If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0044252114000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.319166,"lon":-113.312231,"icon":""}]} |
Location: 00/14-21-004-25W4/0 | |
Location Alias: 00/14-21-04-25 W4M | |
Location Alias 2: 00/14-21-004-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 004 | |
Meridian: 4 | |
Range: 25 | |
Section: 21 | |
County/Municipality: Blood 148 | |
Well Name: GULF ET AL SOUTH BLOOD 14-21-4-25 | |
Operator Name: Gulf Canada Limited | |
License Number: 0098656 | |
License Date: 1982-11-10 | |
License Status: RecCertified | |
Spud Date: 1982-11-12 | |
Final Drill Date: 1983-01-27 | |
Well Total Depth: 3030.00 m | |
Surface Hole Latitude: 49.319166 | |
Surface Hole Longitude: -113.312231 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-11-10 | Obtained License |
1982-12-29 | Lost Circulation Occurred |
1983-01-03 | Drill Stem Test Performed |
1983-01-04 | Lost Circulation Occurred |
1983-01-27 | Finished Drilling |
1983-01-27 | Well Mode changed to Drilled and Cased |
1983-01-28 | Well Log Performed |
1983-02-02 | Production Casing Operation Performed |
1983-02-28 | Perforation Treatment Performed - Jet Perforation |
1983-03-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-03-09 | Perforation Treatment Performed - Jet Perforation |
1983-03-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-03-12 | Perforation Treatment Performed - Cement Squeeze |
1983-03-13 | Perforation Treatment Performed - Jet Perforation |
1983-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-03-17 | Perforation Treatment Performed - Cement Squeeze |
1983-03-18 | Perforation Treatment Performed - Jet Perforation |
1983-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-03-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-04-08 | Well Began Production |
1983-04-08 | Well Fluid changed to Crude Oil |
1983-04-08 | Well Mode changed to Flowing |
1983-04-30 | Well Fluid changed to Crude Oil |
1983-04-30 | Well Mode changed to Suspended |
1986-05-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-05-14 | Plug Back Performed |
1986-05-14 | Well Fluid changed to Crude Oil |
1986-05-14 | Well Mode changed to Abandoned |
1986-05-15 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-02-28 | Perforation | 2903.00 | 2905.00 | 13 |
1983-03-17 | Acid Treatment | 2491.00 | 2496.00 | 0 |
1983-03-17 | Cement Squeeze | 2491.00 | 2496.00 | 0 |
1983-03-18 | Perforation | 2458.50 | 2496.00 | 13 |
1983-03-18 | Perforation | 2453.00 | 2457.00 | 13 |
1983-03-19 | Acid Treatment | 2453.00 | 2460.00 | 0 |
1983-03-26 | Acid Treatment | 2453.00 | 2460.00 | 0 |
1986-05-14 | Packing Device Capped w/Cement | 2435.00 | 2443.00 | 0 |
1983-02-28 | Perforation | 2897.00 | 2900.00 | 13 |
1983-03-01 | Acid Treatment | 2897.00 | 2905.00 | 0 |
1983-03-09 | Packing Device Capped w/Cement | 2882.00 | 2890.00 | 0 |
1983-03-09 | Perforation | 2507.50 | 2509.00 | 13 |
1983-03-10 | Acid Treatment | 2507.50 | 2509.00 | 0 |
1983-03-12 | Cement Squeeze | 2507.50 | 2509.00 | 0 |
1983-03-13 | Perforation | 2491.00 | 2496.00 | 13 |
1983-03-14 | Acid Treatment | 2491.00 | 2496.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1982-12-29 | Lost Circulation | 1950.00 | 1980.00 |
1983-01-04 | Lost Circulation | 2475.00 | 2481.00 |
For data sources see[6]