X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084221706000

Well Details

Well ID: 0084221706000
Location: 00/06-17-008-22W4/0
Location Alias: 00/06-17-08-22 W4M
Location Alias 2: 00/06-17-008-22 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 22
Section: 17
County/Municipality: Blood 148
Well Name: TAC PENNY 6-17-8-22
Operator Name: Tamarack Acquisition Corp.
License Number: 0227992
License Date: 1999-10-28
License Status: Suspension
Spud Date: 1999-11-04
Final Drill Date: 1999-11-09
Well Total Depth: 1491.00 m
Surface Hole Latitude: 49.644202
Surface Hole Longitude: -112.953362

For data sources see[1][2]

Well History

Date Event
1999-10-28 Obtained License
1999-11-05 Surface Casing Operation Performed
1999-11-08 Well Log Performed
1999-11-09 Finished Drilling
1999-11-09 Well Log Performed
1999-11-10 Production Casing Operation Performed
1999-11-10 Rig Released
1999-11-10 Well Mode changed to Drilled and Cased
1999-11-12 Perforation Treatment Performed - Jet Perforation
1999-11-13 Well Log Performed
1999-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-14 Perforation Treatment Performed - Jet Perforation
1999-11-14 Plug Back Performed
1999-11-15 Well Log Performed
1999-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-16 Perforation Treatment Performed - Jet Perforation
1999-11-16 Plug Back Performed
1999-11-17 Well Log Performed
1999-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-18 Perforation Treatment Performed - Jet Perforation
1999-11-18 Plug Back Performed
1999-11-19 Well Log Performed
1999-12-01 Well Began Production
1999-12-01 Well Fluid changed to Crude Oil
1999-12-01 Well Mode changed to Flowing
2015-05-01 Well Fluid changed to Crude Oil
2015-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-11-12 Perforation 1458.00 1461.50 13
1999-11-14 Packing Device Capped w/Cement 1442.00 1450.00 0
1999-11-14 Perforation 1347.00 1351.00 13
1999-11-16 Packing Device Capped w/Cement 1328.00 1335.00 0
1999-11-16 Perforation 1247.20 1251.80 13
1999-11-18 Packing Device Capped w/Cement 1232.00 1240.00 0
1999-11-18 Perforation 1094.40 1097.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 576 0.0 0.0 0.0
2000 8743 0.0 0.0 0.0
2001 8739 0.0 0.0 0.0
2002 8714 0.0 0.0 0.0
2003 8615 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8476 0.0 0.0 0.0
2006 8603 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8736 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 7373 0.0 0.0 0.0
2011 8387 0.0 0.0 0.0
2012 8621 0.0 0.0 0.0
2013 6201 0.0 0.0 0.0

For data sources see[5]

References