X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-083-24519

Well Details

Well ID: 34-083-24519
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Monroe Township
Operator Name: BI JOE DEVELOPMENT INC
Well Pad ID:
Farm/Lease Name: SCHILLINGER UNIT
License Status: Producing
License Date: 2011-05-18
Spud Date: 2011-06-07
Spud Drilling Contractor: G & H DRLG
Final Drill Date: 2011-06-16
Well Total Depth: 4636 ft
Configuration: Vertical
Latitude: 40.403657478
Longitude: -82.39120884

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-05-18 Proposed Formations:BEREA THROUGH TREMPEALEAU, Issued Date:5/18/2011, Expired Date:5/17/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2011-06-16
Completion Report Received 2011-10-07
Construction Permit Expires 2013-05-17
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-12-12 4456 4524 39

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-07-12 ACID 15 3000 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
0 0 0
2011 BI JOE DEVELOPMENT INC 2132 6192 171
2012 BI JOE DEVELOPMENT INC 4256 7392 366
2013 BI JOE DEVELOPMENT INC 2900 5607 365
2014 BI JOE DEVELOPMENT INC 3731 5514 365
2015 BI JOE DEVELOPMENT INC 2224 3920 365
2016 BI JOE DEVELOPMENT INC 2310 3559 365
2017 BI JOE DEVELOPMENT INC 2344 3065 365
2018 BI JOE DEVELOPMENT INC 1826 2873 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 BI JOE DEVELOPMENT INC Brine 550 171
2012 BI JOE DEVELOPMENT INC Brine 940 366
2013 BI JOE DEVELOPMENT INC Brine 815 365
2014 BI JOE DEVELOPMENT INC Brine 1070 365
2015 BI JOE DEVELOPMENT INC Brine 890 365
2016 BI JOE DEVELOPMENT INC Brine 860 365
2017 BI JOE DEVELOPMENT INC Brine 1065 365
2018 BI JOE DEVELOPMENT INC Brine 725 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0379282632 2011-06-17 Drill / Deepen / Reopen No Violations I witnessed the longstring cement job today. The well bore TD is 4636 feet with a 7 7/8 inch hole. 4614 feet of 4 1/2 casing was cemented in with a one stage cement job using 120 sacks of class A cement. The well circulated and the cement job was good. No violations noted this date.
1120503679 2011-06-10 Drill / Deepen / Reopen No Violations The surface casing has been set on this new deep well that is being drilled by G&H Drilling. I witnessed the BOP test that was conducted 8 hours after surface plug down. The test passed maintaining a pressure of 480 psi for 20 minutes. There are no violations noted this date. Drilling will continue.
1308588329 2011-06-14 Drill / Deepen / Reopen No Violations I witnessed drilling operations today. G&H Drilling is drilling at a depth of 3800 feet and are switching over to drilling on fluid. There are no violations noted this date.
1715592770 2013-03-22 Preliminary Restoration No Violations I inspected this well today it is in production and no violations.
1911090004 2011-06-09 Drill / Deepen / Reopen No Violations I witnessed the surface cement job today.
2047025718 2011-06-13 Drill / Deepen / Reopen No Violations I witnessed drilling operations today. G&H Drilling is drilling at a depth of 3366 feet. There are no violations noted this date.

For data sources see[9]

References