X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094163315020

Well Details

Well ID: 0094163315020
Loading map...
Location: 02/15-33-009-16W4/0
Location Alias: 02/15-33-09-16 W4M
Location Alias 2: 02/15-33-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 33
County/Municipality: Municipal District of Taber
Well Name: RIFE ET AL 02 TABER 15-33-9-16
Operator Name: Rife Resources Ltd.
License Number: 0176982
License Date: 1995-03-17
License Status: RecCertified
Spud Date: 1995-03-25
Final Drill Date: 1995-03-31
Well Total Depth: 1024.00 m
Surface Hole Latitude: 49.784318
Surface Hole Longitude: -112.113789

For data sources see[1][2]

Well History

Date Event
1995-03-17 Obtained License
1995-03-26 Surface Casing Operation Performed
1995-03-27 Direction Drilling Operation Performed - Deviate
1995-03-31 Finished Drilling
1995-03-31 Well Log Performed
1995-03-31 Well Mode changed to Drilled and Cased
1995-04-01 Production Casing Operation Performed
1995-04-01 Rig Released
1995-04-05 Well Log Performed
1995-04-18 Well Log Performed
1995-04-19 Perforation Treatment Performed - Jet Perforation
1996-03-01 Well Began Production
1996-03-01 Well Fluid changed to Crude Oil
1996-03-01 Well Mode changed to Flowing
1998-08-01 Well Fluid changed to Crude Oil
1998-08-01 Well Mode changed to Suspended
2002-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-21 Plug Back Performed
2002-05-21 Well Fluid changed to Crude Oil
2002-05-21 Well Mode changed to Abandoned Zone
2002-05-27 Well Abandoned
2002-05-27 Well Fluid changed to Crude Oil
2002-05-27 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-03-27 194.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-04-19 Perforation 984.00 989.00 13
2002-05-21 Packing Device Capped w/Cement 967.00 975.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 7018 0.0 0.0 0.0
1997 8487 0.0 0.0 0.0
1998 3565 0.0 0.0 0.0

For data sources see[6]

References