X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034080510000

Well Details

Well ID: 0034080510000
Loading map...
Location: 00/10-05-003-08W4/0
Location Alias: 00/10-05-03-08 W4M
Location Alias 2: 00/10-05-003-08 W4/00
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 08
Section: 05
County/Municipality: County of Forty Mile No. 8
Well Name: CMG PENDOR 10-5-3-8
Operator Name: 7246366 Canada Ltd.
License Number: 0036343
License Date: 1969-06-11
License Status: Re-Entered
Spud Date: 1969-07-08
Final Drill Date: 1969-07-11
Well Total Depth: 855.00 m
Surface Hole Latitude: 49.184198
Surface Hole Longitude: -111.043440

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-06-11 Obtained License
1969-07-11 Finished Drilling
1969-07-11 Perforation Treatment Performed - Open-Hole Completion
1969-07-11 Well Mode changed to Drilled and Cased
1969-07-12 Production Casing Operation Performed
1969-11-06 Well Began Production
1969-11-06 Well Fluid changed to Gas
1969-11-06 Well Mode changed to Flowing
1980-05-09 Well Fluid changed to Gas
1980-05-09 Well Mode changed to Suspended
1981-11-23 Well Fluid changed to Gas
1981-11-23 Well Mode changed to Flowing
1981-12-01 Well Fluid changed to Gas
1981-12-01 Well Mode changed to Suspended
1983-10-14 Well Fluid changed to Gas
1983-10-14 Well Mode changed to Flowing
1986-03-31 Well Fluid changed to Gas
1986-03-31 Well Mode changed to Suspended
1988-03-04 Perforation Treatment Performed - Jet Perforation
1988-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-23 Perforation Treatment Performed - Jet Perforation
1988-03-23 Plug Back Performed
1988-03-23 Well Fluid changed to Gas
1988-03-23 Well Mode changed to Abandoned Zone
1988-06-28 Perforation Treatment Performed - Fractured
1988-10-31 Perforation Treatment Performed - Fractured
1989-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-26 Plug Back Performed
1989-06-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-07-11 Open Hole/Barefoot Completion 848.60 855.00 0
1988-03-04 Perforation 846.00 849.00 13
1988-03-04 Perforation 832.00 834.00 13
1988-03-04 Perforation 835.00 837.50 13
1988-03-23 Packing Device Capped w/Cement 816.00 824.00 0
1988-03-23 Perforation 637.50 639.50 13
1988-06-28 Fracture 637.50 639.50 0
1988-10-31 Fracture 637.50 639.50 0
1989-06-26 Packing Device Capped w/Cement 617.00 625.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 1294 0.0 0.0 0.0
1970 7893 0.0 0.0 0.0
1971 6564 0.0 0.0 0.0
1972 7096 0.0 0.0 0.0
1973 8521 0.0 0.0 0.0
1974 7859 0.0 0.0 0.0
1975 6912 0.0 0.0 0.0
1976 8469 0.0 0.0 0.0
1977 5128 0.0 0.0 0.0
1978 2921 0.0 0.0 0.0
1979 1416 0.0 0.0 0.0
1981 154 0.0 0.0 0.0
1983 1414 0.0 0.0 0.0
1984 1971 0.0 0.0 0.0
1985 2177 0.0 0.0 0.0
1986 1785 0.0 0.0 0.0
1988 98 0.0 0.0 0.0

For data sources see[5]

References