If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21324 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.359917464,"lon":-81.05963753,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Archer Township | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: US-OH-000814 | |
Farm/Lease Name: HELEN HALTER 23-11-5 | |
License Status: Producing | |
License Date: 2014-04-30 | |
Spud Date: 2014-05-15 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-11-02 | |
Well Total Depth: 17078 ft | |
Configuration: Horizontal | |
Latitude: 40.359917464 | |
Longitude: -81.05963753 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-04-30 | Proposed Formations:POINT PLEASANT, Issued Date:4/30/2014, Expired Date:4/29/2016 12:00:00 PM, Drilling unit acres:606.64, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2014-11-02 | |
Correction to Well | 2015-02-06 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-07-06 | |
Construction Permit Expires | 2016-04-29 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-07-06 | 8533 | 16850 | 750 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/04/2015 | 01/16/2015 | 8218 | 7,188,260.0 | 563124 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 84.5818 | 0 |
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Hexadec-1-ene | 629-73-2 | 0 | 0.00002000 | 0 | |
1-Octadecene (C18) | 112-88-9 | 0 | 0.00001000 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.02 | 0.00291 | 0 | ||||
Urea | 57-13-6 | 0 | 0.00034 | 0 | ||||
Copper(II) sulfate | 7758-98-7 | 0 | 0 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.03 | 0.00523 | 0 | ||||
Potassium chloride (impurity) | 7447-40-7 | 0.01 | 0.00106 | 0 | ||||
Calcium chloride | 10043-52-4 | 0.25 | 0.03768 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0 | 0.00072 | 0 | ||||
Non-crystalline silica (impurity) | 7631-86-9 | 0 | 0.00033 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.04 | 0.00568 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0 | 0.00043 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.00026 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0.00001000 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0 | 0.00058 | 0 | ||||
Siloxanes and Silicones, di-Me,
reaction products with silica |
67762-90-7 | 0 | 0 | 0 | ||||
Glycerol | 56-81-5 | 0.05 | 0.00748 | 0 | ||||
Formaldehyde | 50-00-0 | 0 | 0 | 0 | ||||
Sodium chloride (impurity) | 7647-14-5 | 0 | 0.00057 | 0 | ||||
Guar gum | 9000-30-0 | 0.66 | 0.10191 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.06 | 0.00847 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.05 | 0.00709 | 0 | ||||
Sodium sulfate | 7757-82-6 | 0 | 0.00008000 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.0001 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.00037 | 0 | ||||
Crystalline silica | 14808-60-7 | 98 | 15.0515 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0 | 0.00056 | 0 | ||||
Hydrochloric acid | 7647-01-0 | 0.72 | 0.11126 | 0 | ||||
Potassium borate | 1332-77-0 | 0.15 | 0.02293 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0 | 0 | ||||
Propargyl alcohol | 107-19-7 | 0 | 0.00007000 | 0 | ||||
Ethylene Glycol | 107-21-1 | 0 | 0.0002 | 0 | ||||
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen
phosphate), sodium salt |
68171-29-9 | 0.01 | 0.00163 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00001000 | 0 | ||||
2-propenamid | 79-06-1 | 0 | 0.00002000 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.00022 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00002000 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-01-16 | H2O | 8 | 725 Bbl | 330260 | Schlumberger | STAGE 30/30
25 SHOTS |
2015-01-04 | H2O | 15 | 1252 Bbl | 336910 | Schlumberger | STAGE 1/30
25 SHOTS STAGES 2-29 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 557900 | 23634 | 216 |
2016 | CHESAPEAKE EXPLORATION LLC | 481175 | 14720 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 323488 | 7625 | 344 |
2018 | CHESAPEAKE EXPLORATION LLC | 137038 | 3854 | 295 |
2019 | CHESAPEAKE EXPLORATION LLC | 48655 | 1349 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 19394 | 216 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 5082 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3245 | 344 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 6619 | 295 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 1847 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0271988729 | 2014-05-15 | Drill / Deepen / Reopen | No Violations | Rocky Mountain Drilling has a top hole rig on site to drill and set the conductor casing. Ready later today. |
0484561075 | 2014-10-27 | Casing String Witnessed | No Violations | The rig ran 2322 of 9-5/8 casing and the associated float equipment. Schlumberger cemented it with 870 sacks of Class A cement. Good cement was returned to the surface. See the casing ticket for the details. |
0574881462 | 2014-05-15 | Casing String Witnessed | No Violations | On the day of my inspection I found that Rocky Mountain Drilling had drilled a 26 hole to a depth of 120 with and auger rig. They ran new 20 conductor casing to 120. Universal Well Services cemented the casing to surface with 245 sacks of class A cement. There were approximately 12 barrels of cement circulated to the surface. |
1208825130 | 2016-01-11 | Preliminary Restoration | No Violations | On the day of my inspection, I witnessed the well was equipped with a production tree. Production equipment for the well included a sand trap and a gas production unit. Production equipment that was shared with permitted wells 34067212010000, 34067212020000, 34067212030000, 34067212040000, 34067212050000, 3406721206000, and 34067213250000 included a vapor recovery system, a gas compressor, a flare stack and 12-400 bbl. tanks that where placed inside proper containment. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1341306860 | 2014-10-31 | Drill / Deepen / Reopen | No Violations | At 10766 and tripping back into the hole after a bottom hole assembly change. No problems were noted at the time of the inspection. |
1414391804 | 2014-10-25 | Casing String Witnessed | No Violations | The rig ran 591 of 13-3/8 casing and the associated float equipment. Schlumberger cemented it with 580sacks of Class A cement. Good cement was returned to the surface. See the casing ticket for the details. |
1712413964 | 2016-02-19 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. With the exception of permitted well no. 34067212030000, which is utilizing a plunger lift system to produce. RBDMS production records indicate that the well is in producing order.
The production equipment on the pad consists of the following: 12 400 bbl. Production tanks 8 Producing wells 8 Sand separators 1 Horizontal heater-treater that was disconnected 1 combustor 1 low pressure separator/ Vapor recovery system 1 compressor There was approximately 2 to 3 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
For data sources see[10]