X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23190

Well Details

Well ID: 34-099-23190
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Poland Township
Operator Name: HILCORP ENERGY COMPANY
Well Pad ID: US-OH-000621
Farm/Lease Name: POLAND-CLL1
License Status: Cancelled
License Date: 2013-05-09
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Horizontal
Latitude: 41.010000
Longitude: -80.540000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-09 Proposed Formations:POINT PLEASANT, Issued Date:5/9/2013, Expired Date:5/9/2015 12:00:00 PM, Drilling unit acres:2474.17, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-05-24 CORRECTION TO TARGET X COORDINATE.
Construction Permit Expires 2014-05-09
Record Last Modified 2017-02-10

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1689414237 2015-8-21 0:00: PW No Violations 1.00
1235729841 2016-01-26 Production Wells No Violations DOGRM Staff Fred Romeo and I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. This is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Well is shut in do to swab tools were dropped down the well waiting on service rig.
1374363322 2013-07-19 Casing String Witnessed No Violations I was onsite to witness the cementing of the 3H conductor for this well. There were 2 conductors cemented on this location during the day. This cement job went as planned and cement was circulated to surface. A total of 6 wells will be located on this drilling pad.
1689414237 2015-08-21 Production Wells No Violations I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time.

For data sources see[3]

References