If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28367 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.385111,"lon":-79.381989,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Borough | |
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: D MERCURIO 001 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-06-15 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.385111 | |
Longitude: -79.381989 |
Date | Event |
---|---|
2010-06-15 | New Permit Application |
2010-09-29 | Performed Spud Operation |
2010-10-04 | Drilling Completion |
2010-10-11 | Perforation |
2011-12-19 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | KRIEBEL MINERALS INC | 45.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2011 | KRIEBEL MINERALS INC | 4,862.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2012 | KRIEBEL MINERALS INC | 2,414.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2013 | KRIEBEL MINERALS INC | 1,724.00 | 324 | 0.00 | 0 | 0.00 | 0 |
2014 | KRIEBEL MINERALS INC | 1,437.00 | 323 | 32.00 | 323 | 0.00 | 0 |
2015 | KRIEBEL MINERALS INC | 1,542.00 | 323 | 0.00 | 0 | 0.00 | 0 |
2016 | KRIEBEL MINERALS INC | 991.00 | 324 | 0.00 | 0 | 0.00 | 0 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | 906.00 | 264 | 0.00 | 0 | 0.00 | 0 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | 588.00 | 235 | 0.00 | 0 | 0.00 | 0 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | 833.00 | 234 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | KRIEBEL MINERALS INC | Drilling Fluid Waste | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | KRIEBEL MINERALS INC | Fracing Fluid Waste | 1,080.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | KRIEBEL MINERALS INC | Drilling Fluid Waste | 440.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2012 | KRIEBEL MINERALS INC | Produced Fluid | 28.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 34 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 34.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 20.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1920047 | Primary Facility | 2010-10-13 | Routine/Complete Inspection | No Violations Noted | Site inspection was conducted just after drilling completed. Signage and E&S plan on site and reviewed. Drill pit remains meets minimum freeboard requirements. Perimeter E&S BMP¿s (silt fence and brush grub) in place and functioning adequately. Access road ok. No accelerated E&S issues noted at this time. *Site must be restored within 9 months of drill completion. |
1923719 | Primary Facility | 2010-10-04 | Drilling/Alteration | No Violations Noted | drilling/E&S ok/ID&pit ok |
2013176 | Primary Facility | 2011-10-19 | Routine/Complete Inspection | No Violations Noted | Site visit was conduct with April Weiland WQS and Mark Hopkins (Kriebel) |
For data sources see[7]