X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104130307000

Well Details

Well ID: 0104130307000
Loading map...
Location: 00/07-03-010-13W4/0
Location Alias: 00/07-03-10-13 W4M
Location Alias 2: 00/07-03-010-13 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 13
Section: 03
County/Municipality: Municipal District of Taber
Well Name: PALOMA ET AL BOW ISLAND 7-3-10-13
Operator Name: Terra Energy Corp.
License Number: 0144044
License Date: 1990-04-30
License Status: RecCertified
Spud Date: 1990-05-06
Final Drill Date: 1990-05-10
Well Total Depth: 956.00 m
Surface Hole Latitude: 49.790734
Surface Hole Longitude: -111.681904

For data sources see[1][2]

Well History

Date Event
1990-04-30 Obtained License
1990-05-07 Surface Casing Operation Performed
1990-05-10 Finished Drilling
1990-05-10 Well Log Performed
1990-05-10 Well Mode changed to Drilled and Cased
1990-05-11 Drill Stem Test Performed
1990-05-12 Production Casing Operation Performed
1990-05-12 Rig Released
1990-05-22 Well Log Performed
1990-05-23 Well Log Performed
1990-05-24 Perforation Treatment Performed - Jet Perforation
1990-05-24 Perforation Treatment Performed - Remedial Casing
1990-05-25 Well Log Performed
1990-05-26 Perforation Treatment Performed - Jet Perforation
1990-06-01 Well Began Production
1990-06-01 Well Fluid changed to Crude Oil
1990-06-01 Well Mode changed to Pumping
1990-08-01 Well Fluid changed to Crude Oil
1990-08-01 Well Mode changed to Suspended
1992-08-17 Well Log Performed
1992-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-18 Plug Back Performed
1992-08-18 Well Abandoned
1992-08-18 Well Fluid changed to Crude Oil
1992-08-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-05-24 Perforation 190.00 190.20 13
1990-05-24 Remedial Casing Cementing 190.00 190.20 0
1990-05-26 Perforation 910.50 912.00 13
1992-08-18 Packing Device Capped w/Cement 897.00 905.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1355 0.0 0.0 0.0

For data sources see[5]

References