If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0024201113000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.100767,"lon":-112.585841,"icon":""}]} |
Location: 00/13-11-002-20W4/0 | |
Location Alias: 00/13-11-02-20 W4M | |
Location Alias 2: 00/13-11-002-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 002 | |
Meridian: 4 | |
Range: 20 | |
Section: 11 | |
County/Municipality: Cardston County | |
Well Name: CPEC BRANCH 13-11-2-20 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0443738 | |
License Date: 2012-02-02 | |
License Status: Abandoned | |
Spud Date: 2012-02-10 | |
Final Drill Date: 2012-03-05 | |
Well Total Depth: 2968.00 m | |
Surface Hole Latitude: 49.100767 | |
Surface Hole Longitude: -112.585841 |
Date | Event |
---|---|
2012-02-02 | Obtained License |
2012-02-11 | Surface Casing Operation Performed |
2012-02-14 | Direction Drilling Operation Performed - Deviate |
2012-02-18 | Direction Drilling Operation Performed - Horizontal |
2012-02-20 | Intermediate Casing Operation Performed |
2012-02-20 | Well Log Performed |
2012-03-05 | Finished Drilling |
2012-03-05 | Well Log Performed |
2012-03-05 | Well Mode changed to Drilled and Cased |
2012-03-06 | Well Log Performed |
2012-03-07 | Liner Casing Operation Performed |
2012-03-08 | Rig Released |
2012-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-23 | Perforation Treatment Performed - Fractured |
2012-03-23 | Perforation Treatment Performed - Jet Perforation |
2012-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-04-23 | Perforation Treatment Performed - Fractured |
2012-04-23 | Perforation Treatment Performed - Jet Perforation |
2012-04-24 | Perforation Treatment Performed - Fractured |
2012-04-24 | Perforation Treatment Performed - Jet Perforation |
2012-04-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-04-25 | Perforation Treatment Performed - Fractured |
2012-04-25 | Perforation Treatment Performed - Jet Perforation |
2012-04-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-04-26 | Perforation Treatment Performed - Fractured |
2012-04-26 | Perforation Treatment Performed - Jet Perforation |
2012-04-27 | Perforation Treatment Performed - Fractured |
2012-04-27 | Perforation Treatment Performed - Jet Perforation |
2012-07-01 | Well Began Production |
2012-07-01 | Well Fluid changed to Crude Oil |
2012-07-01 | Well Mode changed to Pumping |
2014-02-01 | Well Fluid changed to Crude Oil |
2014-02-01 | Well Mode changed to Suspended |
2014-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-25 | Plug Back Performed |
2014-06-25 | Well Fluid changed to Crude Oil |
2014-06-25 | Well Mode changed to Abandoned Zone |
2014-06-30 | Well Abandoned |
2014-06-30 | Well Fluid changed to Crude Oil |
2014-06-30 | Well Mode changed to Abandoned |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-10 | Savanna Drilling Corp. | 628 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-14 | 1365.50 | Deviate (5 - 79 degrees) |
2012-02-18 | 1606.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-21 | Multi-Stage Fracture | 2881.00 | 2881.20 | 0 |
2012-03-23 | Fracture | 2570.00 | 2570.20 | 0 |
2012-03-23 | Perforation | 2520.00 | 2520.20 | 4 |
2012-03-23 | Fracture | 2520.00 | 2520.20 | 0 |
2012-04-23 | Perforation | 2465.20 | 2466.20 | 17 |
2012-04-23 | Fracture | 2465.20 | 2466.20 | 0 |
2012-04-23 | Perforation | 2419.30 | 2420.30 | 17 |
2012-04-23 | Fracture | 2419.30 | 2420.30 | 0 |
2012-04-23 | Perforation | 2373.90 | 2374.90 | 17 |
2012-04-24 | Fracture | 2373.90 | 2374.90 | 0 |
2012-04-24 | Perforation | 2328.50 | 2329.50 | 17 |
2012-03-21 | Multi-Stage Fracture | 2835.20 | 2835.40 | 0 |
2012-04-24 | Fracture | 2328.50 | 2329.50 | 0 |
2012-04-24 | Perforation | 2286.00 | 2287.00 | 17 |
2012-04-24 | Perforation | 2246.00 | 2247.00 | 17 |
2012-04-25 | Acid Treatment | 2246.00 | 2247.00 | 0 |
2012-04-25 | Fracture | 2246.00 | 2247.00 | 0 |
2012-04-25 | Perforation | 2205.00 | 2206.00 | 17 |
2012-04-26 | Acid Treatment | 2205.00 | 2206.00 | 0 |
2012-04-26 | Fracture | 2205.00 | 2206.00 | 0 |
2012-04-26 | Perforation | 2075.30 | 2076.30 | 17 |
2012-04-26 | Fracture | 2075.30 | 2076.30 | 0 |
2012-03-22 | Multi-Stage Fracture | 2758.30 | 2758.50 | 0 |
2012-04-27 | Perforation | 2046.70 | 2047.70 | 17 |
2012-04-27 | Fracture | 2046.70 | 2047.70 | 0 |
2012-04-27 | Perforation | 1976.60 | 1977.60 | 17 |
2012-04-27 | Fracture | 1976.60 | 1977.60 | 0 |
2012-04-27 | Perforation | 1931.60 | 1932.60 | 17 |
2012-04-27 | Fracture | 1931.60 | 1932.60 | 0 |
2012-04-27 | Perforation | 1859.00 | 1860.00 | 17 |
2012-04-27 | Fracture | 1859.00 | 1860.00 | 0 |
2012-04-27 | Perforation | 1725.00 | 1726.00 | 17 |
2012-04-27 | Fracture | 1725.00 | 1726.00 | 0 |
2012-03-23 | Perforation | 2708.00 | 2708.20 | 4 |
2014-06-25 | Packing Device Capped w/Cement | 1559.00 | 1607.80 | 0 |
2012-03-23 | Fracture | 2708.00 | 2708.20 | 0 |
2012-03-23 | Multi-Stage Fracture | 2670.00 | 2670.20 | 0 |
2012-03-23 | Perforation | 2613.40 | 2613.60 | 4 |
2012-03-23 | Fracture | 2613.40 | 2613.60 | 0 |
2012-03-23 | Perforation | 2570.00 | 2570.20 | 4 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3821 | 0.0 | 0.0 | 0.0 |
2013 | 1176 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-14 | No Incident Encountered | 0.00 | 0.00 |
2014-06-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]