If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264031604002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.215849,"lon":-110.375732,"icon":""}]} |
Location: 00/04-16-026-03W4/2 | |
Location Alias: 00/04-16-26-03 W4M | |
Location Alias 2: 00/04-16-026-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 03 | |
Section: 16 | |
County/Municipality: Municipal District of Acadia No. 34 | |
Well Name: SURGE ENERGY CAPRON 4-16-26-3 | |
Operator Name: Surge Energy Inc. | |
License Number: 0143024 | |
License Date: 1990-01-30 | |
License Status: Abandoned | |
Spud Date: 1990-01-31 | |
Final Drill Date: 1990-02-04 | |
Well Total Depth: 979.00 m | |
Surface Hole Latitude: 51.215849 | |
Surface Hole Longitude: -110.375732 |
Date | Event |
---|---|
1990-01-30 | Obtained License |
1990-02-01 | Surface Casing Operation Performed |
1990-02-04 | Finished Drilling |
1990-02-04 | Well Mode changed to Drilled and Cased |
1990-02-05 | Drill Stem Test Performed |
1990-02-05 | Well Log Performed |
1990-02-06 | Drill Stem Test Performed |
1990-02-07 | Production Casing Operation Performed |
1990-02-07 | Rig Released |
1990-02-10 | Perforation Treatment Performed - Jet Perforation |
1990-02-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-11 | Well Log Performed |
1990-02-13 | Perforation Treatment Performed - Jet Perforation |
1990-02-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-14 | Well Log Performed |
1990-02-17 | Perforation Treatment Performed - Cement Squeeze |
1990-02-20 | Perforation Treatment Performed - Jet Perforation |
1990-02-20 | Well Log Performed |
1990-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-26 | Perforation Treatment Performed - Cement Squeeze |
1990-03-01 | Perforation Treatment Performed - Jet Perforation |
1990-03-01 | Well Log Performed |
1990-03-02 | Perforation Treatment Performed - Fractured |
1994-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-08-28 | Perforation Treatment Performed - Jet Perforation |
1994-08-28 | Plug Back Performed |
1994-09-02 | Well Began Production |
1994-09-02 | Well Fluid changed to Gas |
1994-09-02 | Well Mode changed to Flowing |
1996-04-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-04-23 | Perforation Treatment Performed - Jet Perforation |
1996-04-23 | Plug Back Performed |
1996-04-23 | Well Fluid changed to Gas |
1996-04-23 | Well Mode changed to Abandoned Zone |
2000-11-28 | Well Abandoned |
2000-11-28 | Well Fluid changed to Gas |
2000-11-28 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-02-10 | Perforation | 918.00 | 921.00 | 13 |
1990-02-24 | Acid Treatment | 902.50 | 908.00 | 0 |
1990-02-26 | Cement Squeeze | 902.50 | 908.00 | 0 |
1990-03-01 | Perforation | 902.50 | 903.50 | 13 |
1990-03-01 | Perforation | 904.50 | 905.50 | 13 |
1990-03-01 | Perforation | 907.00 | 907.50 | 13 |
1990-03-02 | Fracture | 902.50 | 907.50 | 0 |
1994-08-28 | Packing Device Capped w/Cement | 887.00 | 895.00 | 0 |
1994-08-28 | Perforation | 739.50 | 741.00 | 13 |
1996-04-23 | Packing Device Capped w/Cement | 728.00 | 736.00 | 0 |
1996-04-23 | Perforation | 291.00 | 292.00 | 13 |
1990-02-10 | Perforation | 923.50 | 925.00 | 13 |
1996-04-23 | Packing Device Capped w/Cement | 280.00 | 288.00 | 0 |
1990-02-11 | Acid Treatment | 918.00 | 925.00 | 0 |
1990-02-13 | Perforation | 914.00 | 915.00 | 13 |
1990-02-14 | Acid Treatment | 914.00 | 915.00 | 0 |
1990-02-17 | Cement Squeeze | 914.00 | 925.00 | 0 |
1990-02-20 | Perforation | 902.50 | 903.50 | 13 |
1990-02-20 | Perforation | 904.50 | 905.50 | 13 |
1990-02-20 | Perforation | 907.00 | 908.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 2641 | 0.0 | 0.0 | 0.0 |
1995 | 8293 | 0.0 | 0.0 | 0.0 |
1996 | 1895 | 0.0 | 0.0 | 0.0 |
For data sources see[5]