34-167-29721

Well Details

Well ID: 34-167-29721
Loading map...
Country: United States
State: Ohio
County: Washington
Municipality: Adams Township
Operator Name: UTICA RESOURCE OPERATING LLC
Well Pad ID: US-OH-000672
Farm/Lease Name: GARVIN
License Status: Plugged Back
License Date: 2013-04-17
Spud Date: 2013-05-07
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 39.562784187
Longitude: -81.50708188

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-03-12 Proposed Formations:POINT PLEASANT, Issued Date:3/12/2013, Expired Date:3/12/2015 12:00:00 PM, Drilling unit acres:517, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-04-17 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:4/17/2013, Expired Date:4/17/2015 12:00:00 PM, Drilling unit acres:517, Proposed Well Type:ST, Proposed Well Class:STRT
Plugged Back 2013-05-23
Construction Permit Expires 2015-04-17
Change of Owner 2018-05-04 Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC
Record Last Modified 2018-05-04

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/31/2013 08/10/2013 0 6,297,030.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 15% HCl, Slickwater, WF120, YF120 Schlumberger Corrosion Inhibitor, Bactericide (Myacide GA25), Scale Inhibitor, Surfactant , Acid, Breaker, Gelling Agent, Friction Reducer, Crosslinker, Iron Contr Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0.00654 0.00087 0
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 0.0032 0.00043 0
Phenolic resin 9003-35-4 0.19177 0.02556 0
Magnesium silicate hydrate (talc) 14807-96-6 0.00008000 0.00001000 0
Fatty acids, tall-oil 61790-12-3 0.00068 0.00009000 0
Potassium borate 1332-77-0 0.1629 0.02171 0
Water (Including Mix Water Supplied by Client)* NA 0 86.6735 0
Alkenes, C>10 a- 64743-02-8 0.00012 0.00002000 0
Potassium hydroxide 1310-58-3 0.06035 0.00804 0
Sodium erythorbate 6381-77-7 0.00142 0.00019 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0.00013 0.00002000 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0.00001000 0 0
Urea 57-13-6 0.00402 0.00054 0
Dimethyl siloxanes and silicones 63148-62-9 0.00006000 0.00001000 0
Polyethylene glycol monohexyl ether 31726-34-8 0.07293 0.00972 0
Propan-2-ol 67-63-0 0.00064 0.00009000 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Guar gum 9000-30-0 0.68349 0.09109 0
Diammonium peroxidisulphate 7727-54-0 0.0271 0.00361 0
poly(tetrafluoroethylene) 9002-84-0 0.00003000 0 0
Hydrogen chloride 7647-01-0 0.35883 0.04782 0
Ammonium sulfate 7783-20-2 0.05767 0.00769 0
Octamethylcyclotetrasiloxane 556-67-2 0.00001000 0 0
Non-crystalline silica 7631-86-9 0.00244 0.00033 0
Glutaraldehyde 111-30-8 0.04282 0.00571 0
Prop-2-yn-1-ol 107-19-7 0.00017 0.00002000 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0.00026 0.00003000 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0.00269 0.00036 0
Trisodium ortho phosphate 7601-54-9 0.00386 0.00051 0
Ethanol, 2,2',2-nitrilotris-,

1,1',1-tris(dihydrogen phosphate), sodium salt

68171-29-9 0.00877 0.00117 0
Glycerol 56-81-5 0.05312 0.00708 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.06102 0.00813 0
Crystalline silica 14808-60-7 98.2359 13.0914 0
Ethane-1,2-diol 107-21-1 0.0011 0.00015 0
Methanol 67-56-1 0.00092 0.00012 0
Sodium sulfate 7757-82-6 0.02493 0.00332 0
Sodium hydroxide 1310-73-2 0.00001000 0 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0.00056 0.00007000 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0

For data sources see[3]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 PDC ENERGY INC Brine 11525 84
2014 PDC ENERGY INC Brine 17801 286
2015 PDC ENERGY INC Brine 4961 347
2016 PDC ENERGY INC Brine 2687 311
2017 PDC ENERGY INC Brine 2659 345
2018 UTICA RESOURCE OPERATING LLC Brine 1096 273
2019 UTICA RESOURCE OPERATING LLC Brine 320 90

For data sources see[4] [5]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0031782615 2015-06-22 Production Wells No Violations Upon inspection, it was observed that this well is currently producing. The well is equipped with a standard production tree and is producing on the 5.5 production casing as well as the 2.875 tubing. Gauges on the well read 366 psi on the tubing and 507 psi on the casing. The tank battery consists of 6 400 bbl production tanks and 3 large mechanical separators. There is also 3 flow control separators on location as well as a large degassing tower. There is a metal, poly lined containment dike around the tank battery. Legible and correct ID information is present on the tanks as well as the entry to the lease road. No violations were observed.
0384235053 2013-05-29 Drill / Deepen / Reopen No Violations Total depth at the time of inspection was 11559 ft. The inclination was 89.66 degrees. The azimuth was 1.94 radians (349.2 degrees). Spoke with consultant on site.
0392223383 2014-07-14 Preliminary Restoration No Violations Upon inspection, it was observed that a vegetative cover has been established throughout the limits of disturbance for this pad location. Any and all drilling equipment has been removed from the location, and any and all pits used for drilling activities have been filled. This satisfies the requirements for the preliminary restoration. Accompanied on this inspection by DOGRM Engineer Jason Simmerman, and DOGRM Engineering Technicians Andy Thomas and Anthony Carson.
0428449238 2013-05-15 Drill / Deepen / Reopen No Violations Conducted status check on this drilling rig. Total depth was 4815 ft. I collected paperwork from the previous cement job, and spoke with Mr. David Gray on site.
0433926896 2017-11-27 Production Wells No Violations The inspection this day found that the well is producing using a plunger lift system. The valves are open on the wellhead and gas could be heard flowing through the well at the time of inspection. The tank battery for this well is equipped with six (6) 410 barrel tanks with identification posted near the tank battery. There are no issues to report and the well is in production.
0494573884 2016-01-26 Production Wells No Violations Upon inspection, it was observed that this well is currently in production. Pressure on the production tubing read 285 psi. No violations noted. I was accompanied on this inspection by DOGRM Emergency Response Coordinator Nathan Lane.
0674151958 2013-05-09 Drill / Deepen / Reopen No Violations Witnessed second half of surface cement job with Inspector Andy Thomas. Circulation established, good returns, pipe raised out of hole 8 feet and unable to set back down. 420 of 20 surface casing was set in 458 of 24 borehole.
0950932751 2013-05-31 Drill / Deepen / Reopen No Violations Received phone call from Mr. Larry Howell at 11:20 pm and he notified me of a drilling mud spill that came out of the flare line. When I arrived on site, crews were already cleaning up the mess. The majority of the drilling mud collected on the drilling pad in the stone. There is a plastic liner under the stone. All contaminated stone was collected and put in a dumpster of residual waste, and hauled to an EPA approved landfill. There was a mist of drilling mud that sprayed the grass outside of the drilling pad in an area 25 ft. long by 15 ft. wide. I spoke with Mr. Vaughn Staple about remedial work on this area. I gave him the options of either removing all contaminated materials and replacing them with clean materials or bio-remediation in place which means tilling the area up and adding lime and fertilizer or manure and working that into the soil. I checked with the consulting mud engineer and the drilling mud is 100% bio-degradable.
0970301995 2013-06-03 Drill / Deepen / Reopen No Violations Inspected remedial work after the drilling mud spill. All contaminated soil had been removed and properly disposed of. Fresh soil had been put in its place. Spoke with consultant on site. He also gave me paperwork for the 5.5 in. casing that they had ran and cemented.
1109395974 2014-07-14 Preliminary Restoration No Violations Upon inspection, it was observed that a vegetative cover has been established throughout the limits of disturbance for this pad location. Any and all drilling equipment has been removed from the location, and any and all pits used for drilling activities have been filled. This satisfies the requirements for the preliminary restoration. Accompanied on this inspection by DOGRM Engineer Jason Simmerman, and DOGRM Engineering Technicians Andy Thomas and Anthony Carson.
1148946949 2013-05-08 Drill / Deepen / Reopen No Violations Witnessed cementing of the surface casing. Good circulation and good returns were achieved. Universal did the cementing work. Pipe floated up out of the hole 8 ft. Bottom of pipe is at 420 ft.
1308184235 2013-08-26 Drill / Deepen / Reopen No Violations Observed coiled tubing unit getting set up to drill plugs out with the accompaniment of Mr. Rick Cisler and Mr. Kenny Brown. Spoke with company man from PDC and from Spartan coiled tubing services. They showed us the tools they will be using and gave us a run-down of how the job will be conducted.
1334184211 2013-08-05 Drill / Deepen / Reopen No Violations Witnessed the perforation and the fracing of one stage. Observed a sample of cross-link gel used as a carrier for proppant. Accompanied on inspection by permitting geologist Rick Cisler, Kenny Brown, and intern Andrew Destocki.
1368117385 2013-05-08 Drill / Deepen / Reopen No Violations Witnessed first half of surface cement job with Inspector Andy Thomas. Circulation established, good returns, pipe raised out of hole 8 feet and unable to set back down. 420 of 20 surface casing was set in 458 of 24 borehole.
1370263209 2013-05-22 Drill / Deepen / Reopen No Violations Stratigraphic test hole had been plugged back. Top of cement should be around 6950. Received paperwork and spoke with Mr. Dave Grey.
1370434370 2013-05-23 Administrative Inspection No Violations Received phone call from Dave Grey at 1:24 pm. He stated that the cement plug for the stratigraphic test hole had falled 200, and he will be placing 200 of cement on top of it to achieve a proper plug.
1411053385 2013-06-11 Drill / Deepen / Reopen No Violations I checked the remediated area outside of the drilling pad. It had been seeded and strawed. A crew was there smoothing the stone on the pad out. Well had a new well head installed on it.
1559913119 2013-04-15 Drill / Deepen / Reopen No Violations Witnessed the topping off of the conductor cement job. Conductor hole drilling crew was de-mobilizing and getting off of location very quickly after that.
1609620486 2013-12-13 Administrative Inspection No Violations Received phone call from Mr. Tony Long from PDC energy at 9:57 am. He stated that an oil trucker didnt get one of the valves completely shut on one of the production tanks and it released 10-15 barrels of oil into the containment around the production tanks. Their containment dike is lined and no oil escaped it. They will have it sucked out as soon as possible. I recommended him calling the EPA and notifying them of the spill but also making sure to tell them that is was completely contained.
1622109285 2013-04-11 Drill / Deepen / Reopen No Violations Met with Mr. Don Kreager at the site. He was waiting on surveyers to plot where the well stake went. They were also in the process of getting the conductor rig ready to drill in the conductor.
1665097544 2013-07-31 Drill / Deepen / Reopen No Violations Checked on site to see how close they were fracing. Pump trucks, blenders, and support vehicles were in place. Mega tanks were being filled with water and several 500 barrel tanks were being filled. Spoke with Don Kreager via cell phone and he stated that they were going to try and frac the next day.
1773851228 2013-05-31 Administrative Inspection No Violations I received a phone call at 12:55 pm from Randall Ferguson from PDCs Denver office in regards to the spill from the night before. He stated that there was a 10 barrel loss and that they removed all contaminated soil, disposed of it properly and replaced it with fresh soil.
2024051832 2013-06-17 Drill / Deepen / Reopen No Violations Company was performing pressure test on 5.5 in. casing. They pressured up to 5000 psi. Spoke with Mr. Blake Roush on site. I also looked at the above ground containment that will be used to store fluid for well stimulation.

For data sources see[6]