X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084232503000

Well Details

Well ID: 0084232503000
Loading map...
Location: 00/03-25-008-23W4/0
Location Alias: 00/03-25-08-23 W4M
Location Alias 2: 00/03-25-008-23 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 23
Section: 25
County/Municipality: Blood 148
Well Name: TAC 15-19 HZ PENNY 3-25-8-23
Operator Name: Tamarack Acquisition Corp.
License Number: 0489799
License Date: 2018-06-28
License Status: Amended
Spud Date: 2018-07-18
Final Drill Date: 2018-07-28
Well Total Depth: 3100.00 m
Surface Hole Latitude: 49.666516
Surface Hole Longitude: -112.969942

For data sources see[1][2]

Well History

Date Event
2018-06-28 Obtained License
2018-07-19 Surface Casing Operation Performed
2018-07-20 Direction Drilling Operation Performed - Deviate
2018-07-21 Direction Drilling Operation Performed - Horizontal
2018-07-22 Intermediate Casing Operation Performed
2018-07-28 Finished Drilling
2018-07-28 Well Log Performed
2018-07-28 Well Mode changed to Drilled and Cased
2018-07-29 Well Log Performed
2018-07-30 Liner Casing Operation Performed
2018-07-30 Rig Released
2018-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-19 Well Began Production
2018-09-19 Well Fluid changed to Crude Oil
2018-09-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-20 749.90 Deviate (5 - 79 degrees)
2018-07-21 1092.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-15 Multi-Stage Fracture 3054.20 3054.30 0
2018-09-15 Multi-Stage Fracture 2593.40 2593.50 0
2018-09-15 Multi-Stage Fracture 2542.20 2542.30 0
2018-09-15 Multi-Stage Fracture 2490.70 2490.80 0
2018-09-15 Multi-Stage Fracture 2439.70 2439.80 0
2018-09-15 Multi-Stage Fracture 2388.40 2388.50 0
2018-09-15 Multi-Stage Fracture 2337.20 2337.30 0
2018-09-16 Multi-Stage Fracture 2285.90 2286.00 0
2018-09-16 Multi-Stage Fracture 2234.70 2234.80 0
2018-09-16 Multi-Stage Fracture 2183.60 2183.70 0
2018-09-16 Multi-Stage Fracture 2132.40 2132.50 0
2018-09-15 Multi-Stage Fracture 3003.00 3003.10 0
2018-09-16 Multi-Stage Fracture 2081.20 2081.30 0
2018-09-16 Multi-Stage Fracture 2029.90 2030.00 0
2018-09-16 Multi-Stage Fracture 1978.70 1978.80 0
2018-09-16 Multi-Stage Fracture 1927.40 1927.50 0
2018-09-16 Multi-Stage Fracture 1876.50 1876.60 0
2018-09-16 Multi-Stage Fracture 1825.30 1825.40 0
2018-09-16 Multi-Stage Fracture 1774.10 1774.20 0
2018-09-16 Multi-Stage Fracture 1722.90 1723.00 0
2018-09-16 Multi-Stage Fracture 1671.60 1671.70 0
2018-09-16 Multi-Stage Fracture 1620.40 1620.50 0
2018-09-15 Multi-Stage Fracture 2951.70 2951.80 0
2018-09-17 Multi-Stage Fracture 1569.10 1569.20 0
2018-09-17 Multi-Stage Fracture 1517.90 1518.00 0
2018-09-17 Multi-Stage Fracture 1466.70 1466.80 0
2018-09-17 Multi-Stage Fracture 1428.10 1428.20 0
2018-09-17 Multi-Stage Fracture 1389.50 1389.60 0
2018-09-17 Multi-Stage Fracture 1338.30 1338.40 0
2018-09-17 Multi-Stage Fracture 1287.00 1287.10 0
2018-09-15 Multi-Stage Fracture 2900.50 2900.60 0
2018-09-15 Multi-Stage Fracture 2849.60 2849.70 0
2018-09-15 Multi-Stage Fracture 2798.40 2798.50 0
2018-09-15 Multi-Stage Fracture 2747.20 2747.30 0
2018-09-15 Multi-Stage Fracture 2695.90 2696.00 0
2018-09-15 Multi-Stage Fracture 2644.70 2644.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-15 2018-09-17 1,049 3,252 N/A
2 2018-09-15 2018-09-15 1,049 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 88.8557 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 4.4581 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0515 N/A
water 7732-18-5 100 0.0515 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0962 N/A
IH-CS-4 Fusion Technologies Inc. Clay Control Non-Whimis Regulated Not Available 100 0.1253 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1549 N/A
Ethylene glycol 107-21-1 100 0.1549 N/A
Potassium Carbonate 584-08-7 100 0.1549 N/A
Potassium Hydroxide 1310-58-3 100 0.1549 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0277 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3416 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0671 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0671 N/A
water 7732-18-5 100 0.0671 N/A
2 Iron Horse Spearhead Acid Package Fusion Technologies Inc. Acid Hydrogen Chloride 7647-01-0 100 0.9419 N/A
water Not Available 100 0.9419 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-20 2018-08-26 Groundwater - Non-saline less than or equal to 150m deep 1957
2018-08-21 2018-08-25 Groundwater - Non-saline less than or equal to 150m deep 1864
2018-08-21 2018-08-21 Municipal Water 73

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2221 0.0 0.0 0.0
2019 8525 0.0 0.0 0.0
2020 2156 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-30 No Incident Encountered 0.00 0.00
2018-09-17 No Incident Encountered 0.00 0.00

For data sources see[9]

References