X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28293

Well Details

Well ID: 34-119-28293
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Washington Township
Operator Name: CAMERON PRODUCTION CO INC
Well Pad ID:
Farm/Lease Name: SEIBERT
License Status: Producing
License Date: 2000-09-27
Spud Date: 2000-10-28
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2000-11-02
Well Total Depth: 3970 ft
Configuration: Vertical
Latitude: 40.013927924
Longitude: -81.93925717

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2000-09-27 Proposed Formations:CLINTON, Issued Date:9/27/00, Expired Date:9/27/01 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2000-10-28 RBDMS Rec
Completed 2000-11-02 RBDMS Rec
Reached Total Depth 2000-11-02 RBDMS Rec
Completion Report Received 2000-11-24 RBDMS Rec
Construction Permit Expires 2001-09-27 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2001-02-01 3792 3850 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2000 Bbl 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2001 CAMERON PRODUCTION CO INC 1232 0 365
2002 CAMERON PRODUCTION CO INC 781 0 365
2003 CAMERON PRODUCTION CO INC 801 0 365
2004 CAMERON PRODUCTION CO INC 959 0 365
2005 CAMERON PRODUCTION CO INC 780 0 365
2006 CAMERON PRODUCTION CO INC 746 0 365
2007 CAMERON PRODUCTION CO INC 807 0 365
2008 CAMERON PRODUCTION CO INC 746 0 365
2009 CAMERON PRODUCTION CO INC 357 0 365
2010 CAMERON PRODUCTION CO INC 315 0 365
2011 CAMERON PRODUCTION CO INC 299 0 0
2012 CAMERON PRODUCTION CO INC 352 0 366
2013 CAMERON PRODUCTION CO INC 564 0 365
2014 CAMERON PRODUCTION CO INC 424 0 365
2015 CAMERON PRODUCTION CO INC 455 0 365
2016 CAMERON PRODUCTION CO INC 542 0 365
2017 CAMERON PRODUCTION CO INC 434 0 365
2018 CAMERON PRODUCTION CO INC 479 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2001 CAMERON PRODUCTION CO INC Brine 0 365
2002 CAMERON PRODUCTION CO INC Brine 0 365
2003 CAMERON PRODUCTION CO INC Brine 0 365
2004 CAMERON PRODUCTION CO INC Brine 0 365
2005 CAMERON PRODUCTION CO INC Brine 0 365
2006 CAMERON PRODUCTION CO INC Brine 0 365
2007 CAMERON PRODUCTION CO INC Brine 0 365
2008 CAMERON PRODUCTION CO INC Brine 0 365
2009 CAMERON PRODUCTION CO INC Brine 0 365
2010 CAMERON PRODUCTION CO INC Brine 0 365
2011 CAMERON PRODUCTION CO INC Brine 0
2012 CAMERON PRODUCTION CO INC Brine 0 366
2013 CAMERON PRODUCTION CO INC Brine 0 365
2014 CAMERON PRODUCTION CO INC Brine 0 365
2015 CAMERON PRODUCTION CO INC Brine 0 365
2016 CAMERON PRODUCTION CO INC Brine 0 365
2017 CAMERON PRODUCTION CO INC Brine 0 365
2018 CAMERON PRODUCTION CO INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
001269i130 2000-10-30 Drill / Deepen / Reopen No Violations Suface job, 8 5/8 ran to 699ft. , used 180sks of cement.
0017335361 2007-01-22 Production Wells No Violations Producing
0219989285 2003-12-01 Production Wells No Violations
1106615477 2008-12-03 Production Wells No Violations Producing, no ID. Camerons will put ID on in Spring when it warms up. I put info on tank in paint stick. No other problems noted.
iDIAN00613 2001-07-23 Preliminary Restoration No Violations

For data sources see[9]

References