If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094240902000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.728471,"lon":-113.195764,"icon":""}]} |
Location: 00/02-09-009-24W4/0 | |
Location Alias: 00/02-09-09-24 W4M | |
Location Alias 2: 00/02-09-009-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 24 | |
Section: 09 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: TORC HZ PEARCE 2-9-9-24 | |
Operator Name: TORC Oil & Gas Ltd. | |
License Number: 0446346 | |
License Date: 2012-06-07 | |
License Status: Issued | |
Spud Date: 2012-09-11 | |
Final Drill Date: 2012-10-03 | |
Well Total Depth: 3646.00 m | |
Surface Hole Latitude: 49.728471 | |
Surface Hole Longitude: -113.195764 |
Date | Event |
---|---|
2012-06-07 | Obtained License |
2012-09-13 | Surface Casing Operation Performed |
2012-09-17 | Direction Drilling Operation Performed - Deviate |
2012-09-22 | Direction Drilling Operation Performed - Horizontal |
2012-09-23 | Lost Circulation Occurred |
2012-09-24 | Well Log Performed |
2012-09-26 | Well Log Performed |
2012-09-27 | Intermediate Casing Operation Performed |
2012-10-03 | Finished Drilling |
2012-10-03 | Well Log Performed |
2012-10-03 | Well Mode changed to Drilled and Cased |
2012-10-08 | Liner Casing Operation Performed |
2012-10-08 | Rig Released |
2012-10-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-29 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-02 | Well Began Production |
2012-11-02 | Well Fluid changed to Crude Oil |
2012-11-02 | Well Mode changed to Flowing |
2013-01-01 | Well Fluid changed to Crude Oil |
2013-01-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-11 | Trinidad Drilling Ltd. | 34E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-17 | 1978.50 | Deviate (5 - 79 degrees) |
2012-09-22 | 2311.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-29 | Open Hole/Barefoot Completion | 3634.00 | 3646.00 | 0 |
2012-10-30 | Multi-Stage Fracture | 3069.40 | 3069.50 | 0 |
2012-10-30 | Multi-Stage Fracture | 3010.50 | 3010.60 | 0 |
2012-10-31 | Multi-Stage Fracture | 2951.20 | 2951.30 | 0 |
2012-10-31 | Multi-Stage Fracture | 2891.90 | 2892.00 | 0 |
2012-10-31 | Multi-Stage Fracture | 2832.50 | 2832.60 | 0 |
2012-10-31 | Multi-Stage Fracture | 2773.20 | 2773.30 | 0 |
2012-10-31 | Multi-Stage Fracture | 2714.90 | 2715.00 | 0 |
2012-10-31 | Multi-Stage Fracture | 2642.60 | 2642.70 | 0 |
2012-10-31 | Multi-Stage Fracture | 2583.30 | 2583.40 | 0 |
2012-10-31 | Multi-Stage Fracture | 2524.40 | 2524.50 | 0 |
2012-10-29 | Multi-Stage Fracture | 3616.10 | 3616.20 | 0 |
2012-10-31 | Multi-Stage Fracture | 2465.50 | 2465.60 | 0 |
2012-10-29 | Multi-Stage Fracture | 3474.60 | 3474.70 | 0 |
2012-10-30 | Multi-Stage Fracture | 3426.70 | 3426.80 | 0 |
2012-10-30 | Multi-Stage Fracture | 3364.90 | 3365.00 | 0 |
2012-10-30 | Multi-Stage Fracture | 3305.50 | 3305.60 | 0 |
2012-10-30 | Multi-Stage Fracture | 3246.10 | 3246.20 | 0 |
2012-10-30 | Multi-Stage Fracture | 3187.30 | 3187.40 | 0 |
2012-10-30 | Multi-Stage Fracture | 3128.00 | 3128.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1276 | 0.0 | 0.0 | 0.0 |
2013 | 8524 | 0.0 | 0.0 | 0.0 |
2014 | 6572 | 0.0 | 0.0 | 0.0 |
2015 | 8252 | 0.0 | 0.0 | 0.0 |
2016 | 8399 | 0.0 | 0.0 | 0.0 |
2017 | 8619 | 0.0 | 0.0 | 0.0 |
2018 | 8722 | 0.0 | 0.0 | 0.0 |
2019 | 8687 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-23 | Lost Circulation | 1641.00 | 1643.00 |
2012-11-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]