X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104183008000

Well Details

Well ID: 0104183008000
Loading map...
Location: 00/08-30-010-18W4/0
Location Alias: 00/08-30-10-18 W4M
Location Alias 2: 00/08-30-010-18 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 18
Section: 30
County/Municipality: Municipal District of Taber
Well Name: BHP(CAN) TURIN 8-30-10-18
Operator Name: BHP Billiton Canada Inc.
License Number: 0119157
License Date: 1985-11-08
License Status: RecCertified
Spud Date: 1986-05-20
Final Drill Date: 1986-05-25
Well Total Depth: 1075.00 m
Surface Hole Latitude: 49.849005
Surface Hole Longitude: -112.425916

For data sources see[1][2]

Well History

Date Event
1985-11-08 Obtained License
1986-05-21 Surface Casing Operation Performed
1986-05-25 Finished Drilling
1986-05-25 Well Log Performed
1986-05-25 Well Mode changed to Drilled and Cased
1986-05-26 Production Casing Operation Performed
1986-05-26 Rig Released
1986-06-09 Well Log Performed
1986-06-10 Perforation Treatment Performed - Jet Perforation
1986-06-10 Well Log Performed
1986-06-12 Perforation Treatment Performed - Jet Perforation
1986-06-12 Well Log Performed
1986-06-15 Well Began Production
1986-06-15 Well Fluid changed to Crude Oil
1986-06-15 Well Mode changed to Flowing
1986-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-03 Perforation Treatment Performed - Jet Perforation
1993-05-03 Well Log Performed
1993-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-30 Plug Back Performed
1993-07-30 Well Fluid changed to Crude Oil
1993-07-30 Well Mode changed to Abandoned
1993-08-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-06-10 Perforation 1047.00 1048.00 13
1986-06-12 Perforation 1047.00 1049.00 13
1986-07-30 Acid Treatment 1047.00 1049.00 0
1986-07-31 Acid Treatment 1047.00 1049.00 0
1993-05-03 Perforation 1042.60 1043.80 13
1993-07-30 Packing Device Capped w/Cement 1031.00 1039.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1971 0.0 0.0 0.0

For data sources see[5]

References