If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-23190 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.012727092,"lon":-80.54337068,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Poland Township | |
Operator Name: HILCORP ENERGY COMPANY | |
Well Pad ID: US-OH-000621 | |
Farm/Lease Name: POLAND-CLL1 | |
License Status: Cancelled | |
License Date: 2013-05-09 | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Horizontal | |
Latitude: 41.012727092 | |
Longitude: -80.54337068 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-09 | Proposed Formations:POINT PLEASANT, Issued Date:5/9/2013, Expired Date:5/9/2015 12:00:00 PM, Drilling unit acres:2474.17, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-05-24 | CORRECTION TO TARGET X COORDINATE. |
Construction Permit Expires | 2014-05-09 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1235729841 | 2016-01-26 | Production Wells | No Violations | DOGRM Staff Fred Romeo and I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. This is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Well is shut in do to swab tools were dropped down the well waiting on service rig. |
1374363322 | 2013-07-19 | Casing String Witnessed | No Violations | I was onsite to witness the cementing of the 3H conductor for this well. There were 2 conductors cemented on this location during the day. This cement job went as planned and cement was circulated to surface. A total of 6 wells will be located on this drilling pad. |
1689414237 | 2015-08-21 | Production Wells | No Violations | I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
For data sources see[3]