X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0044233203000

Well Details

Well ID: 0044233203000
Loading map...
Location: 00/03-32-004-23W4/0
Location Alias: 00/03-32-04-23 W4M
Location Alias 2: 00/03-32-004-23 W4/00
Country: Canada
Province: Alberta
Township: 004
Meridian: 4
Range: 23
Section: 32
County/Municipality: Cardston County
Well Name: PAGE ET AL SPRING COULEE 3-32-4-23
Operator Name: Page Petroleum Ltd
License Number: 0085222
License Date: 1980-08-26
License Status: RecCertified
Spud Date: 1980-09-08
Final Drill Date: 1980-10-12
Well Total Depth: 2400.00 m
Surface Hole Latitude: 49.337128
Surface Hole Longitude: -113.065694

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-26 Obtained License
1980-10-12 Finished Drilling
1980-10-12 Well Mode changed to Drilled and Cased
1980-10-15 Drill Stem Test Performed
1980-10-18 Drill Stem Test Performed
1980-10-20 Drill Stem Test Performed
1980-10-24 Production Casing Operation Performed
1980-10-30 Perforation Treatment Performed - Jet Perforation
1980-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-06 Perforation Treatment Performed - Jet Perforation
1980-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-14 Perforation Treatment Performed - Jet Perforation
1980-11-16 Perforation Treatment Performed - Fractured
1980-11-17 Well Began Production
1980-11-17 Well Fluid changed to Crude Oil
1980-11-17 Well Mode changed to Flowing
1981-05-01 Well Fluid changed to Crude Oil
1981-05-01 Well Mode changed to Suspended
1981-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-02 Perforation Treatment Performed - Jet Perforation
1984-05-31 Perforation Treatment Performed - Cement Squeeze
1984-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-01 Plug Back Performed
1984-06-01 Well Fluid changed to Crude Oil
1984-06-01 Well Mode changed to Abandoned
1984-07-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-30 Perforation 2352.00 2358.00 13
1981-09-02 Acid Treatment 2168.00 2175.20 0
1984-05-31 Cement Squeeze 2168.00 2175.20 0
1984-06-01 Packing Device Capped w/Cement 2040.00 2048.00 0
1980-11-01 Acid Treatment 2352.00 2358.00 0
1980-11-06 Packing Device Capped w/Cement 2341.00 2349.00 0
1980-11-06 Perforation 2221.00 2235.00 7
1980-11-07 Acid Treatment 2221.00 2235.00 0
1980-11-14 Packing Device Capped w/Cement 2209.00 2217.00 0
1980-11-14 Perforation 2081.00 2090.00 13
1980-11-16 Fracture 2081.00 2090.00 0
1981-09-02 Perforation 2168.00 2175.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 754 0.0 0.0 0.0
1981 1992 0.0 0.0 0.0

For data sources see[5]

References