If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-28293 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.013927924,"lon":-81.93925717,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Washington Township | |
Operator Name: CAMERON PRODUCTION CO INC | |
Well Pad ID: | |
Farm/Lease Name: SEIBERT | |
License Status: Producing | |
License Date: 2000-09-27 | |
Spud Date: 2000-10-28 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2000-11-02 | |
Well Total Depth: 3970 ft | |
Configuration: Vertical | |
Latitude: 40.013927924 | |
Longitude: -81.93925717 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2000-09-27 | Proposed Formations:CLINTON, Issued Date:9/27/00, Expired Date:9/27/01 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2000-10-28 | RBDMS Rec |
Completed | 2000-11-02 | RBDMS Rec |
Reached Total Depth | 2000-11-02 | RBDMS Rec |
Completion Report Received | 2000-11-24 | RBDMS Rec |
Construction Permit Expires | 2001-09-27 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2001-02-01 | 3792 | 3850 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2000 Bbl | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | CAMERON PRODUCTION CO INC | 1232 | 0 | 365 |
2002 | CAMERON PRODUCTION CO INC | 781 | 0 | 365 |
2003 | CAMERON PRODUCTION CO INC | 801 | 0 | 365 |
2004 | CAMERON PRODUCTION CO INC | 959 | 0 | 365 |
2005 | CAMERON PRODUCTION CO INC | 780 | 0 | 365 |
2006 | CAMERON PRODUCTION CO INC | 746 | 0 | 365 |
2007 | CAMERON PRODUCTION CO INC | 807 | 0 | 365 |
2008 | CAMERON PRODUCTION CO INC | 746 | 0 | 365 |
2009 | CAMERON PRODUCTION CO INC | 357 | 0 | 365 |
2010 | CAMERON PRODUCTION CO INC | 315 | 0 | 365 |
2011 | CAMERON PRODUCTION CO INC | 299 | 0 | 0 |
2012 | CAMERON PRODUCTION CO INC | 352 | 0 | 366 |
2013 | CAMERON PRODUCTION CO INC | 564 | 0 | 365 |
2014 | CAMERON PRODUCTION CO INC | 424 | 0 | 365 |
2015 | CAMERON PRODUCTION CO INC | 455 | 0 | 365 |
2016 | CAMERON PRODUCTION CO INC | 542 | 0 | 365 |
2017 | CAMERON PRODUCTION CO INC | 434 | 0 | 365 |
2018 | CAMERON PRODUCTION CO INC | 479 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2002 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2003 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2004 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2005 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2006 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2007 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2008 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2009 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2010 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2011 | CAMERON PRODUCTION CO INC | Brine | 0 | |
2012 | CAMERON PRODUCTION CO INC | Brine | 0 | 366 |
2013 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2014 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2015 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2016 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2017 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
2018 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
001269i130 | 2000-10-30 | Drill / Deepen / Reopen | No Violations | Suface job, 8 5/8 ran to 699ft. , used 180sks of cement. |
0017335361 | 2007-01-22 | Production Wells | No Violations | Producing |
0219989285 | 2003-12-01 | Production Wells | No Violations | |
1106615477 | 2008-12-03 | Production Wells | No Violations | Producing, no ID. Camerons will put ID on in Spring when it warms up. I put info on tank in paint stick. No other problems noted. |
iDIAN00613 | 2001-07-23 | Preliminary Restoration | No Violations |
For data sources see[9]