If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24519 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4,"lon":-82.39,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Monroe Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: SCHILLINGER UNIT | |
License Status: Producing | |
License Date: 2011-05-18 | |
Spud Date: 2011-06-07 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 2011-06-16 | |
Well Total Depth: 4636.00 ft | |
Configuration: Vertical | |
Latitude: 40.400000 | |
Longitude: -82.390000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-05-18 | Proposed Formations:BEREA THROUGH TREMPEALEAU, Issued Date:5/18/2011, Expired Date:5/17/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-06-16 | |
Completion Report Received | 2011-10-07 | |
Construction Permit Expires | 2013-05-17 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-12-12 | 4456 | 4524 | 39 |
4456 | 4524 | 39 | |
4456 | 4524 | 39 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-07-12 | ACID | 15 | 3000 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2011 | BI JOE DEVELOPMENT INC | 2132.00 | 6192.00 | 171 |
2012 | BI JOE DEVELOPMENT INC | 4256.00 | 7392.00 | 366 |
2013 | BI JOE DEVELOPMENT INC | 2900.00 | 5607.00 | 365 |
2014 | BI JOE DEVELOPMENT INC | 3731.00 | 5514.00 | 365 |
2015 | BI JOE DEVELOPMENT INC | 2224.00 | 3920.00 | 365 |
2016 | BI JOE DEVELOPMENT INC | 2310.00 | 3559.00 | 365 |
2017 | BI JOE DEVELOPMENT INC | 2344.00 | 3065.00 | 365 |
2018 | BI JOE DEVELOPMENT INC | 1826.00 | 2873.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BI JOE DEVELOPMENT INC | Brine | 550 | 171 |
2012 | BI JOE DEVELOPMENT INC | Brine | 940 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 815 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 1070 | 365 |
2015 | BI JOE DEVELOPMENT INC | Brine | 890 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 860 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 1065 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 725 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1715592770 | 2013-3-22 0:00: | PL | No Violations | |
-379282632 | 2011-6-17 0:00: | DD | No Violations | |
0379282632 | 2011-06-17 | Drill / Deepen / Reopen | No Violations | I witnessed the longstring cement job today. The well bore TD is 4636 feet with a 7 7/8 inch hole. 4614 feet of 4 1/2 casing was cemented in with a one stage cement job using 120 sacks of class A cement. The well circulated and the cement job was good. No violations noted this date. |
1120503679 | 2011-06-10 | Drill / Deepen / Reopen | No Violations | The surface casing has been set on this new deep well that is being drilled by G&H Drilling. I witnessed the BOP test that was conducted 8 hours after surface plug down. The test passed maintaining a pressure of 480 psi for 20 minutes. There are no violations noted this date. Drilling will continue. |
1308588329 | 2011-06-14 | Drill / Deepen / Reopen | No Violations | I witnessed drilling operations today. G&H Drilling is drilling at a depth of 3800 feet and are switching over to drilling on fluid. There are no violations noted this date. |
1715592770 | 2013-03-22 | Preliminary Restoration | No Violations | I inspected this well today it is in production and no violations. |
1911090004 | 2011-06-09 | Drill / Deepen / Reopen | No Violations | I witnessed the surface cement job today. |
2047025718 | 2011-06-13 | Drill / Deepen / Reopen | No Violations | I witnessed drilling operations today. G&H Drilling is drilling at a depth of 3366 feet. There are no violations noted this date. |
For data sources see[9]