If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014231812002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.036469,"lon":-113.075102,"icon":""}]} |
Location: 00/12-18-001-23W4/2 | |
Location Alias: 00/12-18-01-23 W4M | |
Location Alias 2: 00/12-18-001-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 23 | |
Section: 18 | |
County/Municipality: Cardston County | |
Well Name: LANCE DELBON 12-18-1-23 | |
Operator Name: Lance Exploration Corp. | |
License Number: 0484944 | |
License Date: 2017-08-10 | |
License Status: Issued | |
Spud Date: 2017-08-17 | |
Final Drill Date: 2017-09-01 | |
Well Total Depth: 2995.00 m | |
Surface Hole Latitude: 49.036469 | |
Surface Hole Longitude: -113.075102 |
Date | Event |
---|---|
2017-08-10 | Obtained License |
2017-08-19 | Surface Casing Operation Performed |
2017-08-25 | Kick Occurred |
2017-08-30 | Well Log Performed |
2017-09-01 | Finished Drilling |
2017-09-01 | Production Casing Operation Performed |
2017-09-01 | Well Mode changed to Drilled and Cased |
2017-09-12 | Rig Released |
2017-09-13 | Perforation Treatment Performed - Open-Hole Completion |
2017-09-15 | Well Log Performed |
2017-12-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-12-11 | Plug Back Performed |
2017-12-11 | Well Log Performed |
2017-12-12 | Perforation Treatment Performed - Jet Perforation |
2018-02-03 | Well Began Production |
2018-02-03 | Well Fluid changed to Crude Oil |
2018-02-03 | Well Mode changed to Pumping |
2019-11-30 | Well Fluid changed to Crude Oil |
2019-11-30 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-09-13 | Open Hole/Barefoot Completion | 2983.50 | 2995.00 | 0 |
2017-12-11 | Packing Device Capped w/Cement | 2967.00 | 2975.00 | 0 |
2017-12-12 | Perforation | 2519.00 | 2531.00 | 17 |
2017-12-12 | Perforation | 2505.50 | 2511.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 672 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-08-25 | Kick | 2506.00 | 2506.00 |
2017-09-21 | No Incident Encountered | 0.00 | 0.00 |
2017-12-11 | No Incident Encountered | 0.00 | 0.00 |
2017-12-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]