If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094172211000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.750399,"lon":-112.232813,"icon":""}]} |
Location: 00/11-22-009-17W4/0 | |
Location Alias: 00/11-22-09-17 W4M | |
Location Alias 2: 00/11-22-009-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 17 | |
Section: 22 | |
County/Municipality: Municipal District of Taber | |
Well Name: COMMONWEALTH - TABER NO. 1 | |
Operator Name: Westburne International Industries Ltd. | |
License Number: B0001057 | |
License Date: 1945-08-09 | |
License Status: RecExempt | |
Spud Date: 1945-08-18 | |
Final Drill Date: 1945-09-02 | |
Well Total Depth: 980.50 m | |
Surface Hole Latitude: 49.750399 | |
Surface Hole Longitude: -112.232813 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1945-08-09 | Obtained License |
1945-09-02 | Drill Stem Test Performed |
1945-09-02 | Finished Drilling |
1945-09-02 | Well Mode changed to Drilled and Cased |
1945-09-03 | Production Casing Operation Performed |
1945-09-07 | Perforation Treatment Performed - Open-Hole Completion |
1945-09-17 | Well Began Production |
1945-09-17 | Well Fluid changed to Crude Oil |
1945-09-17 | Well Mode changed to Pumping |
1946-10-28 | Perforation Treatment Performed - Cement Squeeze |
1946-10-28 | Well Abandoned |
1946-10-28 | Well Fluid changed to Crude Oil |
1946-10-28 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1945-09-07 | Open Hole/Barefoot Completion | 978.70 | 980.50 | 0 |
1946-10-28 | Cement Squeeze | 966.80 | 980.50 | 0 |
For data sources see[4]