X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024291202006

Well Details

Well ID: 0024291202006
Loading map...
Location: 00/02-12-002-29W4/6
Location Alias: 00/02-12-02-29 W4M
Location Alias 2: 00/02-12-002-29 W4/06
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 29
Section: 12
County/Municipality: Cardston County
Well Name: CHAMAELO EXP LOOKOUT 2-12-2-29
Operator Name: Loyal Energy (canada) Operating Ltd.
License Number: 0278786
License Date: 2002-12-17
License Status: Issued
Spud Date: 2002-12-04
Final Drill Date: 2003-01-07
Well Total Depth: 4088.00 m
Surface Hole Latitude: 49.104477
Surface Hole Longitude: -113.750732

For data sources see[1][2]

Well History

Date Event
2002-12-17 Obtained License
2003-01-07 Finished Drilling
2003-01-07 Perforation Treatment Performed - Jet Perforation
2003-01-07 Well Mode changed to Drilled and Cased
2003-01-10 Perforation Treatment Performed - Fractured
2003-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-16 Perforation Treatment Performed - Jet Perforation
2003-01-17 Perforation Treatment Performed - Fractured
2003-01-17 Perforation Treatment Performed - Jet Perforation
2003-01-18 Perforation Treatment Performed - Fractured
2003-01-18 Perforation Treatment Performed - Jet Perforation
2003-01-21 Rig Released
2006-04-01 Perforation Treatment Performed - Jet Perforation
2006-04-10 Well Log Performed
2006-04-15 Perforation Treatment Performed - Jet Perforation
2006-04-16 Perforation Treatment Performed - Fractured
2007-08-26 Perforation Treatment Performed - Cement Squeeze
2007-08-29 Perforation Treatment Performed - Cement Squeeze
2007-09-02 Perforation Treatment Performed - Cement Squeeze
2007-09-09 Perforation Treatment Performed - Cement Squeeze
2007-10-04 Perforation Treatment Performed - Jet Perforation
2007-10-07 Well Began Production
2007-10-07 Well Fluid changed to Crude Oil
2007-10-07 Well Mode changed to Flowing
2007-10-08 Perforation Treatment Performed - Fractured
2009-09-30 Well Fluid changed to Crude Oil
2009-09-30 Well Mode changed to Gas Lift

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-01-07 Perforation 1315.50 1320.00 13
2003-01-18 Perforation 561.00 564.00 13
2003-01-18 Fracture 561.00 564.00 0
2006-04-01 Perforation 1315.50 1320.00 13
2006-04-15 Perforation 3276.00 3282.00 17
2006-04-16 Fracture 3276.00 3282.00 0
2007-08-26 Cement Squeeze 566.00 567.00 0
2007-08-29 Cement Squeeze 762.00 767.00 0
2007-09-02 Cement Squeeze 792.00 797.50 0
2007-09-09 Cement Squeeze 1315.50 1320.00 0
2007-10-04 Perforation 3185.00 3191.00 17
2003-01-10 Fracture 1315.50 1320.00 0
2007-10-08 Fracture 3185.00 3191.00 0
2003-01-15 Packing Device Capped w/Cement 1302.00 1310.00 0
2003-01-16 Perforation 792.00 797.50 13
2003-01-16 Perforation 762.00 767.00 13
2003-01-17 Fracture 792.00 797.50 0
2003-01-17 Fracture 762.00 767.00 0
2003-01-17 Perforation 564.00 567.00 13
2003-01-18 Fracture 564.00 567.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1879 0.0 0.0 0.0
2008 4585 0.0 0.0 0.0
2009 3216 0.0 0.0 0.0
2010 8758 0.0 0.0 0.0
2011 8747 0.0 0.0 0.0
2012 5527 0.0 0.0 0.0
2013 7656 0.0 0.0 0.0
2014 8712 0.0 0.0 0.0
2015 8688 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 7223 0.0 0.0 0.0
2018 4559 0.0 0.0 0.0
2019 408 0.0 0.0 0.0
2020 1995 0.0 0.0 0.0

For data sources see[5]

References