If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014283114002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/14-31-001-28W4/2 | |
Location Alias: 00/14-31-01-28 W4M | |
Location Alias 2: 00/14-31-001-28 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 28 | |
Section: 31 | |
County/Municipality: Cardston County | |
Well Name: LOYAL ENERGY LOOKOUT 14-31-1-28 | |
Operator Name: Loyal Energy (canada) Operating Ltd. | |
License Number: 0016716 | |
License Date: 1959-02-12 | |
License Status: Issued | |
Spud Date: 1959-03-17 | |
Final Drill Date: 1959-09-10 | |
Well Total Depth: 3855.10 m | |
Surface Hole Latitude: 49.082584 | |
Surface Hole Longitude: -113.735000 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1959-02-12 | Obtained License |
1959-05-16 | Drill Stem Test Performed |
1959-05-17 | Drill Stem Test Performed |
1959-07-27 | Drill Stem Test Performed |
1959-07-30 | Drill Stem Test Performed |
1959-08-02 | Drill Stem Test Performed |
1959-08-06 | Drill Stem Test Performed |
1959-08-10 | Drill Stem Test Performed |
1959-08-15 | Drill Stem Test Performed |
1959-08-23 | Drill Stem Test Performed |
1959-09-06 | Drill Stem Test Performed |
1959-09-10 | Finished Drilling |
1959-09-10 | Well Mode changed to Drilled and Cased |
1959-09-11 | Drill Stem Test Performed |
1959-09-21 | Perforation Treatment Performed - Open-Hole Completion |
1959-09-21 | Production Casing Operation Performed |
1959-10-10 | Perforation Treatment Performed - Jet Perforation |
1959-10-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-10-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-10-25 | Perforation Treatment Performed - Jet Perforation |
1959-10-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-11-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1959-11-09 | Perforation Treatment Performed - Jet Perforation |
1959-11-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-11-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-11-19 | Perforation Treatment Performed - Jet Perforation |
1959-11-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-12-15 | Perforation Treatment Performed - Condensate Squeeze |
1959-12-18 | Perforation Treatment Performed - Acid Wash - No Pressure |
1959-12-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1971-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1971-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-07-12 | Perforation Treatment Performed - Jet Perforation |
1992-02-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-07-17 | Plug Back Performed |
2006-08-05 | Perforation Treatment Performed - Jet Perforation |
2006-10-06 | Perforation Treatment Performed - Fractured |
2007-09-03 | Well Began Production |
2007-09-03 | Well Fluid changed to Gas |
2007-09-03 | Well Mode changed to Flowing |
2015-11-02 | Well Fluid changed to Gas |
2015-11-02 | Well Mode changed to Suspended |
2019-10-18 | Well Fluid changed to Gas |
2019-10-18 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-09-21 | Open Hole/Barefoot Completion | 3770.40 | 3855.10 | 0 |
1959-11-09 | Perforation | 3689.30 | 3714.90 | 13 |
1959-11-14 | Acid Treatment | 3689.30 | 3714.90 | 0 |
1959-11-15 | Acid Treatment | 3689.30 | 3714.90 | 0 |
1959-11-19 | Acid Treatment | 3689.30 | 3714.90 | 0 |
1959-11-19 | Perforation | 3668.30 | 3681.70 | 13 |
1959-11-23 | Acid Treatment | 3668.30 | 3681.70 | 0 |
1959-12-15 | Condensate Squeeze | 3668.30 | 3681.70 | 0 |
1959-12-18 | Acid Wash | 3668.30 | 3681.70 | 0 |
1959-12-20 | Acid Treatment | 3668.30 | 3681.70 | 0 |
1971-10-21 | Acid Treatment | 3689.30 | 3714.90 | 0 |
1959-10-10 | Perforation | 3781.30 | 3804.20 | 7 |
1971-10-27 | Acid Treatment | 3668.30 | 3681.70 | 0 |
1973-07-12 | Perforation | 3689.30 | 3714.90 | 13 |
1992-02-05 | Acid Treatment | 3668.30 | 3714.90 | 0 |
2006-07-17 | Packing Device Capped w/Cement | 3635.00 | 3643.00 | 0 |
2006-08-05 | Perforation | 3322.50 | 3328.50 | 17 |
2006-10-06 | Fracture | 3322.50 | 3328.50 | 0 |
1959-10-17 | Acid Treatment | 3781.30 | 3804.20 | 0 |
1959-10-19 | Acid Treatment | 3781.30 | 3804.20 | 0 |
1959-10-25 | Perforation | 3742.90 | 3753.60 | 13 |
1959-10-25 | Perforation | 3719.80 | 3738.70 | 13 |
1959-10-31 | Acid Treatment | 3719.80 | 3753.60 | 0 |
1959-11-01 | Acid Treatment | 3719.80 | 3753.60 | 0 |
1959-11-09 | Packing Device Capped w/Cement | 3716.70 | 3718.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 2688 | 0.0 | 0.0 | 0.0 |
2008 | 5948 | 0.0 | 0.0 | 0.0 |
2009 | 335 | 0.0 | 0.0 | 0.0 |
2010 | 3346 | 0.0 | 0.0 | 0.0 |
2011 | 6395 | 0.0 | 0.0 | 0.0 |
2012 | 4869 | 0.0 | 0.0 | 0.0 |
2013 | 7291 | 0.0 | 0.0 | 0.0 |
2014 | 7209 | 0.0 | 0.0 | 0.0 |
2015 | 5924 | 0.0 | 0.0 | 0.0 |
2019 | 1716 | 0.0 | 0.0 | 0.0 |
2020 | 963 | 0.0 | 0.0 | 0.0 |
For data sources see[5]