If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-119-28293 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.01,"lon":-81.93,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Muskingum | |
| Municipality: Washington Township | |
| Operator Name: CAMERON PRODUCTION CO INC | |
| Well Pad ID: | |
| Farm/Lease Name: SEIBERT | |
| License Status: Producing | |
| License Date: 2000-09-27 | |
| Spud Date: 2000-10-28 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2000-11-02 | |
| Well Total Depth: 3970.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.010000 | |
| Longitude: -81.930000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2000-09-27 | Proposed Formations:CLINTON, Issued Date:9/27/00, Expired Date:9/27/01 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2000-10-28 | RBDMS Rec |
| Completed | 2000-11-02 | RBDMS Rec |
| Reached Total Depth | 2000-11-02 | RBDMS Rec |
| Completion Report Received | 2000-11-24 | RBDMS Rec |
| Construction Permit Expires | 2001-09-27 | RBDMS Rec |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2001-02-01 | 3792 | 3850 | 25 |
| 3792 | 3850 | 25 | |
| 3792 | 3850 | 25 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 2000 Bbl | 0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | CAMERON PRODUCTION CO INC | 1232.00 | 0.00 | 365 |
| 2002 | CAMERON PRODUCTION CO INC | 781.00 | 0.00 | 365 |
| 2003 | CAMERON PRODUCTION CO INC | 801.00 | 0.00 | 365 |
| 2004 | CAMERON PRODUCTION CO INC | 959.00 | 0.00 | 365 |
| 2005 | CAMERON PRODUCTION CO INC | 780.00 | 0.00 | 365 |
| 2006 | CAMERON PRODUCTION CO INC | 746.00 | 0.00 | 365 |
| 2007 | CAMERON PRODUCTION CO INC | 807.00 | 0.00 | 365 |
| 2008 | CAMERON PRODUCTION CO INC | 746.00 | 0.00 | 365 |
| 2009 | CAMERON PRODUCTION CO INC | 357.00 | 0.00 | 365 |
| 2010 | CAMERON PRODUCTION CO INC | 315.00 | 0.00 | 365 |
| 2011 | CAMERON PRODUCTION CO INC | 299.00 | 0.00 | 0 |
| 2012 | CAMERON PRODUCTION CO INC | 352.00 | 0.00 | 366 |
| 2013 | CAMERON PRODUCTION CO INC | 564.00 | 0.00 | 365 |
| 2014 | CAMERON PRODUCTION CO INC | 424.00 | 0.00 | 365 |
| 2015 | CAMERON PRODUCTION CO INC | 455.00 | 0.00 | 365 |
| 2016 | CAMERON PRODUCTION CO INC | 542.00 | 0.00 | 365 |
| 2017 | CAMERON PRODUCTION CO INC | 434.00 | 0.00 | 365 |
| 2018 | CAMERON PRODUCTION CO INC | 479.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2002 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2003 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2004 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2005 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2006 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2007 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2008 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2009 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2010 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2011 | CAMERON PRODUCTION CO INC | Brine | 0 | |
| 2012 | CAMERON PRODUCTION CO INC | Brine | 0 | 366 |
| 2013 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2014 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2015 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2016 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2017 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| 2018 | CAMERON PRODUCTION CO INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -17335361 | 2007-1-22 0:00: | PW | No Violations | |
| 001269i130 | 2000-10-30 | Drill / Deepen / Reopen | No Violations | Suface job, 8 5/8 ran to 699ft. , used 180sks of cement. |
| 0017335361 | 2007-01-22 | Production Wells | No Violations | Producing |
| 0219989285 | 2003-12-01 | Production Wells | No Violations | |
| 1106615477 | 2008-12-03 | Production Wells | No Violations | Producing, no ID. Camerons will put ID on in Spring when it warms up. I put info on tank in paint stick. No other problems noted. |
| 1269i130 | 2000-10-30 0:00 | DD | No Violations | |
| 219989285 | 2003-12-1 0:00: | PW | No Violations | |
| iDIAN00613 | 2001-07-23 | Preliminary Restoration | No Violations | |
| iDIAN006130 | 2001-7-23 0:00: | PL | No Violations |
For data sources see[9]