If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104130307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.790734,"lon":-111.681904,"icon":""}]} |
Location: 00/07-03-010-13W4/0 | |
Location Alias: 00/07-03-10-13 W4M | |
Location Alias 2: 00/07-03-010-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 13 | |
Section: 03 | |
County/Municipality: Municipal District of Taber | |
Well Name: PALOMA ET AL BOW ISLAND 7-3-10-13 | |
Operator Name: Terra Energy Corp. | |
License Number: 0144044 | |
License Date: 1990-04-30 | |
License Status: RecCertified | |
Spud Date: 1990-05-06 | |
Final Drill Date: 1990-05-10 | |
Well Total Depth: 956.00 m | |
Surface Hole Latitude: 49.790734 | |
Surface Hole Longitude: -111.681904 |
Date | Event |
---|---|
1990-04-30 | Obtained License |
1990-05-07 | Surface Casing Operation Performed |
1990-05-10 | Finished Drilling |
1990-05-10 | Well Log Performed |
1990-05-10 | Well Mode changed to Drilled and Cased |
1990-05-11 | Drill Stem Test Performed |
1990-05-12 | Production Casing Operation Performed |
1990-05-12 | Rig Released |
1990-05-22 | Well Log Performed |
1990-05-23 | Well Log Performed |
1990-05-24 | Perforation Treatment Performed - Jet Perforation |
1990-05-24 | Perforation Treatment Performed - Remedial Casing |
1990-05-25 | Well Log Performed |
1990-05-26 | Perforation Treatment Performed - Jet Perforation |
1990-06-01 | Well Began Production |
1990-06-01 | Well Fluid changed to Crude Oil |
1990-06-01 | Well Mode changed to Pumping |
1990-08-01 | Well Fluid changed to Crude Oil |
1990-08-01 | Well Mode changed to Suspended |
1992-08-17 | Well Log Performed |
1992-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-08-18 | Plug Back Performed |
1992-08-18 | Well Abandoned |
1992-08-18 | Well Fluid changed to Crude Oil |
1992-08-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-05-24 | Perforation | 190.00 | 190.20 | 13 |
1990-05-24 | Remedial Casing Cementing | 190.00 | 190.20 | 0 |
1990-05-26 | Perforation | 910.50 | 912.00 | 13 |
1992-08-18 | Packing Device Capped w/Cement | 897.00 | 905.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 1355 | 0.0 | 0.0 | 0.0 |
For data sources see[5]