Well ID: 34-013-20769 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.864074877,"lon":-80.86156558,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: York Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-000910 | |
Farm/Lease Name: SCHNEGG UNIT C | |
License Status: Producing | |
License Date: 2015-10-16 | |
Spud Date: 2014-05-30 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2014-09-30 | |
Well Total Depth: 16998 ft | |
Configuration: Horizontal | |
Latitude: 39.864074877 | |
Longitude: -80.86156558 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-04-08 | Proposed Formations:POINT PLEASANT, Issued Date:4/8/2014, Expired Date:4/7/2016 12:00:00 PM, Drilling unit acres:700, Proposed Well Type:OG, Proposed Well Class:FWC |
APP | 2014-07-03 | Proposed Formations:POINT PLEASANT, Issued Date:7/3/2014, Expired Date:7/2/2016 12:00:00 PM, Drilling unit acres:426.533, Proposed Well Type:OG, Proposed Well Class:NWC |
Reached Total Depth | 2014-09-30 | |
Correction to Well | 2015-02-20 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-09-04 | |
APP | 2015-10-16 | Proposed Formations:POINT PLEASANT, Issued Date:10/16/2015, Expired Date:10/15/2017 12:00:00 PM, Drilling unit acres:425.981, Proposed Well Type:OG, Proposed Well Class:POOL |
Construction Permit Expires | 2017-10-15 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/30/2015 | 05/22/2015 | 10041 | 11,671,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand, White, 100 mesh | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.455111 | 498605 |
Sand, White, 30/50 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 5.5977 | 6,132,670.0 | |
Sand, White, 40/70 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 4.24023 | 4,645,470.0 | |
Ingredients in Additive(s) (MSDS and non-MSDS) | Baker Hughes | See Trade Name(s) List | Potassium Acetate | 127-08-2 | 0.5 | 0.00000780 | 8.51 | |
Potassium Chloride | 7447-40-7 | 1 | 0.0001063 | 116.484 | ||||
Calcium Chloride | 10043-52-4 | 5 | 0.0005315 | 582.42 | ||||
1-Propanesulfonic acid, 2-methyl-2-[(1-oxo-2-propen-1-yl)amino]-, polymer with 2-propenamide, sodium salt | 83446-68-8 | 60 | 0.0151075 | 16556.2 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0010357 | 1135.06 | ||||
Ethanol | 64-17-5 | 5 | 0.0009418 | 1032.06 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.0039546 | 4333.81 | ||||
Polyoxythylene Sorbitan Monooleate | 9005-65-6 | 0.5 | 0.0002589 | 283.764 | ||||
Tar Bases, Quinoline Derivs., Benzyl Chloride-Quaternized | 72480-70-7 | 30 | 0.0004659 | 510.6 | ||||
Sulfurized polyolefin | 68037-13-8 | 5 | 0.00007770 | 85.1 | ||||
Formic Acid | 64-18-6 | 30 | 0.0004659 | 510.6 | ||||
Sorbitan Monooleate | 1338-43-8 | 0.5 | 0.0002589 | 283.764 | ||||
Polyoxyethylene sorbitan monooleate | 9005-65-6 | 5 | 0.001259 | 1379.68 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.0010194 | 1117.16 | ||||
Oxyalkylated alcohol | 78330-21-9 | 5 | 0.001259 | 1379.68 | ||||
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt | 71050-62-9 | 20 | 0.0021258 | 2329.68 | ||||
Isopropanol | 67-63-0 | 5 | 0.00007770 | 85.1 | ||||
Water | 7732-18-5 | 85 | 0.70794 | 775829 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0230897 | 25304 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.0018835 | 2064.13 | ||||
Crystalline Silica (Quartz) | 14808-60-7 | 100 | 10.29 | 11,276,700.0 | ||||
Ethylene Glycol | 107-21-1 | 45 | 0.0047831 | 5241.78 | ||||
Oleamide DEA | 93-83-4 | 2 | 0.0010357 | 1135.06 | ||||
Ammonium Persulphate | 7727-54-0 | 100 | 0.0006187 | 678 | ||||
Aldehyde | 104-55-2 | 30 | 0.0004659 | 510.6 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.115194 | 126241 | ||||
Sorbitan, mono-(9Z)-9-octadecenoate | 1338-43-8 | 5 | 0.001259 | 1379.68 | ||||
Citric Acid | 77-92-9 | 60 | 0.0031347 | 3435.34 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.0056505 | 6192.38 | ||||
Polyaklylene | 7756-94-7 | 1 | 0.00001550 | 17.02 | ||||
Ammonium Chloride | 12125-02-9 | 3 | 0.0015536 | 1702.58 | ||||
Poly (acrylamide-co-acrylic acid) partial sodium salt | 62649-23-4 | 30 | 0.015536 | 17025.8 | ||||
Potassium Iodide | 7681-11-0 | 2 | 0.00003110 | 34.04 | ||||
Oxyalkylated Fatty Acid | 61791-002 | 40 | 0.0006212 | 680.8 | ||||
FRW-18 | Baker Hughes | Friction Reducer | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0518022 | 56752.8 | |
CI-39 | Baker Hughes | Corrosion Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0015535 | 1702 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 88.7983 | 97,313,600.0 | |
Ferrotrol 300L | Baker Hughes | Iron Control | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0052261 | 5725.57 | |
MaxPerm-20A, 265 gallon tote | Baker Hughes | Friction Reducer | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0251866 | 27593.7 | |
Scaletrol 720 | Baker Hughes | Scale Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0106323 | 11648.4 | |
HCl, 10.1 - 15% | Baker Hughes | Acidizing | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.76819 | 841604 | |
Alpha 1427 | Baker Hughes | Biocide | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0188406 | 20641.3 | |
GBW-5 | Baker Hughes | Breaker | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0006189 | 678 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-05-22 | H2O | 15 | 12514 Bbl | 560885 | BAKER-HUGHES | STAGE 22/22
60 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | XTO ENERGY INC. | 1451586 | 0 | 153 |
2016 | XTO ENERGY INC. | 3003077 | 0 | 366 |
2017 | XTO ENERGY INC. | 1069055 | 0 | 233 |
2018 | XTO ENERGY INC. | 66727 | 0 | 14 |
2019 | XTO ENERGY INC. | 227393 | 0 | 48 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | XTO ENERGY INC. | Brine | 17126 | 153 |
2016 | XTO ENERGY INC. | Brine | 29124 | 366 |
2017 | XTO ENERGY INC. | Brine | 12616 | 233 |
2018 | XTO ENERGY INC. | Brine | 1260 | 14 |
2019 | XTO ENERGY INC. | Brine | 4192 | 48 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0170573868 | 2016-02-04 | Production Wells | No Violations | I was on site today with Anthony Carson of the engineering group. We were reviewing an area that has slipped. The operator will submit drawings to the engineering department and repair the slipped area. |
0172437465 | 2015-01-22 | Preliminary Restoration | No Violations | The preliminary restoration for this well is completed. The pad is in satisfactory condition with proper erosion and sedimentation controls in place. Company shall continue to monitor the location to ensure the pad remains in satisfactory condition. Preliminary restoration passed. |
0417212795 | 2018-03-19 | Production Wells | No Violations | On site inspection and documentation of the said well annular pressures. On this day I witnessed the 13.375 casing well head section had 209 psi, this well head section is the area between the 13.375 internal pipe area and the 9.625 diameter casing external pipe area. The 9.625 well head section had 78 psi, this is the area between the 9.625 diameter casing internal pipe area and the 5.5 diameter casing external pipe area. Electronic transducers have been installed on both well head sections and are taking reading every 4 minutes. |
0431678237 | 2018-06-20 | Production Wells | No Violations | Status check inspection found the well is still shut in following a well control incident that occurred on 02/15/2018 involving the #7 well on the pad. All production equipment has been repaired along with the well pad. An earthen berm has been installed around the well pad perimeter. The company is in discussion with the Divisions management regarding putting the wells back into production. |
0562685093 | 2018-06-04 | Production Wells | No Violations | Status check inspection as a follow up to a incident that occurred on 02/15/2018 involving a well on the location identified as the #7 well. My inspection found the well is shut in and not producing along with the other 3 wells on the pad. A 3rd party contractor identified as ShalePro is on location and the contractor is digging the flow lines up associated with the #3 and #5 wells on the pad and making changes to the flow line system both at the well head and production area. Also noted is a 3rd party well head contractor identified as (GE) General Electric was reportedly on location Friday 06/01/2018 and pressure tested the well head assemblies on the # 3 and # 5 wells. |
0607731059 | 2018-10-09 | Production Wells | No Violations | Status check inspection found the well equipped with a lower A and upper B section with a production tree installed on the well head B section. There is annular pressure monitoring in place on both the A & B section well head section with 2 riser pipes installed on the outlet valves. The riser pipes are plumed into a main sales line that is connected to the production tank facility. The 9.625 well head (B) section valve that monitors the pressure between the 5.5 diameter production casing and the 9.625 intermediate casing string is in the closed position. The 13.375 well head (A) section valve that monitors the pressure between the outside of 9.625 intermediate diameter casing string and the inside of the 13.375 diameter casing string is in the open position. No gauges are present on the well head annular ports, only electronic transducers. |
0667171679 | 2014-05-30 | Casing String Witnessed | No Violations | On this day the 30 casing was cemented in a 36 open hole to a depth of 70. Universal ran 200 sks of class A cement with cement to surface established. See cement ticket for details. No violations noted. |
0670670473 | 2018-05-07 | Production Wells | No Violations | Status check inspection found the production flow line and production tree valves are in the closed position following a well control incident that occurred on 02/15/2018 involving a well on the well pad site identified as the Schnegg Unit 7H. Also noted was the 13.375 diameter casing well head section valve was in the open position and the 9.625 diameter casing well head section valve is in the closed position. There is also one line present to monitor annular pressure between the 18.625 x 13.375 casing strings. The line is of 1 dimensional size and is attached to a steel plate welded between the 18.625 diameter surface and 13.375 diameter 1st intermediate, the line has a valve that is open to the atmosphere and has no pressure relief valve or gauge present. The well site remediation is on going with the Divisions Hydrologist and Engineers taking the lead role in addressing those tasks. |
0696118232 | 2019-03-07 | Production Wells | No Violations | On site inspection found the well is now in production and producing through a production tree, the main sales line is bypassed and the well is selling through a temporary sales line. The well head A&B sections have 2 diameter riser pipes attached to the service outlet ports, the riser pipes are equipped with both shut off and check valves along with electronic transducers. The purpose of the riser pipes is for annular pressure control and monitoring, the riser pipes are tied into a low pressure recover system. The production facility houses the equipment related to all (4) wells on the pad and consists of fluid separators and line heaters along with gas measurement devices, also present is a total of (6) steel tanks capable of holding 400 fluid barrels volume each. The above ground storage tank used for fresh water storage has been removed from the pad since my last inspection. The well pad surface and lease road are stone construction and in good repair, the areas disturbed during the past well control incident have been restored. |
0749208165 | 2018-04-12 | Production Wells | No Violations | On site inspection to a well control incident that occurred on 02/15/2018 involving the Schnegg # 7 well. Upon inspection it was observed that there is a total of 4 wells on the pad. The said well is equipped with a 13.375 (A) well head section and a 9.625 (B) well head section. There is annular pressure monitoring in place on both the A & B well head sections. The annular casing well head sections have electrical monitoring data gauges installed that allow pressures to be recorded by the companied SCADA computer system. The production casing is currently shut in and the well is not in operation |
0752695685 | 2018-03-08 | Production Wells | No Violations | inspection report to document the well is shut in and isolated due to a recent well control event involving the Schnegg Unit # 7. There is a protection cage around the well and I have requested daily monitoring of the 13.375 and 9.625 annulis. The well will remain shut in until the issue with the # 7 well is corrected. |
0860119396 | 2018-03-13 | Production Wells | No Violations | On site inspection as a response to a recent well control incident involving a well on site identified as the Schnegg Unit 7-H. All wells on site are currently shut in and I have requested annular pressure gauges be installed on all wells on site excluding the # 7 well which the annuli is open to the atmosphere. The production facility containment area perimeter berm steel containment area has been removed and will need put back in place before the wells can go back into production. |
0896962848 | 2018-04-26 | Production Wells | No Violations | On site inspection as a follow up to a well control incident that occurred on 02/15/2018 involving the Schnegg Unit 7-H well. The said well has the production valves closed and is shut in and not producing commercially. There has been flow lines and valves installed on the 13.375 and 9.625 diameter casing string well head sections and company has installed annular pressure monitoring gauges on these sections. The annular pressure is monitored by the means of electronic gauges that send pressure reading back to the main frame recorder every 4 minutes. A remediation plan has been submitted and approved by the Divisions Hydrologist Jake Glascock. Crews from Parsons excavating is on site cutting the entire well pad surface down 2. |
0966431732 | 2018-03-15 | Production Wells | No Violations | Follow up inspection to a well control incident that occurred on 02/15/2018 involving the said well. On this day I was accompanied by ODNR South East Region District Supervisor Brent Bear along with ODNR Engineering Supervisor Mark Atkinson and Engineer Tech Anthony Carlson with Jack Glascock from the Divisions Hydrology section also on site. Matters involving the remediation and sampling of areas affected by the well situation were addressed and documented by the ODNR Team members. Addressing the said well - The annular pressure between the 9.625 and 13.375 casing string was zero. The annular space between the 9.625 annular and the 13.375 internal is not accessible due to the 13.375 casing valve plug not being able to be removed. The company is working on contacting a contractor to address the situation. |
0977445969 | 2016-01-25 | Production Wells | No Violations | On this day I was on site to review the pad area. XTO had called and they were planning to erect a water holding tank. The tank will be for fresh water only and be used in the completion process. The water will be heated and transferred to the completion trucks. The site appeared to be in satisfactory condition. |
1299483463 | 2018-03-28 | Production Wells | No Violations | On site inspection follow up to a well control incident that occurred on 02/15/2018 involving the # 7 well on the pad. On this day I was accompanied by Inspector Andrew Corder with Rich Lightner and Todd Snyder with XTO also on location. The said well is currently shut in. The company has electronic monitors on the 13.375 diameter and 9.626 diameter well head annular pressure outlet ports. The electronic transducers are downlinked into the companys SCADA recording system. The pressures on the 13.375 and 9.625 well heads were 273 psi on the 13.375 and 79 psi on the 9.625. |
1310533350 | 2018-03-14 | Production Wells | No Violations | |
1462369724 | 2019-01-29 | Production Wells | No Violations | On site inspection found crews in the area repairing the production flow lines associated with the #7 & #9 wells on the well pad. The flow lines were severed during the repair of the #7 well after a well control incident on 02/15/2018. The said well is equipped with a lower A and upper B section with 2 diameter riser pipes installed on each section. Each rise pipe consists of 2 diameter flow lines equipped with shut off valves and electronic transducers. The riser pipes are tied into a single flow line that runs to the production tank facility. The A section riser pipe valve is open to the production tank facility and the pressure remains at zero pounds. The B section which is the section between the 5.5 and 9.625 diameter casing strings is closed and the pressure reads 224 pound pressure as reported by the company men on site. Production tubing is set in the 5.5 production casing. The well is shut in and has been since the incident on 02/15/2018. |
1505933780 | 2018-09-25 | Production Wells | No Violations | On site inspection accompanied by ODNR Engineer Mark Atkinson along with Ohio EPA representatives Sean Stephenson and John Rochott, also present representing XTO Energy was Gary Beal. It was observed on this day that there is 4 wells present on the well pad also identified as the Schnegg Well Pad owned by XTO Energy ODNR owner identification number 8063. The pad surface was observed to be free from standing water and does have a stone surface in good repair. The company has erected a earthen berm around the well pad surface and is recovering any surface water created on the well pad from the recent rain events. A large oval shaped metal construction polymer lined open top fresh water container has been erected on the South East side of the well pad. The well head was observed to be equipped with a lower A and upper B section with 2 diameter riser pipes attached to both the A&B sections, the riser pipes are equipped with transducers to monitor annular pressure. The riser pipes are also tied into a steel line that runs to the production tanks at the production facility, there are a total of 6 tanks present that are steel construction and capable of holding 400 barrel of fluid each.. The riser pipes are equipped with valves. The riser pipe connected to the well head section that monitors the pressure between the 5.5 and 9.625 diameter casing strings is in the closed position. The riser piper that monitors the pressure between the 9.625 and 13:375 diameter casing strings is in the open position. There is also a total of (2) streel riser pipes present that are cementing into the annular spaces between the conductor and surface casing strings and the surface and first intermediate casing strings. These 2 pipes are 1 in diameter and have ball valves attached to he end of the pipes, the ball valves are in the open position and no transducers are present. The well head is equipped with a tubing head section and the production lines are in the closed position. |
1625682351 | 2018-10-23 | Production Wells | No Violations | Status check inspection accompanied by ODNR Inspector John Fleming with XTO Representatives Gary Beal and Tracy Vanscoy also present. The purpose of the meeting was to discuss the monitoring and recovery any pressure created from the annular spaces between the 5.5 and 9.625diameter casing strings and between the 9.625 and the 13.375 casing strings. On this day the 13.375 diameter casing well head section the valve was open and the 9.625 diameter casing the valve was closed. The 5.5 casing production tree valves are closed. The production facility consists of 6 steel tanks each capable of 400 barrels capacity each. Also present is 4 vertical separators and 4 line heaters. The only metering present is the product produced from inside the production casing. No metering of the annular pressure is present. The 9.625 and 13.375 well head section annular pressure is being monitored electronically. |
1627092449 | 2018-03-23 | Production Wells | No Violations | Inspection report to document the well head annular pressures as a follow up to a well control incident that occurred on the well pad on 02/15/2018 involving the Schnegg #7 well. The 9.625 casing head which is the pressure between the 5.5 casing outside diameter and the 9.625 casing inside diameter had a recorded pressure of 81 pounds per square inch. The 13.375well head section which is the pressure between the 9.625 casing outside diameter and the 13.375 casing inside diameter had a recorded pressure of 215 pounds per square inch. Both records are recorded data from the Companys electronic recording system (SCADA). |
1733393733 | 2018-03-22 | Production Wells | No Violations | Inspection report to document the well head annular pressures as a follow up to a well control incident that occurred on the well pad on 02/15/2018 involving the Schnegg #7 well. The 9.625 casing head which is the pressure between the 5.5 casing outside diameter and the 9.625 casing inside diameter had a recorded pressure of 80 pounds per square inch. The 13.375well head section which is the pressure between the 9.625 casing outside diameter and the 13.375 casing inside diameter had a recorded pressure of 213 pounds per square inch. Both records are recorded data from the Companys electronic recording system (SCADA). |
1929809075 | 2018-04-05 | Production Wells | No Violations | On site inspection accompanied by Engineer Technician Anthony Carson. On this day I witness XTO Representative Luke Beebe on site releasing annular pressure from the 13.375diameter casing and 9.625 diameter casing well head sections. All wells on the pad are still shut in following a well control incident on 02/15/2018 involving the Schnegg # 7 well. ODNR Engineer Technician Anthony Carson was working on the well pad remediation process with Randy Cutlip with XTO. |
1997388541 | 2018-05-16 | Production Wells | No Violations | Status check inspection found the well shut in and not in production due to a well control incident that occurred on 02/15/2018 involving a well on the pad identified as the Schnegg Unit B 7-H. The said well does have annular pressure monitoring in place and is being monitored by the companys SCADA electronic monitoring and recording system. The Divisions management is working with the company regarding the material modifications made to the well pad during the repair of the #7 well and along with the review of the well construction and presence of annular well bore pressure. |
2014826420 | 2014-06-08 | Casing String Witnessed | No Violations | On the day of my inspection Sidewinder #8 drilled the open hole and the 20 casing was ran and cemented. See cement ticket for details. No violations noted. |
2020226638 | 2014-09-02 | Casing String Witnessed | No Violations | On this day the 13.375 casing was cemented in a 17.5 open hole to a depth of 2113. Baker ran 1560 sks of class A cement with cement to surface established. See cement ticket for details. No violations noted. |
For data sources see[9]