X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104162412020

Well Details

Well ID: 0104162412020
Loading map...
Location: 02/12-24-010-16W4/0
Location Alias: 02/12-24-10-16 W4M
Location Alias 2: 02/12-24-010-16 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 16
Section: 24
County/Municipality: Municipal District of Taber
Well Name: STRATEGIC 02 TABER 12-24-10-16
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0167180
License Date: 1994-05-16
License Status: Suspension
Spud Date: 1994-05-24
Final Drill Date: 1994-05-29
Well Total Depth: 990.00 m
Surface Hole Latitude: 49.840232
Surface Hole Longitude: -112.056801

For data sources see[1][2]

Well History

Date Event
1994-05-16 Obtained License
1994-05-25 Surface Casing Operation Performed
1994-05-29 Finished Drilling
1994-05-29 Well Mode changed to Drilled and Cased
1994-05-30 Production Casing Operation Performed
1994-05-30 Well Log Performed
1994-05-31 Perforation Treatment Performed - Jet Perforation
1994-05-31 Well Log Performed
1994-06-01 Rig Released
1994-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-09 Perforation Treatment Performed - Remedial Casing
1994-06-12 Well Log Performed
1994-06-13 Well Log Performed
1994-06-16 Well Log Performed
1994-06-17 Perforation Treatment Performed - Remedial Casing
1994-06-20 Well Log Performed
1994-06-21 Perforation Treatment Performed - Jet Perforation
1994-06-23 Well Began Production
1994-06-23 Well Fluid changed to Crude Oil
1994-06-23 Well Mode changed to Flowing
2001-09-18 Well Fluid changed to Crude Oil
2001-09-18 Well Mode changed to Pumping
2013-08-01 Well Fluid changed to Crude Oil
2013-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-05-31 Perforation 196.00 197.00 13
1994-05-31 Perforation 279.00 280.00 13
1994-06-09 Acid Treatment 196.00 197.00 0
1994-06-09 Remedial Casing Cementing 196.00 197.00 0
1994-06-17 Remedial Casing Cementing 279.00 280.00 0
1994-06-21 Perforation 955.00 957.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 4120 0.0 0.0 0.0
1995 8511 0.0 0.0 0.0
1996 8644 0.0 0.0 0.0
1997 8722 0.0 0.0 0.0
1998 8695 0.0 0.0 0.0
1999 8596 0.0 0.0 0.0
2000 8687 0.0 0.0 0.0
2001 8670 0.0 0.0 0.0
2002 8646 0.0 0.0 0.0
2003 8724 0.0 0.0 0.0
2004 8751 0.0 0.0 0.0
2005 8742 0.0 0.0 0.0
2006 8166 0.0 0.0 0.0
2007 8719 0.0 0.0 0.0
2008 8714 0.0 0.0 0.0
2009 8710 0.0 0.0 0.0
2010 8211 0.0 0.0 0.0
2011 6371 0.0 0.0 0.0
2012 720 0.0 0.0 0.0

For data sources see[5]

References