If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-20277 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.860615,"lon":-76.677019,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Springfield Township | |
Operator Name: EOG RESOURCES INC | |
Well Pad ID: 146991 | |
Farm/Lease Name: HARKNESS 2H | |
License Status: Active | |
Spud Date: 2010-02-23 | |
Permit Date: 2009-05-14 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.860615 | |
Longitude: -76.677019 |
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-02-19 | 2011-02-19 | 5421.00 | 4,538,184.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Ferrotrol 300L | Baker Hughes | Iron Control | |||||
Citric acid | 77-92-9 | 70.00 | 0.00811000 | |||||
Frac Sand (All Meshes) CWT | Baker Hughes | Proppant | Quartz | 14808-60-7 | 100.00 | 11.31 | ||
FRW-18 | Baker Hughes | Friction Reducer | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |||||
CI-14 | Baker Hughes | Corrosion Inhibitor | Olefin | 5.00 | 0.00007000 | |||
Propargyl alcohol | 107-19-7 | 5.00 | 0.00007000 | |||||
Polyoxyalkylenes | 30.00 | 0.00040000 | ||||||
Methanol | 67-56-1 | 100.00 | 0.00133000 | |||||
Fatty Acids | 10.00 | 0.00013000 | ||||||
Water | Operator | Carrier | ||||||
Water | 7732-18-5 | 100.00 | 86.84 | |||||
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Diethylene glycol | 111-46-6 | 5.00 | 0.00056000 | ||
Ethylene glycol | 107-21-1 | 45.00 | 0.00503000 | |||||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acidizing | Hydrochloric acid | 7647-01-0 | 15.00 | 0.26 | ||
Water | 7732-18-5 | 85.00 | 1.51 | |||||
Alpha 1427 | Baker Hughes | Biocide | Water | 7732-18-5 | 60.00 | 0.01 | ||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00705000 | |||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00164000 | |||||
Ethanol | 64-17-5 | 5.00 | 0.00117000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00235000 | |||||
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | EOG RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | EOG RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EOG RESOURCES INC | 715,333.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2012 | EOG RESOURCES INC | 836,370.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EOG RESOURCES INC | 558,699.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EOG RESOURCES INC | 412,557.32 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EOG RESOURCES INC | 317,020.33 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | EOG RESOURCES INC | 266,910.28 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | EOG RESOURCES INC | 229,104.37 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EOG RESOURCES INC | 195,194.37 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | EOG RESOURCES INC | 43,804.25 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | EOG RESOURCES INC | Drill Cuttings (in Tons) | 248.88 Tons | LANDFILL | 31346244 |
2011 | EOG RESOURCES INC | Produced Fluid (in Barrels) | 5,303.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EOG RESOURCES INC | Produced Fluid (in Barrels) | 254.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2012 | EOG RESOURCES INC | Produced Fluid (in Barrels) | 490.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EOG RESOURCES INC | Produced Fluid (in Barrels) | 94.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2013 | EOG RESOURCES INC | Produced Fluid (in Barrels) | 306.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EOG RESOURCES INC | Produced Fluid (in Barrels) | 345.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EOG RESOURCES INC | Produced Fluid (in Barrels) | 297.82 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | EOG RESOURCES INC | Produced Fluid (in Barrels) RWC 802 | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | EOG RESOURCES INC | Produced Fluid (in Barrels) RWC 802 | 116.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | EOG RESOURCES INC | Produced Fluid (in Barrels) RWC 802 | 28.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24462 |
2017 | EOG RESOURCES INC | Produced Fluid (in Barrels) RWC 802 | 126.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | EOG RESOURCES INC | Produced Fluid (in Barrels) RWC 802 | 129.00 Bbl | REUSE (AT WELL PAD) | |
2018 | EOG RESOURCES INC | Produced Fluid (in Barrels) RWC 802 | 254.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1871335 | Primary Facility | 2010-03-17 | Drilling/Alteration | Viol(s) Noted & Immediately Corrected | |
1947395 | Primary Facility | 2011-02-03 | Routine/Complete Inspection | No Violations Noted | Ran pipe to TD in preparation to perforate. Fracing expected to begin in approx. 3 weeks. |
1981278 | Primary Facility | 2011-06-02 | Routine/Complete Inspection | Violation(s) Noted | |
1993526 | Primary Facility | 2011-08-05 | Follow-up Inspection | Violation(s) Noted | |
1993633 | Primary Facility | 2011-07-07 | Follow-up Inspection | Violation(s) Noted | This is a follow-up. High conductivity puddles first noted in inspection report # 1981278. |
1997007 | Primary Facility | 2011-08-17 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2001692 | Primary Facility | 2011-09-07 | Follow-up Inspection | No Violations Noted | |
2169735 | Primary Facility | 2013-05-23 | Routine/Complete Inspection | No Violations Noted | |
2643635 | Primary Facility | 2017-10-04 | Routine/Complete Inspection | No Violations Noted | Routine inspection to assess overall site conditions. No issues noted and no violations cited. |
2715361 | Primary Facility | 2018-04-06 | Routine/Complete Inspection | No Violations Noted | Cold/snowy at time of inspection
No annulus cents present at time of inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1871335 | 583593 | 03/17/2010 | 2010-03-17 | 78.122 - Drillers Log not on site | Administrative | |
1981278 | 613771 | 06/02/2011 | 2011-06-02 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | On cut slope fronting onto well pad, there are large cracks and gashes where slope is slumping away. |
1981278 | 613772 | 06/02/2011 | 2011-06-02 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | At toe of slope on east side. trench has been breached, silt sock is not in place, stakes have been pulled out of ground and sediment is moving off site. |
1981278 | 613773 | 06/02/2011 | 2011-06-02 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | At toe of slope on east side. trench has been breached, silt sock is not in place, stakes have been pulled out of ground and sediment is moving off site. |
1993526 | 617043 | 08/05/2011 | 2011-08-05 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | Production fluid leak from containment onto well pad. |
1993526 | 617044 | 08/05/2011 | 2011-08-05 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | Production fluid leak from containment onto well pad. |
1993526 | 617045 | 08/05/2011 | 2011-08-05 | 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith | Administrative | No notification was attempted or made. |
1993526 | 617191 | 08/05/2011 | 2011-08-05 | 78.57 - Failure to post pit approval number | Administrative | Viol Type Description: Chapter 78.57(a) of the Rules and Regulations of the Environmental Quality Board |
For data sources see[7]