X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285011410000

Well Details

Well ID: 0285011410000
Loading map...
Location: 00/10-14-028-01W5/0
Location Alias: 00/10-14-28-01 W5M
Location Alias 2: 00/10-14-028-01 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 01
Section: 14
County/Municipality: Rocky View County
Well Name: TRANSCAN PPL CROSSE 10-14-28-1
Operator Name: TransCanada Energy Ltd.
License Number: 0030680
License Date: 1966-07-08
License Status: Suspension
Spud Date: 1966-07-10
Final Drill Date: 1966-08-17
Well Total Depth: 2763.00 m
Surface Hole Latitude: 51.395255
Surface Hole Longitude: -114.036016

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-08 Obtained License
1966-08-11 Production Casing Operation Performed
1966-08-14 Well Log Performed
1966-08-17 Finished Drilling
1966-08-17 Perforation Treatment Performed - Open-Hole Completion
1966-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-12-15 Well Mode changed to Drilled and Cased
1968-06-20 Well Began Production
1968-06-20 Well Fluid changed to Gas
1968-06-20 Well Mode changed to Flowing
1969-06-26 Perforation Treatment Performed - Jet Perforation
1969-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-01-28 Perforation Treatment Performed - Cement Plug
1971-01-28 Well Fluid changed to Gas
1971-01-28 Well Mode changed to Abandoned Zone
1971-01-30 Perforation Treatment Performed - Jet Perforation
1971-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-02-01 Plug Back Performed
1971-02-11 Perforation Treatment Performed - Jet Perforation
1971-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-24 Well Log Performed
2015-08-21 Well Log Performed
2015-10-20 Liner Casing Operation Performed
2017-09-20 Perforation Treatment Performed - Cement Plug
2017-09-20 Perforation Treatment Performed - Cement Squeeze
2017-09-20 Plug Back Performed
2017-09-21 Perforation Treatment Performed - Jet Perforation
2017-09-22 Perforation Treatment Performed - Cement Plug
2017-09-22 Perforation Treatment Performed - Cement Squeeze
2017-09-22 Plug Back Performed
2017-09-23 Perforation Treatment Performed - Cement Plug
2017-09-23 Perforation Treatment Performed - Cement Squeeze
2017-09-23 Perforation Treatment Performed - Jet Perforation
2017-09-23 Plug Back Performed
2017-09-24 Perforation Treatment Performed - Cement Plug
2017-09-24 Perforation Treatment Performed - Cement Squeeze
2017-09-24 Perforation Treatment Performed - Jet Perforation
2017-09-24 Plug Back Performed
2017-09-25 Perforation Treatment Performed - Cement Plug
2017-09-25 Perforation Treatment Performed - Cement Squeeze
2017-09-25 Perforation Treatment Performed - Jet Perforation
2017-09-25 Plug Back Performed
2017-09-26 Perforation Treatment Performed - Cement Plug
2017-09-26 Perforation Treatment Performed - Cement Squeeze
2017-09-26 Perforation Treatment Performed - Jet Perforation
2017-09-26 Plug Back Performed
2017-09-27 Perforation Treatment Performed - Cement Plug
2017-09-27 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-17 Open Hole/Barefoot Completion 2726.40 2763.00 0
1966-10-23 Acid Treatment 2726.40 2763.00 0
1966-10-29 Acid Treatment 2726.40 2763.00 0
1969-06-26 Perforation 2729.80 2731.00 26
1969-07-25 Acid Treatment 2729.80 2731.00 0
1971-01-28 Cement Plug 2674.60 2749.90 0
1971-01-30 Perforation 2328.70 2334.20 7
1971-01-30 Perforation 2341.50 2342.70 7
1971-01-30 Perforation 2344.20 2344.50 7
1971-02-01 Acid Treatment 2328.70 2344.50 0
1971-02-01 Packing Device Capped w/Cement 2666.09 2674.60 0
1971-02-11 Perforation 2322.00 2323.20 7
1971-02-12 Acid Treatment 2322.00 2323.20 0
2017-09-20 Cement Squeeze 2322.00 2344.50 0
2017-09-20 Cement Plug 2308.00 2666.10 0
2017-09-20 Cement Plug 2006.00 2308.00 0
2017-09-21 Perforation 1425.00 1426.00 20
2017-09-21 Perforation 1399.00 1400.00 17
2017-09-22 Cement Squeeze 1399.00 1426.00 0
2017-09-22 Cement Plug 1216.80 1410.00 0
2017-09-23 Perforation 1058.00 1059.00 17
2017-09-23 Perforation 1030.00 1031.00 17
2017-09-23 Cement Squeeze 1030.00 1059.00 0
2017-09-23 Cement Plug 945.60 1045.60 0
2017-09-24 Perforation 616.00 617.00 17
2017-09-24 Perforation 516.00 517.00 17
2017-09-24 Cement Squeeze 516.00 617.00 0
2017-09-24 Cement Plug 535.60 609.50 0
2017-09-25 Perforation 513.00 514.00 17
2017-09-25 Perforation 450.00 451.00 17
2017-09-25 Cement Squeeze 450.00 514.00 0
2017-09-25 Cement Plug 429.50 509.50 0
2017-09-26 Perforation 385.00 386.00 17
2017-09-26 Perforation 280.00 281.00 17
2017-09-26 Cement Squeeze 280.00 386.00 0
2017-09-26 Cement Plug 319.90 380.30 0
2017-09-27 Cement Plug 221.90 275.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1968 1033 0.0 0.0 0.0
1969 6230 0.0 0.0 0.0
1970 3551 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-15 No Incident Encountered 0.00 0.00
2017-09-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References