X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0064242310000

Well Details

Well ID: 0064242310000
Loading map...
Location: 00/10-23-006-24W4/0
Location Alias: 00/10-23-06-24 W4M
Location Alias 2: 00/10-23-006-24 W4/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 4
Range: 24
Section: 23
County/Municipality: Blood 148
Well Name: ROY AM MEKASTO BLOOD IR 10-23-6-24
Operator Name: Canadian Ponderay Energy Ltd.
License Number: 0026120
License Date: 1964-05-20
License Status: RecCertified
Spud Date: 1964-05-29
Final Drill Date: 1964-06-22
Well Total Depth: 1962.30 m
Surface Hole Latitude: 49.488637
Surface Hole Longitude: -113.129490

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-05-20 Obtained License
1964-06-14 Drill Stem Test Performed
1964-06-18 Drill Stem Test Performed
1964-06-21 Drill Stem Test Performed
1964-06-22 Finished Drilling
1964-06-22 Production Casing Operation Performed
1964-06-22 Well Mode changed to Drilled and Cased
1964-07-05 Perforation Treatment Performed - Acid Wash - No Pressure
1964-07-05 Perforation Treatment Performed - Jet Perforation
1964-08-05 Well Began Production
1964-08-05 Well Fluid changed to Crude Oil
1964-08-05 Well Mode changed to Pumping
1965-01-15 Well Fluid changed to Crude Oil
1965-01-15 Well Mode changed to Suspended
1965-09-20 Perforation Treatment Performed - Bullet Perforation
1965-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-11 Perforation Treatment Performed - Jet Perforation
1965-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-15 Perforation Treatment Performed - Cement Squeeze
1966-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-07-03 Well Fluid changed to Crude Oil
1966-07-03 Well Mode changed to Pumping
1966-11-04 Well Fluid changed to Crude Oil
1966-11-04 Well Mode changed to Suspended
1975-07-30 Perforation Treatment Performed - Cement Plug
1975-08-03 Well Abandoned
1975-08-03 Well Fluid changed to Crude Oil
1975-08-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-07-05 Perforation 1928.50 1931.50 13
1965-11-13 Acid Treatment 1940.40 1942.80 0
1965-11-15 Cement Squeeze 1940.40 1942.80 0
1966-06-27 Acid Treatment 1928.50 1936.10 0
1975-07-30 Cement Plug 1876.00 1943.40 0
1964-07-05 Perforation 1933.00 1936.70 13
1964-07-05 Acid Wash 1928.50 1936.70 0
1965-09-20 Bullet Perforation 1943.70 1944.60 13
1965-09-21 Packing Device Capped w/Cement 1943.40 1943.40 0
1965-09-23 Acid Treatment 1928.50 1931.50 0
1965-09-23 Acid Treatment 1933.00 1936.70 0
1965-11-11 Perforation 1940.40 1942.80 13
1965-11-12 Acid Treatment 1940.40 1942.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0

For data sources see[5]

References