If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0084233008002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.668831,"lon":-113.080321,"icon":""}]} |
| Location: 00/08-30-008-23W4/2 | |
| Location Alias: 00/08-30-08-23 W4M | |
| Location Alias 2: 00/08-30-008-23 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 008 | |
| Meridian: 4 | |
| Range: 23 | |
| Section: 30 | |
| County/Municipality: Blood 148 | |
| Well Name: TAC KIPP 2-29-8-23 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0434059 | |
| License Date: 2011-06-06 | |
| License Status: Amended | |
| Spud Date: 2011-07-25 | |
| Final Drill Date: 2011-09-25 | |
| Well Total Depth: 3610.00 m | |
| Surface Hole Latitude: 49.668831 | |
| Surface Hole Longitude: -113.080321 |
| Date | Event |
|---|---|
| 2011-06-06 | Obtained License |
| 2011-09-07 | Direction Drilling Operation Performed - Horizontal |
| 2011-09-10 | Intermediate Casing Operation Performed |
| 2011-09-25 | Finished Drilling |
| 2011-09-25 | Well Mode changed to Drilled and Cased |
| 2011-09-27 | Well Log Performed |
| 2011-10-02 | Liner Casing Operation Performed |
| 2011-10-05 | Rig Released |
| 2011-10-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-12-14 | Well Began Production |
| 2011-12-14 | Well Fluid changed to Crude Oil |
| 2011-12-14 | Well Mode changed to Pumping |
| 2017-11-20 | Perforation Treatment Performed - Jet Perforation |
| 2017-11-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2017-11-30 | Well Fluid changed to Crude Oil |
| 2017-11-30 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-09-07 | 2257.90 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-17 | Multi-Stage Fracture | 3597.40 | 3597.50 | 0 |
| 2011-10-27 | Multi-Stage Fracture | 3064.40 | 3064.50 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 3001.30 | 3001.40 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 2938.00 | 2938.10 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 2874.80 | 2874.90 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 2811.70 | 2811.80 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 2748.50 | 2748.60 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 2685.70 | 2685.80 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 2622.60 | 2622.70 | 0 |
| 2011-10-29 | Multi-Stage Fracture | 2559.40 | 2559.50 | 0 |
| 2011-10-29 | Multi-Stage Fracture | 2496.30 | 2496.40 | 0 |
| 2011-10-17 | Multi-Stage Fracture | 3596.60 | 3596.70 | 0 |
| 2011-10-29 | Multi-Stage Fracture | 2433.10 | 2433.20 | 0 |
| 2011-10-29 | Multi-Stage Fracture | 2369.80 | 2369.90 | 0 |
| 2017-11-20 | Perforation | 1949.00 | 1955.00 | 17 |
| 2017-11-21 | Acid Treatment | 1949.00 | 1955.00 | 0 |
| 2011-10-25 | Multi-Stage Fracture | 3506.70 | 3506.80 | 0 |
| 2011-10-25 | Multi-Stage Fracture | 3443.50 | 3443.60 | 0 |
| 2011-10-25 | Multi-Stage Fracture | 3380.30 | 3380.40 | 0 |
| 2011-10-26 | Multi-Stage Fracture | 3317.00 | 3317.10 | 0 |
| 2011-10-27 | Multi-Stage Fracture | 3254.00 | 3254.10 | 0 |
| 2011-10-27 | Multi-Stage Fracture | 3190.80 | 3190.90 | 0 |
| 2011-10-27 | Multi-Stage Fracture | 3127.60 | 3127.70 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 408 | 0.0 | 0.0 | 0.0 |
| 2012 | 8105 | 0.0 | 0.0 | 0.0 |
| 2013 | 8745 | 0.0 | 0.0 | 0.0 |
| 2014 | 8518 | 0.0 | 0.0 | 0.0 |
| 2015 | 8572 | 0.0 | 0.0 | 0.0 |
| 2016 | 8480 | 0.0 | 0.0 | 0.0 |
| 2017 | 7919 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-11-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]