X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014251805002

Well Details

Well ID: 0014251805002
Loading map...
Location: 00/05-18-001-25W4/2
Location Alias: 00/05-18-01-25 W4M
Location Alias 2: 00/05-18-001-25 W4/02
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 25
Section: 18
County/Municipality: Cardston County
Well Name: STARCHILD ET AL AETNA 5-18-1-25
Operator Name: Starchild Energy Systems Ltd.
License Number: 0160048
License Date: 1993-07-27
License Status: RecCertified
Spud Date: 1993-08-11
Final Drill Date: 1993-11-05
Well Total Depth: 3440.00 m
Surface Hole Latitude: 49.030605
Surface Hole Longitude: -113.341705

For data sources see[1][2]

Well History

Date Event
1993-07-27 Obtained License
1993-08-16 Surface Casing Operation Performed
1993-08-18 Direction Drilling Operation Performed - Deviate
1993-09-18 Intermediate Casing Operation Performed
1993-09-21 Direction Drilling Operation Performed - Sidetrack Fish
1993-11-05 Finished Drilling
1993-11-05 Well Log Performed
1993-11-05 Well Mode changed to Drilled and Cased
1993-11-06 Well Log Performed
1993-11-09 Liner Casing Operation Performed
1993-11-11 Rig Released
1993-12-08 Well Log Performed
1993-12-11 Well Log Performed
1993-12-15 Perforation Treatment Performed - Jet Perforation
1993-12-15 Well Log Performed
1993-12-16 Perforation Treatment Performed - Jet Perforation
1993-12-16 Perforation Treatment Performed - Remedial Casing
1993-12-16 Well Log Performed
1993-12-22 Perforation Treatment Performed - Remedial Casing
1993-12-31 Perforation Treatment Performed - Jet Perforation
1994-01-01 Perforation Treatment Performed - Jet Perforation
1994-01-02 Perforation Treatment Performed - Acid Wash - No Pressure
1994-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-10 Perforation Treatment Performed - Jet Perforation
1994-01-10 Plug Back Performed
1994-01-10 Well Log Performed
1994-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-14 Perforation Treatment Performed - Jet Perforation
1994-01-14 Plug Back Performed
1994-01-14 Well Log Performed
1994-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-18 Perforation Treatment Performed - Jet Perforation
1994-01-18 Plug Back Performed
1994-01-18 Well Log Performed
1994-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-21 Plug Back Performed
1994-01-21 Well Log Performed
1994-01-22 Perforation Treatment Performed - Jet Perforation
1994-01-22 Well Log Performed
1994-01-23 Perforation Treatment Performed - Acid Wash - No Pressure
1994-01-30 Perforation Treatment Performed - Fractured
1994-02-09 Well Log Performed
1994-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-11 Perforation Treatment Performed - Jet Perforation
1994-02-11 Plug Back Performed
1994-02-13 Perforation Treatment Performed - Chemical Squeeze
1994-02-20 Perforation Treatment Performed - Jet Perforation
1994-03-15 Well Began Production
1994-03-15 Well Fluid changed to Crude Oil
1994-03-15 Well Mode changed to Pumping
1995-01-14 Well Fluid changed to Crude Oil
1995-01-14 Well Mode changed to Suspended
1996-06-13 Well Fluid changed to Crude Oil
1996-06-13 Well Mode changed to Pumping
2011-01-01 Well Fluid changed to Crude Oil
2011-01-01 Well Mode changed to Suspended
2012-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-09 Perforation Treatment Performed - Jet Perforation
2012-07-09 Plug Back Performed
2012-07-09 Well Fluid changed to Crude Oil
2012-07-09 Well Mode changed to Abandoned Zone
2012-07-10 Perforation Treatment Performed - Cement Plug
2012-07-10 Perforation Treatment Performed - Cement Squeeze
2012-07-10 Plug Back Performed
2012-07-11 Well Abandoned
2012-07-11 Well Fluid changed to Crude Oil
2012-07-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-08-18 477.00 Deviate (5 - 79 degrees)
1993-09-21 2401.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-12-15 Perforation 2610.00 2611.00 20
1994-01-06 Acid Treatment 3407.00 3410.00 0
1994-01-07 Acid Treatment 3426.00 3429.00 0
1994-01-10 Packing Device Capped w/Cement 3393.00 3402.00 0
1994-01-10 Perforation 3342.00 3346.00 13
1994-01-11 Acid Treatment 3342.00 3346.00 0
1994-01-14 Packing Device Capped w/Cement 3331.00 3340.00 0
1994-01-14 Perforation 3293.00 3302.00 13
1994-01-16 Acid Treatment 3293.00 3302.00 0
1994-01-18 Packing Device Capped w/Cement 3281.00 3290.00 0
1994-01-18 Perforation 3050.00 3062.00 13
1993-12-16 Remedial Casing Cementing 2610.00 2611.00 0
1994-01-19 Acid Treatment 3050.00 3062.00 0
1994-01-21 Packing Device Capped w/Cement 2451.00 2460.00 0
1994-01-22 Perforation 2370.00 2375.00 13
1994-01-22 Perforation 2390.00 2394.50 13
1994-01-23 Acid Wash 2390.00 2394.50 0
1994-01-30 Fracture 2370.00 2394.50 0
1994-02-11 Packing Device Capped w/Cement 2350.00 2360.00 0
1994-02-11 Perforation 2185.00 2187.00 15
1994-02-11 Perforation 2198.00 2200.00 15
1994-02-11 Perforation 2279.00 2281.00 15
1993-12-16 Perforation 2525.00 2526.00 20
1994-02-11 Perforation 2297.00 2298.00 15
1994-02-13 Chemical Squeeze 2279.00 2298.00 0
1994-02-13 Chemical Squeeze 2185.00 2200.00 0
1994-02-20 Perforation 2370.00 2375.00 13
1994-02-20 Perforation 2390.00 2394.50 13
2012-07-09 Packing Device Capped w/Cement 2172.00 2180.00 0
2012-07-09 Perforation 605.00 606.00 17
2012-07-10 Cement Squeeze 605.00 606.00 0
2012-07-10 Cement Plug 568.90 600.00 0
1993-12-22 Remedial Casing Cementing 2525.00 2526.00 0
1993-12-31 Perforation 3426.00 3429.00 13
1994-01-01 Perforation 3407.00 3410.00 13
1994-01-01 Perforation 3421.00 3423.00 13
1994-01-02 Acid Wash 3407.00 3429.00 0
1994-01-05 Acid Treatment 3426.00 3429.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1312 0.0 0.0 0.0
1996 2536 0.0 0.0 0.0
1997 2097 0.0 0.0 0.0
1999 2441 0.0 0.0 0.0
2000 3648 0.0 0.0 0.0
2001 4684 0.0 0.0 0.0
2002 3170 0.0 0.0 0.0
2003 4512 0.0 0.0 0.0
2004 3600 0.0 0.0 0.0
2005 2944 0.0 0.0 0.0
2006 2232 0.0 0.0 0.0
2007 621 0.0 0.0 0.0
2008 396 0.0 0.0 0.0
2010 95 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References