X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084150604030

Well Details

Well ID: 0084150604030
Loading map...
Location: 03/04-06-008-15W4/0
Location Alias: 03/04-06-08-15 W4M
Location Alias 2: 03/04-06-008-15 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 15
Section: 06
County/Municipality: Municipal District of Taber
Well Name: ARROW POINT TABERSE 4-6-8-15
Operator Name: Taber Water Disposal Inc.
License Number: 0441553
License Date: 2011-12-16
License Status: Issued
Spud Date: 2011-12-17
Final Drill Date: 2011-12-30
Well Total Depth: 1592.00 m
Surface Hole Latitude: 49.619564
Surface Hole Longitude: -112.031536

For data sources see[1][2]

Well History

Date Event
2011-12-16 Obtained License
2011-12-18 Surface Casing Operation Performed
2011-12-20 Direction Drilling Operation Performed - Horizontal
2011-12-23 Intermediate Casing Operation Performed
2011-12-30 Finished Drilling
2011-12-30 Well Mode changed to Drilled and Cased
2011-12-31 Rig Released
2012-01-16 Perforation Treatment Performed - Open-Hole Completion
2012-02-01 Well Began Production
2012-02-01 Well Fluid changed to Crude Oil
2012-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-20 785.95 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-16 Open Hole/Barefoot Completion 1072.00 1592.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7577 0.0 0.0 0.0
2013 8668 0.0 0.0 0.0
2014 8222 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8713 0.0 0.0 0.0
2017 8658 0.0 0.0 0.0
2018 8543 0.0 0.0 0.0
2019 6694 0.0 0.0 0.0

For data sources see[6]

References