If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104183014000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.855496,"lon":-112.435968,"icon":""}]} |
Location: 00/14-30-010-18W4/0 | |
Location Alias: 00/14-30-10-18 W4M | |
Location Alias 2: 00/14-30-010-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 18 | |
Section: 30 | |
County/Municipality: Municipal District of Taber | |
Well Name: BHP(CAN) TURIN 14-30-10-18 | |
Operator Name: BHP Billiton Canada Inc. | |
License Number: 0104188 | |
License Date: 1983-11-18 | |
License Status: RecCertified | |
Spud Date: 1983-11-22 | |
Final Drill Date: 1983-11-28 | |
Well Total Depth: 1075.00 m | |
Surface Hole Latitude: 49.855496 | |
Surface Hole Longitude: -112.435968 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-11-18 | Obtained License |
1983-11-28 | Finished Drilling |
1983-11-28 | Well Mode changed to Drilled and Cased |
1983-11-30 | Drill Stem Test Performed |
1983-11-30 | Kick Occurred |
1983-12-03 | Production Casing Operation Performed |
1983-12-20 | Well Log Performed |
1984-03-06 | Perforation Treatment Performed - Jet Perforation |
1984-03-08 | Perforation Treatment Performed - Cement Squeeze |
1984-03-11 | Perforation Treatment Performed - Jet Perforation |
1984-03-13 | Perforation Treatment Performed - Acid Wash - No Pressure |
1984-03-27 | Perforation Treatment Performed - Jet Perforation |
1984-04-16 | Well Log Performed |
1984-05-01 | Perforation Treatment Performed - Jet Perforation |
1986-07-29 | Perforation Treatment Performed - Acid Wash - No Pressure |
1989-04-27 | Well Log Performed |
1989-04-28 | Perforation Treatment Performed - Cement Squeeze |
1989-04-28 | Well Log Performed |
1989-04-29 | Perforation Treatment Performed - Jet Perforation |
1989-05-19 | Well Began Production |
1989-05-19 | Well Fluid changed to Gas |
1989-05-19 | Well Mode changed to Flowing |
1991-01-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-01-04 | Plug Back Performed |
1991-01-04 | Well Fluid changed to Gas |
1991-01-04 | Well Log Performed |
1991-01-04 | Well Mode changed to Abandoned |
1991-01-08 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-03-06 | Perforation | 1057.00 | 1059.50 | 13 |
1991-01-04 | Packing Device Capped w/Cement | 1039.00 | 1047.00 | 0 |
1984-03-08 | Cement Squeeze | 1057.00 | 1059.50 | 0 |
1984-03-11 | Perforation | 1057.00 | 1058.00 | 13 |
1984-03-13 | Acid Wash | 1057.00 | 1058.00 | 0 |
1984-03-27 | Perforation | 1058.50 | 1059.50 | 13 |
1984-05-01 | Perforation | 1059.50 | 1061.00 | 13 |
1986-07-29 | Acid Wash | 1057.00 | 1061.00 | 0 |
1989-04-28 | Cement Squeeze | 1057.00 | 1061.00 | 0 |
1989-04-29 | Perforation | 1049.20 | 1050.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 5050 | 0.0 | 0.0 | 0.0 |
1985 | 5460 | 0.0 | 0.0 | 0.0 |
1986 | 7833 | 0.0 | 0.0 | 0.0 |
1987 | 8733 | 0.0 | 0.0 | 0.0 |
1988 | 7625 | 0.0 | 0.0 | 0.0 |
1989 | 4819 | 0.0 | 0.0 | 0.0 |
1990 | 4415 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1983-11-30 | Kick | 1075.00 | 1075.00 |
For data sources see[6]