X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094142116000

Well Details

Well ID: 0094142116000
Loading map...
Location: 00/16-21-009-14W4/0
Location Alias: 00/16-21-09-14 W4M
Location Alias 2: 00/16-21-009-14 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 14
Section: 21
County/Municipality: Municipal District of Taber
Well Name: NIMROD UNION ET AL PURPSP 16-21-9-14
Operator Name: Petronas Energy Canada Ltd.
License Number: 0077653
License Date: 1979-08-23
License Status: RecCertified
Spud Date: 1979-08-25
Final Drill Date: 1979-09-02
Well Total Depth: 1007.00 m
Surface Hole Latitude: 49.754615
Surface Hole Longitude: -111.834374

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-23 Obtained License
1979-08-29 Drill Stem Test Performed
1979-09-02 Finished Drilling
1979-09-02 Well Log Performed
1979-09-03 Drill Stem Test Performed
1979-09-04 Drill Stem Test Performed
1979-09-05 Drill Stem Test Performed
1979-09-05 Production Casing Operation Performed
1979-09-05 Well Mode changed to Drilled and Cased
1979-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-13 Perforation Treatment Performed - Jet Perforation
1979-09-14 Perforation Treatment Performed - Cement Squeeze
1979-09-15 Perforation Treatment Performed - Cement Squeeze
1979-09-18 Perforation Treatment Performed - Jet Perforation
1979-09-19 Perforation Treatment Performed - Jet Perforation
1979-09-21 Perforation Treatment Performed - Fractured
1994-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-13 Perforation Treatment Performed - Jet Perforation
1994-11-13 Plug Back Performed
1995-07-10 Perforation Treatment Performed - Jet Perforation
1995-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-28 Perforation Treatment Performed - Cement Plug
1995-08-28 Perforation Treatment Performed - Remedial Casing
1995-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-29 Perforation Treatment Performed - Jet Perforation
1995-08-29 Perforation Treatment Performed - Remedial Casing
1995-08-29 Well Mode changed to Abandoned
1995-09-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-13 Perforation 589.00 589.50 4
1995-07-10 Perforation 253.00 254.00 13
1995-08-28 Acid Treatment 252.20 254.00 0
1995-08-28 Remedial Casing Cementing 252.20 254.00 0
1995-08-28 Cement Plug 215.00 255.00 0
1995-08-29 Perforation 150.00 150.30 72
1995-08-29 Remedial Casing Cementing 150.00 150.30 0
1995-08-29 Packing Device Capped w/Cement 137.00 145.00 0
1979-09-13 Acid Treatment 589.00 589.50 0
1979-09-14 Cement Squeeze 589.00 589.50 0
1979-09-15 Cement Squeeze 589.00 589.50 0
1979-09-18 Perforation 584.00 585.00 13
1979-09-19 Perforation 578.00 580.00 13
1979-09-21 Fracture 578.00 585.00 0
1994-11-13 Packing Device Capped w/Cement 543.00 551.00 0
1994-11-13 Perforation 252.20 253.20 13

For data sources see[4]



References