If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0285011410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.395255,"lon":-114.036016,"icon":""}]} |
Location: 00/10-14-028-01W5/0 | |
Location Alias: 00/10-14-28-01 W5M | |
Location Alias 2: 00/10-14-028-01 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 5 | |
Range: 01 | |
Section: 14 | |
County/Municipality: Rocky View County | |
Well Name: TRANSCAN PPL CROSSE 10-14-28-1 | |
Operator Name: TransCanada Energy Ltd. | |
License Number: 0030680 | |
License Date: 1966-07-08 | |
License Status: Suspension | |
Spud Date: 1966-07-10 | |
Final Drill Date: 1966-08-17 | |
Well Total Depth: 2763.00 m | |
Surface Hole Latitude: 51.395255 | |
Surface Hole Longitude: -114.036016 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-07-08 | Obtained License |
1966-08-11 | Production Casing Operation Performed |
1966-08-14 | Well Log Performed |
1966-08-17 | Finished Drilling |
1966-08-17 | Perforation Treatment Performed - Open-Hole Completion |
1966-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-12-15 | Well Mode changed to Drilled and Cased |
1968-06-20 | Well Began Production |
1968-06-20 | Well Fluid changed to Gas |
1968-06-20 | Well Mode changed to Flowing |
1969-06-26 | Perforation Treatment Performed - Jet Perforation |
1969-07-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1971-01-28 | Perforation Treatment Performed - Cement Plug |
1971-01-28 | Well Fluid changed to Gas |
1971-01-28 | Well Mode changed to Abandoned Zone |
1971-01-30 | Perforation Treatment Performed - Jet Perforation |
1971-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1971-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1971-02-01 | Plug Back Performed |
1971-02-11 | Perforation Treatment Performed - Jet Perforation |
1971-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-24 | Well Log Performed |
2015-08-21 | Well Log Performed |
2015-10-20 | Liner Casing Operation Performed |
2017-09-20 | Perforation Treatment Performed - Cement Plug |
2017-09-20 | Perforation Treatment Performed - Cement Squeeze |
2017-09-20 | Plug Back Performed |
2017-09-21 | Perforation Treatment Performed - Jet Perforation |
2017-09-22 | Perforation Treatment Performed - Cement Plug |
2017-09-22 | Perforation Treatment Performed - Cement Squeeze |
2017-09-22 | Plug Back Performed |
2017-09-23 | Perforation Treatment Performed - Cement Plug |
2017-09-23 | Perforation Treatment Performed - Cement Squeeze |
2017-09-23 | Perforation Treatment Performed - Jet Perforation |
2017-09-23 | Plug Back Performed |
2017-09-24 | Perforation Treatment Performed - Cement Plug |
2017-09-24 | Perforation Treatment Performed - Cement Squeeze |
2017-09-24 | Perforation Treatment Performed - Jet Perforation |
2017-09-24 | Plug Back Performed |
2017-09-25 | Perforation Treatment Performed - Cement Plug |
2017-09-25 | Perforation Treatment Performed - Cement Squeeze |
2017-09-25 | Perforation Treatment Performed - Jet Perforation |
2017-09-25 | Plug Back Performed |
2017-09-26 | Perforation Treatment Performed - Cement Plug |
2017-09-26 | Perforation Treatment Performed - Cement Squeeze |
2017-09-26 | Perforation Treatment Performed - Jet Perforation |
2017-09-26 | Plug Back Performed |
2017-09-27 | Perforation Treatment Performed - Cement Plug |
2017-09-27 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-08-17 | Open Hole/Barefoot Completion | 2726.40 | 2763.00 | 0 |
1971-02-01 | Acid Treatment | 2328.70 | 2344.50 | 0 |
1971-02-01 | Packing Device Capped w/Cement | 2666.09 | 2674.60 | 0 |
1971-02-11 | Perforation | 2322.00 | 2323.20 | 7 |
1971-02-12 | Acid Treatment | 2322.00 | 2323.20 | 0 |
2017-09-20 | Cement Squeeze | 2322.00 | 2344.50 | 0 |
2017-09-20 | Cement Plug | 2308.00 | 2666.10 | 0 |
2017-09-20 | Cement Plug | 2006.00 | 2308.00 | 0 |
2017-09-21 | Perforation | 1425.00 | 1426.00 | 20 |
2017-09-21 | Perforation | 1399.00 | 1400.00 | 17 |
2017-09-22 | Cement Squeeze | 1399.00 | 1426.00 | 0 |
1966-10-23 | Acid Treatment | 2726.40 | 2763.00 | 0 |
2017-09-22 | Cement Plug | 1216.80 | 1410.00 | 0 |
2017-09-23 | Perforation | 1058.00 | 1059.00 | 17 |
2017-09-23 | Perforation | 1030.00 | 1031.00 | 17 |
2017-09-23 | Cement Squeeze | 1030.00 | 1059.00 | 0 |
2017-09-23 | Cement Plug | 945.60 | 1045.60 | 0 |
2017-09-24 | Perforation | 616.00 | 617.00 | 17 |
2017-09-24 | Perforation | 516.00 | 517.00 | 17 |
2017-09-24 | Cement Squeeze | 516.00 | 617.00 | 0 |
2017-09-24 | Cement Plug | 535.60 | 609.50 | 0 |
2017-09-25 | Perforation | 513.00 | 514.00 | 17 |
1966-10-29 | Acid Treatment | 2726.40 | 2763.00 | 0 |
2017-09-25 | Perforation | 450.00 | 451.00 | 17 |
2017-09-25 | Cement Squeeze | 450.00 | 514.00 | 0 |
2017-09-25 | Cement Plug | 429.50 | 509.50 | 0 |
2017-09-26 | Perforation | 385.00 | 386.00 | 17 |
2017-09-26 | Perforation | 280.00 | 281.00 | 17 |
2017-09-26 | Cement Squeeze | 280.00 | 386.00 | 0 |
2017-09-26 | Cement Plug | 319.90 | 380.30 | 0 |
2017-09-27 | Cement Plug | 221.90 | 275.50 | 0 |
1969-06-26 | Perforation | 2729.80 | 2731.00 | 26 |
1969-07-25 | Acid Treatment | 2729.80 | 2731.00 | 0 |
1971-01-28 | Cement Plug | 2674.60 | 2749.90 | 0 |
1971-01-30 | Perforation | 2328.70 | 2334.20 | 7 |
1971-01-30 | Perforation | 2341.50 | 2342.70 | 7 |
1971-01-30 | Perforation | 2344.20 | 2344.50 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1033 | 0.0 | 0.0 | 0.0 |
1969 | 6230 | 0.0 | 0.0 | 0.0 |
1970 | 3551 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-12-15 | No Incident Encountered | 0.00 | 0.00 |
2017-09-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]