X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264031604002

Well Details

Well ID: 0264031604002
Loading map...
Location: 00/04-16-026-03W4/2
Location Alias: 00/04-16-26-03 W4M
Location Alias 2: 00/04-16-026-03 W4/02
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 03
Section: 16
County/Municipality: Municipal District of Acadia No. 34
Well Name: SURGE ENERGY CAPRON 4-16-26-3
Operator Name: Surge Energy Inc.
License Number: 0143024
License Date: 1990-01-30
License Status: Abandoned
Spud Date: 1990-01-31
Final Drill Date: 1990-02-04
Well Total Depth: 979.00 m
Surface Hole Latitude: 51.215849
Surface Hole Longitude: -110.375732

For data sources see[1][2]

Well History

Date Event
1990-01-30 Obtained License
1990-02-01 Surface Casing Operation Performed
1990-02-04 Finished Drilling
1990-02-04 Well Mode changed to Drilled and Cased
1990-02-05 Drill Stem Test Performed
1990-02-05 Well Log Performed
1990-02-06 Drill Stem Test Performed
1990-02-07 Production Casing Operation Performed
1990-02-07 Rig Released
1990-02-10 Perforation Treatment Performed - Jet Perforation
1990-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-11 Well Log Performed
1990-02-13 Perforation Treatment Performed - Jet Perforation
1990-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-14 Well Log Performed
1990-02-17 Perforation Treatment Performed - Cement Squeeze
1990-02-20 Perforation Treatment Performed - Jet Perforation
1990-02-20 Well Log Performed
1990-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-26 Perforation Treatment Performed - Cement Squeeze
1990-03-01 Perforation Treatment Performed - Jet Perforation
1990-03-01 Well Log Performed
1990-03-02 Perforation Treatment Performed - Fractured
1994-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-28 Perforation Treatment Performed - Jet Perforation
1994-08-28 Plug Back Performed
1994-09-02 Well Began Production
1994-09-02 Well Fluid changed to Gas
1994-09-02 Well Mode changed to Flowing
1996-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-23 Perforation Treatment Performed - Jet Perforation
1996-04-23 Plug Back Performed
1996-04-23 Well Fluid changed to Gas
1996-04-23 Well Mode changed to Abandoned Zone
2000-11-28 Well Abandoned
2000-11-28 Well Fluid changed to Gas
2000-11-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-10 Perforation 918.00 921.00 13
1990-02-10 Perforation 923.50 925.00 13
1990-02-11 Acid Treatment 918.00 925.00 0
1990-02-13 Perforation 914.00 915.00 13
1990-02-14 Acid Treatment 914.00 915.00 0
1990-02-17 Cement Squeeze 914.00 925.00 0
1990-02-20 Perforation 902.50 903.50 13
1990-02-20 Perforation 904.50 905.50 13
1990-02-20 Perforation 907.00 908.00 13
1990-02-24 Acid Treatment 902.50 908.00 0
1990-02-26 Cement Squeeze 902.50 908.00 0
1990-03-01 Perforation 902.50 903.50 13
1990-03-01 Perforation 904.50 905.50 13
1990-03-01 Perforation 907.00 907.50 13
1990-03-02 Fracture 902.50 907.50 0
1994-08-28 Packing Device Capped w/Cement 887.00 895.00 0
1994-08-28 Perforation 739.50 741.00 13
1996-04-23 Packing Device Capped w/Cement 728.00 736.00 0
1996-04-23 Perforation 291.00 292.00 13
1996-04-23 Packing Device Capped w/Cement 280.00 288.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2641 0.0 0.0 0.0
1995 8293 0.0 0.0 0.0
1996 1895 0.0 0.0 0.0

For data sources see[5]

References