If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0084223016004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.680832,"lon":-112.964708,"icon":""}]} |
Location: 00/16-30-008-22W4/4 | |
Location Alias: 00/16-30-08-22 W4M | |
Location Alias 2: 00/16-30-008-22 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 008 | |
Meridian: 4 | |
Range: 22 | |
Section: 30 | |
County/Municipality: Lethbridge County | |
Well Name: TAC PENNY 16-30-8-22 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0082424 | |
License Date: 1980-04-28 | |
License Status: Issued | |
Spud Date: 1980-04-29 | |
Final Drill Date: 1980-05-27 | |
Well Total Depth: 1925.00 m | |
Surface Hole Latitude: 49.680832 | |
Surface Hole Longitude: -112.964708 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-04-28 | Obtained License |
1980-05-12 | Drill Stem Test Performed |
1980-05-16 | Drill Stem Test Performed |
1980-05-27 | Finished Drilling |
1980-05-27 | Well Mode changed to Drilled and Cased |
1980-05-29 | Drill Stem Test Performed |
1980-05-30 | Drill Stem Test Performed |
1980-06-01 | Production Casing Operation Performed |
1980-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-06-13 | Perforation Treatment Performed - Jet Perforation |
1980-06-17 | Perforation Treatment Performed - Jet Perforation |
1980-06-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-06-25 | Perforation Treatment Performed - Cement Squeeze |
1980-06-25 | Perforation Treatment Performed - Jet Perforation |
1980-06-26 | Perforation Treatment Performed - Cement Squeeze |
1980-06-26 | Perforation Treatment Performed - Jet Perforation |
1980-07-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
1980-07-09 | Perforation Treatment Performed - Jet Perforation |
1980-07-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-07-13 | Perforation Treatment Performed - Cement Squeeze |
1980-07-20 | Perforation Treatment Performed - Cement Squeeze |
1980-07-22 | Perforation Treatment Performed - Jet Perforation |
1980-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-24 | Perforation Treatment Performed - Cement Squeeze |
1980-11-25 | Perforation Treatment Performed - Cement Squeeze |
1980-11-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-11-30 | Perforation Treatment Performed - Fractured |
1984-04-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-04-08 | Perforation Treatment Performed - Cement Plug |
1984-04-09 | Perforation Treatment Performed - Jet Perforation |
1998-05-04 | Perforation Treatment Performed - Jet Perforation |
1998-05-04 | Well Log Performed |
1998-05-06 | Perforation Treatment Performed - Fractured |
1998-05-12 | Well Began Production |
1998-05-12 | Well Fluid changed to Gas |
1998-05-12 | Well Mode changed to Flowing |
2012-02-01 | Well Fluid changed to Gas |
2012-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-06-13 | Perforation | 1670.00 | 1685.00 | 7 |
1980-06-26 | Cement Squeeze | 1450.00 | 1453.00 | 0 |
1980-07-04 | Acid Wash | 1670.00 | 1685.00 | 0 |
1980-07-04 | Acid Wash | 1575.00 | 1625.00 | 0 |
1980-07-09 | Perforation | 1427.00 | 1445.40 | 7 |
1980-07-10 | Acid Treatment | 1427.00 | 1445.40 | 0 |
1980-07-13 | Cement Squeeze | 1427.00 | 1445.40 | 0 |
1980-07-20 | Cement Squeeze | 1427.00 | 1445.40 | 0 |
1980-07-22 | Perforation | 1427.00 | 1435.00 | 7 |
1980-07-23 | Acid Treatment | 1427.00 | 1435.00 | 0 |
1980-11-24 | Cement Squeeze | 1427.00 | 1435.00 | 0 |
1980-06-13 | Acid Treatment | 1670.00 | 1685.00 | 0 |
1980-11-25 | Cement Squeeze | 1427.00 | 1435.00 | 0 |
1980-11-29 | Packing Device Capped w/Cement | 1636.00 | 1642.00 | 0 |
1980-11-30 | Fracture | 1575.00 | 1625.00 | 0 |
1984-04-08 | Cement Plug | 1440.00 | 1494.00 | 0 |
1984-04-08 | Packing Device Capped w/Cement | 1417.00 | 1425.00 | 0 |
1984-04-09 | Perforation | 1150.00 | 1153.00 | 13 |
1998-05-04 | Perforation | 1028.00 | 1034.00 | 13 |
1998-05-06 | Fracture | 1028.00 | 1034.00 | 0 |
1980-06-17 | Perforation | 1575.00 | 1600.00 | 7 |
1980-06-17 | Perforation | 1600.00 | 1610.00 | 14 |
1980-06-17 | Perforation | 1610.00 | 1625.00 | 7 |
1980-06-18 | Acid Treatment | 1575.00 | 1625.00 | 0 |
1980-06-25 | Perforation | 1492.00 | 1495.00 | 14 |
1980-06-25 | Cement Squeeze | 1492.00 | 1495.00 | 0 |
1980-06-26 | Perforation | 1450.00 | 1453.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 5810 | 0.0 | 0.0 | 0.0 |
1999 | 8285 | 0.0 | 0.0 | 0.0 |
2000 | 8502 | 0.0 | 0.0 | 0.0 |
2001 | 8629 | 0.0 | 0.0 | 0.0 |
2002 | 3969 | 0.0 | 0.0 | 0.0 |
For data sources see[5]