X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084233010000

Well Details

Well ID: 0084233010000
Loading map...
Location: 00/10-30-008-23W4/0
Location Alias: 00/10-30-08-23 W4M
Location Alias 2: 00/10-30-008-23 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 23
Section: 30
County/Municipality: Blood 148
Well Name: INDRA BLOOD 10-30-8-23
Operator Name: Indra Oil & Gas Ltd.
License Number: 0073841
License Date: 1979-01-10
License Status: Issued
Spud Date: 1979-01-15
Final Drill Date: 1979-03-11
Well Total Depth: 2390.00 m
Surface Hole Latitude: 49.679529
Surface Hole Longitude: -113.104911

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-10 Obtained License
1979-02-08 Drill Stem Test Performed
1979-02-09 Drill Stem Test Performed
1979-02-15 Drill Stem Test Performed
1979-02-25 Drill Stem Test Performed
1979-02-26 Lost Circulation Occurred
1979-03-11 Finished Drilling
1979-03-11 Lost Circulation Occurred
1979-03-11 Well Log Performed
1979-03-13 Drill Stem Test Performed
1979-03-15 Production Casing Operation Performed
1979-03-16 Well Mode changed to Drilled and Cased
1979-05-16 Perforation Treatment Performed - Jet Perforation
1979-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-19 Perforation Treatment Performed - Cement Squeeze
1979-05-26 Perforation Treatment Performed - Jet Perforation
1979-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-05-31 Perforation Treatment Performed - Jet Perforation
1979-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-04 Well Began Production
1979-06-04 Well Fluid changed to Crude Oil
1979-06-04 Well Mode changed to Flowing
1979-07-08 Drill Stem Test Performed
1985-12-20 Well Fluid changed to Crude Oil
1985-12-20 Well Mode changed to Suspended
1990-01-15 Well Fluid changed to Crude Oil
1990-01-15 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-05-16 Perforation 2353.00 2355.00 13
1979-05-31 Perforation 2241.50 2244.00 13
1979-05-31 Perforation 2246.00 2250.00 13
1979-06-02 Acid Treatment 2237.50 2250.00 0
1979-05-16 Perforation 2357.00 2358.50 13
1979-05-17 Acid Treatment 2353.00 2358.50 0
1979-05-19 Cement Squeeze 2353.00 2358.50 0
1979-05-26 Perforation 2337.50 2338.50 13
1979-05-26 Perforation 2342.80 2346.40 13
1979-05-27 Acid Treatment 2337.50 2346.40 0
1979-05-30 Packing Device Capped w/Cement 2319.00 2327.00 0
1979-05-31 Perforation 2237.50 2239.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1247 0.0 0.0 0.0
1980 7460 0.0 0.0 0.0
1981 8385 0.0 0.0 0.0
1982 8759 0.0 0.0 0.0
1983 8373 0.0 0.0 0.0
1984 8080 0.0 0.0 0.0
1985 8044 0.0 0.0 0.0
1990 7243 0.0 0.0 0.0
1991 8330 0.0 0.0 0.0
1992 8080 0.0 0.0 0.0
1993 8756 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8452 0.0 0.0 0.0
1997 8372 0.0 0.0 0.0
1998 7670 0.0 0.0 0.0
1999 8033 0.0 0.0 0.0
2000 8180 0.0 0.0 0.0
2001 8733 0.0 0.0 0.0
2002 8432 0.0 0.0 0.0
2003 7898 0.0 0.0 0.0
2004 5774 0.0 0.0 0.0
2005 7339 0.0 0.0 0.0
2006 6264 0.0 0.0 0.0
2007 6253 0.0 0.0 0.0
2008 7110 0.0 0.0 0.0
2009 5426 0.0 0.0 0.0
2010 8409 0.0 0.0 0.0
2011 6303 0.0 0.0 0.0
2012 7323 0.0 0.0 0.0
2013 6296 0.0 0.0 0.0
2014 8516 0.0 0.0 0.0
2015 8626 0.0 0.0 0.0
2016 6597 0.0 0.0 0.0
2017 7035 0.0 0.0 0.0
2018 6061 0.0 0.0 0.0
2019 5336 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-02-26 Lost Circulation 2145.00 2145.00
1979-03-11 Lost Circulation 2390.00 2390.00

For data sources see[6]

References