If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014211906002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.058996,"lon":-112.804066,"icon":""}]} |
Location: 00/06-19-001-21W4/2 | |
Location Alias: 00/06-19-01-21 W4M | |
Location Alias 2: 00/06-19-001-21 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 21 | |
Section: 19 | |
County/Municipality: Cardston County | |
Well Name: COGL HZ DELBON 6-19-1-21 | |
Operator Name: Rockeast Energy Corp. | |
License Number: 0437695 | |
License Date: 2011-10-16 | |
License Status: Amended | |
Spud Date: 2011-11-11 | |
Final Drill Date: 2011-12-12 | |
Well Total Depth: 2670.00 m | |
Surface Hole Latitude: 49.058996 | |
Surface Hole Longitude: -112.804066 |
Date | Event |
---|---|
2011-10-16 | Obtained License |
2011-11-14 | Surface Casing Operation Performed |
2011-11-24 | Well Log Performed |
2011-11-25 | Direction Drilling Operation Performed - Horizontal |
2011-12-01 | Well Log Performed |
2011-12-02 | Well Log Performed |
2011-12-04 | Intermediate Casing Operation Performed |
2011-12-12 | Finished Drilling |
2011-12-12 | Perforation Treatment Performed - Open-Hole Completion |
2011-12-12 | Well Log Performed |
2011-12-12 | Well Mode changed to Drilled and Cased |
2011-12-13 | Rig Released |
2013-03-14 | Well Began Production |
2013-03-14 | Well Fluid changed to Crude Oil |
2013-03-14 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-25 | 1300.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-12 | Open Hole/Barefoot Completion | 1854.00 | 2670.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 6758 | 0.0 | 0.0 | 0.0 |
2014 | 8558 | 0.0 | 0.0 | 0.0 |
2015 | 8428 | 0.0 | 0.0 | 0.0 |
2016 | 8766 | 0.0 | 0.0 | 0.0 |
2017 | 8565 | 0.0 | 0.0 | 0.0 |
2018 | 8664 | 0.0 | 0.0 | 0.0 |
2019 | 8055 | 0.0 | 0.0 | 0.0 |
2020 | 2094 | 0.0 | 0.0 | 0.0 |
For data sources see[6]