If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104181916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.843888,"lon":-112.424626,"icon":""}]} |
Location: 00/16-19-010-18W4/0 | |
Location Alias: 00/16-19-10-18 W4M | |
Location Alias 2: 00/16-19-010-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 18 | |
Section: 19 | |
County/Municipality: Municipal District of Taber | |
Well Name: BHP (CAN) TURIN 16-19-10-18 | |
Operator Name: BHP Billiton Canada Inc. | |
License Number: 0123124 | |
License Date: 1986-05-02 | |
License Status: RecCertified | |
Spud Date: 1986-05-10 | |
Final Drill Date: 1986-05-16 | |
Well Total Depth: 1089.00 m | |
Surface Hole Latitude: 49.843888 | |
Surface Hole Longitude: -112.424626 |
Date | Event |
---|---|
1986-05-02 | Obtained License |
1986-05-11 | Surface Casing Operation Performed |
1986-05-16 | Finished Drilling |
1986-05-16 | Well Log Performed |
1986-05-16 | Well Mode changed to Drilled and Cased |
1986-05-17 | Production Casing Operation Performed |
1986-05-17 | Rig Released |
1986-05-26 | Well Log Performed |
1986-05-27 | Perforation Treatment Performed - Jet Perforation |
1986-05-27 | Well Log Performed |
1986-05-28 | Perforation Treatment Performed - Jet Perforation |
1986-05-28 | Well Log Performed |
1986-05-30 | Well Began Production |
1986-05-30 | Well Fluid changed to Crude Oil |
1986-05-30 | Well Mode changed to Pumping |
1986-08-26 | Perforation Treatment Performed - Jet Perforation |
1986-08-26 | Well Log Performed |
1990-02-22 | Well Fluid changed to Crude Oil |
1990-02-22 | Well Mode changed to Suspended |
1993-01-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-01-30 | Plug Back Performed |
1993-01-30 | Well Fluid changed to Crude Oil |
1993-01-30 | Well Mode changed to Abandoned |
1993-02-01 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-05-27 | Perforation | 1059.50 | 1060.50 | 13 |
1986-05-28 | Perforation | 1053.00 | 1054.00 | 13 |
1986-05-28 | Perforation | 1050.00 | 1051.00 | 13 |
1986-08-26 | Perforation | 1050.00 | 1054.00 | 14 |
1993-01-30 | Packing Device Capped w/Cement | 1038.60 | 1046.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 2441 | 0.0 | 0.0 | 0.0 |
1987 | 4145 | 0.0 | 0.0 | 0.0 |
1988 | 8491 | 0.0 | 0.0 | 0.0 |
1989 | 6084 | 0.0 | 0.0 | 0.0 |
For data sources see[5]