X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28367

Well Details

Well ID: 37-129-28367
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Derry Borough
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: D MERCURIO 001
License Status: Active
Spud Date: 2010-09-29
Permit Date: 2010-06-15
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.385111
Longitude: -79.381989

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 KRIEBEL MINERALS INC 45.00 31 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 4,862.00 334 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 2,414.00 333 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 1,724.00 324 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 1,437.00 323 32.00 323 0.00 0
2015 KRIEBEL MINERALS INC 1,542.00 323 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 991.00 324 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 906.00 264 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 588.00 235 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 KRIEBEL MINERALS INC Drilling Fluid Waste (in Barrels) 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 KRIEBEL MINERALS INC Drilling Fluid Waste (in Barrels) 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 KRIEBEL MINERALS INC Fracing Fluid Waste (in Barrels) 1,080.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 KRIEBEL MINERALS INC Produced Fluid (in Barrels) 28.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1920047 Primary Facility 2010-10-13 Routine/Complete Inspection No Violations Noted Site inspection was conducted just after drilling completed. Signage and E&S plan on site and reviewed. Drill pit remains meets minimum freeboard requirements. Perimeter E&S BMP¿s (silt fence and brush grub) in place and functioning adequately. Access road ok. No accelerated E&S issues noted at this time. *Site must be restored within 9 months of drill completion.
1923719 Primary Facility 2010-10-04 Drilling/Alteration No Violations Noted drilling/E&S ok/ID&pit ok
2013176 Primary Facility 2011-10-19 Routine/Complete Inspection No Violations Noted Site visit was conduct with April Weiland WQS and Mark Hopkins (Kriebel)

For data sources see[6]

References