If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0064262206002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.486736,"lon":-113.425538,"icon":""}]} |
Location: 00/06-22-006-26W4/2 | |
Location Alias: 00/06-22-06-26 W4M | |
Location Alias 2: 00/06-22-006-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 006 | |
Meridian: 4 | |
Range: 26 | |
Section: 22 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: CZAR ET AL STANDOFF 6-22-6-26 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0082819 | |
License Date: 1980-05-15 | |
License Status: RecCertified | |
Spud Date: 1980-05-18 | |
Final Drill Date: 1980-07-06 | |
Well Total Depth: 2720.00 m | |
Surface Hole Latitude: 49.486736 | |
Surface Hole Longitude: -113.425538 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-05-15 | Obtained License |
1980-05-18 | Lost Circulation Occurred |
1980-05-20 | Lost Circulation Occurred |
1980-06-21 | Drill Stem Test Performed |
1980-06-22 | Drill Stem Test Performed |
1980-06-24 | Lost Circulation Occurred |
1980-06-26 | Lost Circulation Occurred |
1980-07-06 | Finished Drilling |
1980-07-07 | Well Log Performed |
1980-07-08 | Drill Stem Test Performed |
1980-07-13 | Drill Stem Test Performed |
1980-07-14 | Drill Stem Test Performed |
1980-07-17 | Production Casing Operation Performed |
1980-09-02 | Perforation Treatment Performed - Jet Perforation |
1980-09-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-09-05 | Perforation Treatment Performed - Cement Squeeze |
1980-09-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-09-08 | Perforation Treatment Performed - Jet Perforation |
1980-09-11 | Perforation Treatment Performed - Cement Squeeze |
1980-09-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-09-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-09-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-09-20 | Perforation Treatment Performed - Jet Perforation |
1980-09-21 | Perforation Treatment Performed - Fractured |
1980-09-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-09-25 | Plug Back Performed |
1980-09-26 | Perforation Treatment Performed - Jet Perforation |
1980-09-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-09-28 | Perforation Treatment Performed - Fractured |
1985-10-01 | Well Mode changed to Drilled and Cased |
1987-07-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-07-06 | Plug Back Performed |
1987-07-06 | Well Mode changed to Abandoned |
1987-07-09 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-09-02 | Perforation | 2623.00 | 2636.00 | 7 |
1980-09-20 | Perforation | 2478.50 | 2483.00 | 7 |
1980-09-21 | Fracture | 2478.50 | 2483.00 | 0 |
1980-09-25 | Packing Device Capped w/Cement | 2437.00 | 2445.00 | 0 |
1980-09-26 | Perforation | 2028.00 | 2052.00 | 7 |
1980-09-27 | Acid Treatment | 2028.00 | 2052.00 | 0 |
1980-09-28 | Fracture | 2028.00 | 2052.00 | 0 |
1987-07-06 | Packing Device Capped w/Cement | 1967.00 | 1975.00 | 0 |
1980-09-03 | Acid Treatment | 2623.00 | 2636.00 | 0 |
1980-09-05 | Cement Squeeze | 2623.00 | 2636.00 | 0 |
1980-09-08 | Perforation | 2602.00 | 2615.00 | 7 |
1980-09-08 | Acid Treatment | 2602.00 | 2615.00 | 0 |
1980-09-11 | Cement Squeeze | 2602.00 | 2615.00 | 0 |
1980-09-13 | Acid Treatment | 2602.00 | 2615.00 | 0 |
1980-09-14 | Acid Treatment | 2602.00 | 2615.00 | 0 |
1980-09-16 | Packing Device Capped w/Cement | 2574.00 | 2582.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-05-18 | Lost Circulation | 24.00 | 24.00 |
1980-05-20 | Lost Circulation | 146.00 | 146.00 |
1980-06-24 | Lost Circulation | 2203.00 | 2210.00 |
1980-06-26 | Lost Circulation | 2305.00 | 2323.00 |
For data sources see[5]