If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014210701000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.027359,"lon":-112.804377,"icon":""}]} |
Location: 00/01-07-001-21W4/0 | |
Location Alias: 00/01-07-01-21 W4M | |
Location Alias 2: 00/01-07-001-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 21 | |
Section: 07 | |
County/Municipality: Cardston County | |
Well Name: ROCKEAST HZ 100 DELBON 1-7-1-21 | |
Operator Name: Rockeast Energy Corp. | |
License Number: 0484654 | |
License Date: 2017-07-24 | |
License Status: Amended | |
Spud Date: 2017-08-11 | |
Final Drill Date: 2017-08-22 | |
Well Total Depth: 3236.00 m | |
Surface Hole Latitude: 49.027359 | |
Surface Hole Longitude: -112.804377 |
Date | Event |
---|---|
2017-07-24 | Obtained License |
2017-08-12 | Surface Casing Operation Performed |
2017-08-14 | Direction Drilling Operation Performed - Deviate |
2017-08-15 | Direction Drilling Operation Performed - Horizontal |
2017-08-15 | Well Log Performed |
2017-08-17 | Intermediate Casing Operation Performed |
2017-08-22 | Finished Drilling |
2017-08-22 | Well Log Performed |
2017-08-22 | Well Mode changed to Drilled and Cased |
2017-08-23 | Rig Released |
2017-08-28 | Perforation Treatment Performed - Open-Hole Completion |
2017-09-15 | Well Began Production |
2017-09-15 | Well Fluid changed to Crude Oil |
2017-09-15 | Well Mode changed to Pumping |
2017-11-03 | Perforation Treatment Performed - Cement Plug |
2017-11-03 | Plug Back Performed |
2017-11-03 | Well Fluid changed to Crude Oil |
2017-11-03 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2017-08-14 | 1356.50 | Deviate (5 - 79 degrees) |
2017-08-15 | 1673.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-08-28 | Open Hole/Barefoot Completion | 1697.00 | 3236.00 | 0 |
2017-11-03 | Cement Plug | 1833.00 | 2050.00 | 0 |
2017-11-03 | Cement Plug | 1600.00 | 1833.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 885 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-08-22 | No Incident Encountered | 0.00 | 0.00 |
2017-09-14 | No Incident Encountered | 0.00 | 0.00 |
2017-11-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]