X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22202

Well Details

Well ID: 37-115-22202
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: New Milford Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 150351
Farm/Lease Name: WARNER 4H
License Status:
Spud Date: 2016-09-18
Permit Date: 2016-08-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.830380
Longitude: -75.676608

For data sources see[1][2][3]

Well History

Date Event
Deviated
2016-08-22 New Permit Application
2016-09-16 Performed Spud Operation
2016-11-15 New Permit Application
2017-02-16 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-02 2017-05-10 7,003 9,060,440 100,800

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-PREMIUM WHITE-30/50 Halliburton Proppant Listed Below
Ingredients Listed Above Listed Above Listed Below
SAND-COMMON WHITE - 100 MESH Halliburton Proppant Listed Below
LP-65 MC Halliburton Scale Inhibitor Listed Below
BE-9 Halliburton Biocide Listed Below
HAI-150E Halliburton Corrosion Inhibitor Listed Below
HYDROCHLORIC ACID Halliburton Solvent Listed Below
Diammonium phosphate 7783-28-0 5 0.00115313 1028
Non-hazardous food substance Proprietary 100 0.000555501 495
Ammonium chloride 12125-02-9 30 0.00691879 6166
Hydrochloric acid 7647-01-0 15 0.16663 148479
Water 7732-18-5 100 1.2138 1,081,600.0
Crystalline silica, quartz 14808-60-7 100 14.0445 12,514,900.0
Inorganic salt Proprietary 30 0.0255896 22803
Water 7732-18-5 100 84.6978 75,473,200.0
Hydrotreated light petroleum distillate 64742-47-8 30 0.0255896 22803
Acrylamide acrylate copolymer Proprietary 30 0.0255896 22803
Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00379433 3382
Organic phosphonate Proprietary 60 0.0138376 12331
FR-76 Halliburton Friction Reducer Listed Below
Fresh Water Operator Base Fluid Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 SWN PROD CO LLC 0.00 0 0.00 0 0.00 0
2017 SWN PROD CO LLC 2,877,986.00 211 0.00 0 0.00 0
2018 SWN PROD CO LLC 2,541,634.00 365 0.00 0 0.00 0
2019 SWN PROD CO LLC 1,396,958.00 361 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 SWN PROD CO LLC Produced Fluid 200.60 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Drill Cuttings 328.53 Tons LANDFILL 101247
2017 SWN PROD CO LLC Synthetic Liner Materials 33.20 Tons LANDFILL 101247
2017 SWN PROD CO LLC Synthetic Liner Materials 2.67 Tons LANDFILL 100933
2017 SWN PROD CO LLC Produced Fluid 14,325.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Unused Fracturing Fluid Waste 10.06 Tons LANDFILL THR029
2017 SWN PROD CO LLC Produced Fluid 7.00 Tons LANDFILL THR029
2017 SWN PROD CO LLC Produced Fluid 5.73 Tons LANDFILL 301358
2017 SWN PROD CO LLC Other Oil & Gas Wastes 773.20 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 82.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 1,919.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Produced Fluid 440.60 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Produced Fluid 368.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 133.43 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Other Oil & Gas Wastes 22.00 Bbl REUSE (AT WELL PAD)
2019 SWN PROD CO LLC Other Oil & Gas Wastes 53.45 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 940.60 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 47.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019 SWN PROD CO LLC Produced Fluid 348.00 Bbl SURFACE IMPOUNDMENT 826342

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2520141 Primary Facility 2016-09-19 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 9:10a.m. for a new spud inspection, Well Service Group was on site drilling the holes and running the conductor pipes for the 1H,4H, and 5H. The rig was drilling the mouse hole for the 1H. The drill cuttings are being put into a sealed role off container and hauled to Keystone Landfill. I took a walk around the location and everything looked OK.

The conductor pipe was set and cemented at 43' on the 1H, set and cemented at 45' on the 5H, and the hole was drilled to 45' on the 4H but they were waiting for a water truck to get the water out of the hole before running and cementing the conductor pipe. I left the site at 9:40a.m.

2528656 Primary Facility 2016-10-17 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 11:05a.m., I met with company man Kevin Heathcock, Falcon Rig 25 was on site and drilling out the cement on the intermediate casing plus 10' for their fit test. I took a walk around the location and there were no obvious concerns noticed.

Depth at time of inspection was 1611'. Projected TD for the top hole section is 6054' I left the site at 12:15p.m.

2562344 Primary Facility 2017-02-14 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 14:10p.m., I met with company man Dan Hessdorfer, SDC Rig 45 was on site and drilling the lateral section of the well. The top hole section of the well was drilled and completed on 10/21/16. I took a walk around the location and there were no obvious concerns noticed.

Depth at time of inspection was 11,003'. Projected TD for the well is 13,534' I left the site at 14:50p.m.

2590073 Primary Facility 2017-05-03 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 8:25a.m.

I met with company man Mark McPherson. Halliburton was on site to stimulate the 1H,4H, and 5H wells. They completed stage 1 out of 28 stages on the 4H and were running a correlation log on the well. The 1H was completed with 27 stages. The 5H hasn’t been started yet but will have 26 stages when completed. The water was being pumped to the site from the Zeffer production water impoundment. I took a walk around the location and there were no obvious concerns noticed. I left the site at 8:55a.m.

2625647 Primary Facility 2017-08-14 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:45p.m.

The well was recently completed and is in production. The well tag was on the well and correct. The cellar was set up with a plastic corrugated pipe around the well for inspection access; there was cement between the (20x13) and (13x9) annuli and there was no gas detected. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge, the valve going to the production tank was closed. There was 652psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 13:30p.m.

2677948 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a corrugated pipe around the well for inspection access. There was cement between the (20x13) and (13x9) annuli and there was no gas detected. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2730477 Primary Facility 2018-04-25 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. No E&S issues were observed. No violations noted.
2773366 Primary Facility 2018-09-11 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a plastic corrugated pipe around the well for inspection access. There was water 1' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[8]

References