X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22202

Well Details

Well ID: 37-115-22202
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: New Milford Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 150351
Farm/Lease Name: WARNER 4H
License Status: Active
Spud Date: 2016-09-16
Permit Date: 2016-08-22
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.830380
Longitude: -75.676608

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-02 2017-05-10 7003 9,060,440.0 100800

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-PREMIUM WHITE-30/50 Halliburton Proppant Listed Below
Ingredients Listed Above Listed Above Listed Below
SAND-COMMON WHITE - 100 MESH Halliburton Proppant Listed Below
LP-65 MC Halliburton Scale Inhibitor Listed Below
BE-9 Halliburton Biocide Listed Below
HAI-150E Halliburton Corrosion Inhibitor Listed Below
HYDROCHLORIC ACID Halliburton Solvent Listed Below
Diammonium phosphate 7783-28-0 5 0.00115313 1028
Non-hazardous food substance Proprietary 100 0.000555501 495
Ammonium chloride 12125-02-9 30 0.00691879 6166
Hydrochloric acid 7647-01-0 15 0.16663 148479
Water 7732-18-5 100 1.2138 1,081,600.0
Crystalline silica, quartz 14808-60-7 100 14.0445 12,514,900.0
Inorganic salt Proprietary 30 0.0255896 22803
Water 7732-18-5 100 84.6978 75,473,200.0
Hydrotreated light petroleum distillate 64742-47-8 30 0.0255896 22803
Acrylamide acrylate copolymer Proprietary 30 0.0255896 22803
Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00379433 3382
Organic phosphonate Proprietary 60 0.0138376 12331
FR-76 Halliburton Friction Reducer Listed Below
Fresh Water Operator Base Fluid Listed Below

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 SWN PROD CO LLC 0.00 0 0.00 0 0.00 0
2017 SWN PROD CO LLC 2,877,986.00 211 0.00 0 0.00 0
2018 SWN PROD CO LLC 2,541,634.00 365 0.00 0 0.00 0
2019 SWN PROD CO LLC 474,928.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2016-M09 Drill Cuttings (in Tons) RWC 810 38.59 Tons LANDFILL 101247
2016-M09 Produced Fluid (in Barrels) RWC 802 44.20 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M10 Drill Cuttings (in Tons) RWC 810 289.94 Tons LANDFILL 101247
2016-M10 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M11 Produced Fluid (in Barrels) RWC 802 64.80 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M12 Produced Fluid (in Barrels) RWC 802 69.60 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 110.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 197.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 75.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M04 Produced Fluid (in Barrels) RWC 802 363.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 336.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M05 Produced Fluid (in Barrels) RWC 802 82.00 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Tons) RWC 802 7.00 Tons LANDFILL THR029
2017-M05 Synthetic Liner Materials (in Tons) RWC 806 32.00 Tons LANDFILL 101247
2017-M06 Produced Fluid (in Barrels) RWC 802 9,801.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M06 Unused Fracturing Fluid Waste (in Tons) RWC 805 10.06 Tons LANDFILL THR029
2017-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 42.20 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M07 Produced Fluid (in Barrels) RWC 802 1,694.60 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M07 Synthetic Liner Materials (in Tons) RWC 806 2.67 Tons LANDFILL 100933
2017-M08 Produced Fluid (in Barrels) RWC 802 871.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M08 Synthetic Liner Materials (in Tons) RWC 806 1.20 Tons LANDFILL 101247
2017-M09 Produced Fluid (in Barrels) RWC 802 525.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M09 Produced Fluid (in Tons) RWC 802 5.73 Tons LANDFILL 301358
2017-M10 Produced Fluid (in Barrels) RWC 802 459.40 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 13.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M11 Produced Fluid (in Barrels) RWC 802 320.20 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-M12 Produced Fluid (in Barrels) RWC 802 290.80 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 23.20 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M01 Produced Fluid (in Barrels) RWC 802 605.40 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 21.73 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M02 Produced Fluid (in Barrels) RWC 802 206.80 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M03 Produced Fluid (in Barrels) RWC 802 94.80 Bbl SURFACE IMPOUNDMENT 826342
2018-M03 Produced Fluid (in Barrels) RWC 802 138.20 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M04 Produced Fluid (in Barrels) RWC 802 205.00 Bbl SURFACE IMPOUNDMENT 826342
2018-M05 Produced Fluid (in Barrels) RWC 802 118.00 Bbl SURFACE IMPOUNDMENT 826342
2018-M05 Produced Fluid (in Barrels) RWC 802 112.20 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M06 Produced Fluid (in Barrels) RWC 802 112.40 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 89.60 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M07 Produced Fluid (in Barrels) RWC 802 162.20 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 66.50 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M08 Produced Fluid (in Barrels) RWC 802 22.80 Bbl SURFACE IMPOUNDMENT 826342
2018-M08 Produced Fluid (in Barrels) RWC 802 206.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M09 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 186.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 22.00 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 113.60 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 23.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 22.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M11 Produced Fluid (in Barrels) RWC 802 94.00 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 46.80 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M12 Produced Fluid (in Barrels) RWC 802 26.00 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 142.80 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 3.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-M01 Produced Fluid (in Barrels) RWC 802 139.60 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 12.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-M02 Produced Fluid (in Barrels) RWC 802 98.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 10.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-M03 Produced Fluid (in Barrels) RWC 802 138.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2520141 Primary Facility 2016-09-19 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 9:10a.m. for a new spud inspection, Well Service Group was on site drilling the holes and running the conductor pipes for the 1H,4H, and 5H. The rig was drilling the mouse hole for the 1H. The drill cuttings are being put into a sealed role off container and hauled to Keystone Landfill. I took a walk around the location and everything looked OK.

The conductor pipe was set and cemented at 43' on the 1H, set and cemented at 45' on the 5H, and the hole was drilled to 45' on the 4H but they were waiting for a water truck to get the water out of the hole before running and cementing the conductor pipe. I left the site at 9:40a.m.

2528656 Primary Facility 2016-10-17 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 11:05a.m., I met with company man Kevin Heathcock, Falcon Rig 25 was on site and drilling out the cement on the intermediate casing plus 10' for their fit test. I took a walk around the location and there were no obvious concerns noticed.

Depth at time of inspection was 1611'. Projected TD for the top hole section is 6054' I left the site at 12:15p.m.

2562344 Primary Facility 2017-02-14 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 14:10p.m., I met with company man Dan Hessdorfer, SDC Rig 45 was on site and drilling the lateral section of the well. The top hole section of the well was drilled and completed on 10/21/16. I took a walk around the location and there were no obvious concerns noticed.

Depth at time of inspection was 11,003'. Projected TD for the well is 13,534' I left the site at 14:50p.m.

2590073 Primary Facility 2017-05-03 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 8:25a.m.

I met with company man Mark McPherson. Halliburton was on site to stimulate the 1H,4H, and 5H wells. They completed stage 1 out of 28 stages on the 4H and were running a correlation log on the well. The 1H was completed with 27 stages. The 5H hasn’t been started yet but will have 26 stages when completed. The water was being pumped to the site from the Zeffer production water impoundment. I took a walk around the location and there were no obvious concerns noticed. I left the site at 8:55a.m.

2625647 Primary Facility 2017-08-14 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:45p.m.

The well was recently completed and is in production. The well tag was on the well and correct. The cellar was set up with a plastic corrugated pipe around the well for inspection access; there was cement between the (20x13) and (13x9) annuli and there was no gas detected. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge, the valve going to the production tank was closed. There was 652psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 13:30p.m.

2677948 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a corrugated pipe around the well for inspection access. There was cement between the (20x13) and (13x9) annuli and there was no gas detected. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2730477 Primary Facility 2018-04-25 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. No E&S issues were observed. No violations noted.
2773366 Primary Facility 2018-09-11 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a plastic corrugated pipe around the well for inspection access. There was water 1' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[7]

References