X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104122213000

Well Details

Well ID: 0104122213000
Loading map...
Location: 00/13-22-010-12W4/0
Location Alias: 00/13-22-10-12 W4M
Location Alias 2: 00/13-22-010-12 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 12
Section: 22
County/Municipality: County of Forty Mile No. 8
Well Name: RIO-PRADO BURDETT NO. 13-22
Operator Name: Triad Oil Manitoba Ltd
License Number: 0006761
License Date: 1953-07-17
License Status: RecExempt
Spud Date: 1953-07-22
Final Drill Date: 1953-08-13
Well Total Depth: 918.40 m
Surface Hole Latitude: 49.841892
Surface Hole Longitude: -111.559312

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-17 Obtained License
1953-08-03 Drill Stem Test Performed
1953-08-08 Drill Stem Test Performed
1953-08-13 Drill Stem Test Performed
1953-08-13 Finished Drilling
1953-08-13 Well Mode changed to Drilled and Cased
1953-08-14 Drill Stem Test Performed
1953-08-14 Perforation Treatment Performed - Bullet Perforation
1953-08-15 Perforation Treatment Performed - Cement Squeeze
1953-08-25 Production Casing Operation Performed
1953-11-03 Perforation Treatment Performed - Bullet Perforation
1953-11-03 Perforation Treatment Performed - Cement Squeeze
1953-11-04 Perforation Treatment Performed - Bullet Perforation
1953-11-05 Perforation Treatment Performed - Cement Squeeze
1954-05-08 Perforation Treatment Performed - Bullet Perforation
1954-05-08 Perforation Treatment Performed - Cement Squeeze
1954-09-27 Well Fluid changed to Crude Oil
1954-09-27 Well Mode changed to Potential
1954-09-28 Perforation Treatment Performed - Cement Plug
1954-09-28 Well Abandoned
1954-09-28 Well Fluid changed to Crude Oil
1954-09-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-08-14 Bullet Perforation 905.30 907.10 10
1953-08-15 Cement Squeeze 905.30 907.10 0
1953-11-03 Bullet Perforation 905.30 906.50 13
1953-11-03 Cement Squeeze 905.30 906.50 0
1953-11-04 Bullet Perforation 905.30 906.20 13
1953-11-05 Cement Squeeze 905.30 906.20 0
1954-05-08 Bullet Perforation 905.30 906.80 10
1954-05-08 Cement Squeeze 905.30 906.80 0
1954-09-28 Cement Plug 823.00 906.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References