | 93-83-4 | 2 | 0.00128571 | 1183.95 | ||||
Water | 7732-18-5 | 43 | 0.0276428 | 25455 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 20 | 0.0128571 | 11839.6 | ||||
Polyacrylamide | 69418-26-4 | 30 | 0.0192857 | 17759.3 | ||||
Alcohols, C12-16, Ethoxylated | 68551-12-2 | 2 | 0.00128571 | 1183.95 | ||||
FEAC-20 | Keane | Iron Control | Acetic Acid | 64-19-7 | 45 | 0.00137143 | 1262.89 | |
Citric Acid | 77-92-9 | 30 | 0.000914289 | 841.927 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-08-11 | 1 | Natural Sand | 7,768,491 | 8,814 | 9,180 |
2016-08-11 | 2 | Natural Sand | 7,768,491 | 8,783 | 9,175 |
2016-08-12 | 3 | Natural Sand | 7,768,491 | 8,708 | 9,325 |
2016-08-12 | 4 | Natural Sand | 7,768,491 | 8,680 | 9,118 |
2016-08-13 | 5 | Natural Sand | 7,768,491 | 8,638 | 9,315 |
2016-08-13 | 6 | Natural Sand | 7,768,491 | 8,620 | 9,119 |
2016-08-14 | 7 | Natural Sand | 7,768,491 | 8,529 | 8,806 |
2016-08-19 | 8 | Natural Sand | 7,768,491 | 8,588 | 8,982 |
2016-08-20 | 9 | Natural Sand | 7,768,491 | 8,580 | 9,006 |
2016-08-20 | 10 | Natural Sand | 7,768,491 | 8,306 | 8,765 |
2016-08-21 | 11 | Natural Sand | 7,768,491 | 8,463 | 8,796 |
2016-08-22 | 12 | Natural Sand | 7,768,491 | 8,465 | 8,894 |
2016-08-22 | 13 | Natural Sand | 7,768,491 | 8,251 | 8,957 |
2016-08-23 | 14 | Natural Sand | 7,768,491 | 8,373 | 9,098 |
2016-08-24 | 15 | Natural Sand | 7,768,491 | 8,192 | 9,235 |
2016-08-24 | 16 | Natural Sand | 7,768,491 | 8,058 | 8,433 |
2016-08-25 | 17 | Natural Sand | 7,768,491 | 8,046 | 8,906 |
2016-08-25 | 18 | Natural Sand | 7,768,491 | 8,037 | 8,733 |
2016-09-08 | 19 | Natural Sand | 7,768,491 | 8,301 | 9,390 |
2016-09-09 | 20 | Natural Sand | 7,768,491 | 7,951 | 8,642 |
2016-09-11 | 21 | Natural Sand | 7,768,491 | 7,971 | 8,912 |
2016-09-12 | 22 | Natural Sand | 7,768,491 | 8,075 | 8,829 |
2016-09-15 | 23 | Natural Sand | 7,768,491 | 8,250 | 8,952 |
2016-09-16 | 24 | Natural Sand | 7,768,491 | 8,009 | 8,610 |
2016-09-17 | 25 | Natural Sand | 7,768,491 | 8,005 | 8,462 |
2016-09-19 | 26 | Natural Sand | 7,768,491 | 7,969 | 8,634 |
2016-09-20 | 27 | Natural Sand | 7,768,491 | 7,982 | 8,840 |
2016-09-22 | 28 | Natural Sand | 7,768,491 | 7,961 | 8,671 |
2016-09-23 | 29 | Natural Sand | 7,768,491 | 7,878 | 8,835 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | VANTAGE ENERGY APPALACHIA II LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 2,095,918.76 | 329 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,523,536.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 922,484.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 1,541.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 665.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 261.27 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 819.75 Tons | LANDFILL | PAD059087072 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 1.49 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 734.51 Tons | LANDFILL | PAD059087072 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 35.81 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 205.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 468.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 9.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 633.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 425.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 3.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 13.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 0.58 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Waste Water Treatment Sludge | 1.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Fracturing Fluid Waste | 311.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 6.97 Tons | LANDFILL | PAD059087072 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 1.19 Tons | LANDFILL | 100620 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 29.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil & Gas Related Spills | 18.04 Tons | LANDFILL | 100172 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Servicing Fluid | 445.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 3.02 Tons | LANDFILL | 100172 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 9.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 178.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 10.81 Tons | LANDFILL | 100663 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 345.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 1.76 Tons | LANDFILL | 100663 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 67.93 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 743.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 4,429.74 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 8.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 2.66 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 816.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Servicing Fluid | 40.98 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 465.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 14.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid | 46.71 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 13.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 96.65 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 92.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 14.19 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2018 | RICE DRILLING B LLC | Servicing Fluid | 112.68 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 566.31 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 56.37 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 32.05 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 317.24 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,729.61 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 149.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 53.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2419160 | Primary Facility | 2015-10-20 | Drilling/Alteration | No Violations Noted | Well spud on 10/18/2015. Operator drilled 30-inch borehole and set 26-inch conductor pipe at 40 ft. Conductor pipe cemented to surface. |
2432223 | Primary Facility | 2015-11-24 | Drilling/Alteration | No Violations Noted | Decker Rig #8. Operator plugged vertical portion of the borehole back to KOP. Borehole loaded with SOBM. |
2432227 | Primary Facility | 2015-11-04 | Drilling/Alteration | No Violations Noted | Decker Rig #8. Intermediate portion of borehole drilled to 2,732’. Performing reamer run with tri-cone bit. Site ok. |
2432231 | Primary Facility | 2015-11-18 | Drilling/Alteration | No Violations Noted | Decker Rig #8. Top hole portion of well drilled to 7,870’ MD. Preparing to log borehole. |
2432233 | Primary Facility | 2015-10-30 | Drilling/Alteration | No Violations Noted | Decker Rig #8. Coal protective casing (13 3/8”) set and cemented to surface with no issues on 10/29/15. Casing shoe TD is 1,336’. Drilled out shoe. Conduct site inspection. Site ok. |
2432237 | Primary Facility | 2015-10-28 | Drilling/Alteration | No Violations Noted | Decker Rig #8. Surface casing (18 5/8”) set and cemented to surface with no issues on 10/27/15. Operator currently drilling ahead @ 741’. |
2432240 | Primary Facility | 2015-11-12 | Drilling/Alteration | No Violations Noted | Decker Rig #8. Intermediate portion of borehole drilled to 2,732’. Intermediate casing (9 5/8”) set @2,713’ and cemented on 11/1/15. 9 5/8” Casing shoe TD is 2,713’. Drilling ahead @ 7,228’. |
2472164 | Primary Facility | 2016-03-01 | Drilling/Alteration | No Violations Noted | Drilling complete. Well drilled to 13,926’ TMD / 7,551’ TVD. Production casing set @ 13,906’ and cemented to the surface.
Note: Conservation well |
2480002 | Primary Facility | 2016-03-30 | Routine/Complete Inspection | No Violations Noted | Well spud and drilled. |
2508541 | Primary Facility | 2016-08-02 | Routine/Complete Inspection | No Violations Noted | Well drilled. Well for hydrualic fracturing operations to begin. |
2513498 | Primary Facility | 2016-08-24 | Routine/Complete Inspection | No Violations Noted | Well drilled. Hydraulic fracturing operations on site. |
2518401 | Primary Facility | 2016-09-06 | Routine/Complete Inspection | No Violations Noted | Hydraulic Fracturing operations ongoing on site. |
2714369 | Primary Facility | 2018-04-04 | Routine/Complete Inspection | No Violations Noted | Unable to observe the well. The well is located below grade and covered by a steel plate and containment. The operator is currently drilling on site. The well is producing. Five 400 bbl production tanks are on site and equipped with containment. |
For data sources see[9]