If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014222501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.059365,"lon":-112.813429,"icon":""}]} |
Location: 00/01-25-001-22W4/0 | |
Location Alias: 00/01-25-01-22 W4M | |
Location Alias 2: 00/01-25-001-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 22 | |
Section: 25 | |
County/Municipality: Cardston County | |
Well Name: EDALIS ENERGY DELBON 1-25-1-22 | |
Operator Name: Edalis Energy Inc. | |
License Number: 0001505 | |
License Date: 1950-05-25 | |
License Status: Suspension | |
Spud Date: 1950-06-15 | |
Final Drill Date: 1950-08-17 | |
Well Total Depth: 1587.70 m | |
Surface Hole Latitude: 49.059365 | |
Surface Hole Longitude: -112.813429 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-05-25 | Obtained License |
1950-08-17 | Finished Drilling |
1950-08-17 | Well Mode changed to Drilled and Cased |
1950-08-19 | Production Casing Operation Performed |
1950-08-27 | Perforation Treatment Performed - Selective Bullet Perforations |
1950-08-29 | Perforation Treatment Performed - Acid Wash - No Pressure |
1950-09-03 | Perforation Treatment Performed - Bullet Perforation |
1950-09-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
1950-09-17 | Well Began Production |
1950-09-17 | Well Fluid changed to Crude Oil |
1950-09-17 | Well Mode changed to Pumping |
1951-04-16 | Perforation Treatment Performed - Cement Plug |
1951-05-10 | Perforation Treatment Performed - Cement Plug |
1951-05-16 | Perforation Treatment Performed - Bullet Perforation |
1951-05-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-01-31 | Well Fluid changed to Crude Oil |
1979-01-31 | Well Mode changed to Suspended |
1979-08-01 | Well Fluid changed to Crude Oil |
1979-08-01 | Well Mode changed to Pumping |
1986-04-05 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1950-08-27 | Selective Bullet Perforations | 1572.80 | 1573.40 | 0 |
1950-08-27 | Selective Bullet Perforations | 1583.70 | 1584.40 | 0 |
1950-08-27 | Selective Bullet Perforations | 1585.00 | 1585.60 | 0 |
1950-08-27 | Selective Bullet Perforations | 1586.20 | 1586.80 | 0 |
1950-08-27 | Selective Bullet Perforations | 1587.10 | 1587.10 | 0 |
1950-08-29 | Acid Wash | 1572.80 | 1587.10 | 0 |
1950-09-03 | Bullet Perforation | 1575.80 | 1585.00 | 13 |
1950-09-04 | Acid Wash | 1575.80 | 1585.00 | 0 |
1951-04-16 | Cement Plug | 1410.90 | 1587.10 | 0 |
1951-05-10 | Cement Plug | 1549.00 | 1579.50 | 0 |
1951-05-16 | Bullet Perforation | 1580.70 | 1582.20 | 13 |
1950-08-27 | Selective Bullet Perforations | 1574.00 | 1574.60 | 0 |
1951-05-16 | Bullet Perforation | 1582.20 | 1583.70 | 13 |
1951-05-16 | Bullet Perforation | 1578.30 | 1579.80 | 13 |
1951-05-16 | Bullet Perforation | 1576.70 | 1578.30 | 13 |
1951-05-16 | Bullet Perforation | 1573.70 | 1575.20 | 13 |
1951-05-17 | Acid Treatment | 1573.70 | 1583.70 | 0 |
1950-08-27 | Selective Bullet Perforations | 1575.20 | 1575.80 | 0 |
1950-08-27 | Selective Bullet Perforations | 1576.40 | 1577.00 | 0 |
1950-08-27 | Selective Bullet Perforations | 1577.60 | 1578.30 | 0 |
1950-08-27 | Selective Bullet Perforations | 1578.90 | 1579.50 | 0 |
1950-08-27 | Selective Bullet Perforations | 1580.10 | 1580.70 | 0 |
1950-08-27 | Selective Bullet Perforations | 1581.30 | 1581.90 | 0 |
1950-08-27 | Selective Bullet Perforations | 1582.50 | 1583.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 2880 | 0.0 | 0.0 | 0.0 |
1970 | 6600 | 0.0 | 0.0 | 0.0 |
1971 | 4536 | 0.0 | 0.0 | 0.0 |
1972 | 4560 | 0.0 | 0.0 | 0.0 |
1973 | 3096 | 0.0 | 0.0 | 0.0 |
1974 | 3936 | 0.0 | 0.0 | 0.0 |
1975 | 120 | 0.0 | 0.0 | 0.0 |
1979 | 2760 | 0.0 | 0.0 | 0.0 |
1980 | 7392 | 0.0 | 0.0 | 0.0 |
1981 | 6936 | 0.0 | 0.0 | 0.0 |
1982 | 4656 | 0.0 | 0.0 | 0.0 |
1983 | 6504 | 0.0 | 0.0 | 0.0 |
1984 | 2040 | 0.0 | 0.0 | 0.0 |
1985 | 3240 | 0.0 | 0.0 | 0.0 |
1986 | 2832 | 0.0 | 0.0 | 0.0 |
1987 | 2592 | 0.0 | 0.0 | 0.0 |
1988 | 2256 | 0.0 | 0.0 | 0.0 |
1989 | 3024 | 0.0 | 0.0 | 0.0 |
1990 | 1488 | 0.0 | 0.0 | 0.0 |
1991 | 2688 | 0.0 | 0.0 | 0.0 |
1992 | 1295 | 0.0 | 0.0 | 0.0 |
1993 | 2952 | 0.0 | 0.0 | 0.0 |
1994 | 4144 | 0.0 | 0.0 | 0.0 |
1995 | 3696 | 0.0 | 0.0 | 0.0 |
1996 | 600 | 0.0 | 0.0 | 0.0 |
2000 | 2472 | 0.0 | 0.0 | 0.0 |
2001 | 5880 | 0.0 | 0.0 | 0.0 |
2002 | 8687 | 0.0 | 0.0 | 0.0 |
2003 | 4944 | 0.0 | 0.0 | 0.0 |
2004 | 5256 | 0.0 | 0.0 | 0.0 |
2005 | 4632 | 0.0 | 0.0 | 0.0 |
2006 | 6491 | 0.0 | 0.0 | 0.0 |
2007 | 1592 | 0.0 | 0.0 | 0.0 |
2008 | 2264 | 0.0 | 0.0 | 0.0 |
2009 | 3839 | 0.0 | 0.0 | 0.0 |
2010 | 2145 | 0.0 | 0.0 | 0.0 |
2011 | 7364 | 0.0 | 0.0 | 0.0 |
2012 | 3398 | 0.0 | 0.0 | 0.0 |
2013 | 5206 | 0.0 | 0.0 | 0.0 |
2014 | 4034 | 0.0 | 0.0 | 0.0 |
For data sources see[5]