If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104193614002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.869653,"lon":-112.457054,"icon":""}]} |
Location: 00/14-36-010-19W4/2 | |
Location Alias: 00/14-36-10-19 W4M | |
Location Alias 2: 00/14-36-010-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 19 | |
Section: 36 | |
County/Municipality: Municipal District of Taber | |
Well Name: BHP (CAN) ET AL TURIN 14-36-10-19 | |
Operator Name: BHP Billiton Canada Inc. | |
License Number: 0123521 | |
License Date: 1986-07-24 | |
License Status: RecCertified | |
Spud Date: 1986-07-26 | |
Final Drill Date: 1986-07-29 | |
Well Total Depth: 1040.00 m | |
Surface Hole Latitude: 49.869653 | |
Surface Hole Longitude: -112.457054 |
Date | Event |
---|---|
1986-07-24 | Obtained License |
1986-07-27 | Surface Casing Operation Performed |
1986-07-29 | Finished Drilling |
1986-07-29 | Well Mode changed to Drilled and Cased |
1986-07-30 | Drill Stem Test Performed |
1986-07-30 | Well Log Performed |
1986-07-31 | Drill Stem Test Performed |
1986-08-01 | Production Casing Operation Performed |
1986-08-01 | Rig Released |
1986-08-19 | Perforation Treatment Performed - Jet Perforation |
1986-08-19 | Well Log Performed |
1990-03-30 | Well Log Performed |
1990-04-01 | Perforation Treatment Performed - Cement Squeeze |
1990-04-01 | Plug Back Performed |
1990-04-05 | Perforation Treatment Performed - Jet Perforation |
1990-04-05 | Well Log Performed |
1990-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-04-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-04-19 | Well Began Production |
1990-04-19 | Well Fluid changed to Crude Oil |
1990-04-19 | Well Mode changed to Pumping |
1990-05-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-05-29 | Well Fluid changed to Crude Oil |
1990-05-29 | Well Mode changed to Suspended |
1990-12-19 | Well Log Performed |
1991-01-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-01-02 | Plug Back Performed |
1991-01-02 | Well Fluid changed to Crude Oil |
1991-01-02 | Well Mode changed to Abandoned |
1991-02-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-08-19 | Perforation | 1013.00 | 1013.50 | 12 |
1986-08-19 | Perforation | 1014.00 | 1015.50 | 12 |
1990-04-01 | Cement Squeeze | 1013.00 | 1015.50 | 0 |
1990-04-05 | Perforation | 1020.00 | 1022.00 | 13 |
1990-04-06 | Acid Treatment | 1020.00 | 1022.00 | 0 |
1990-04-08 | Acid Treatment | 1020.00 | 1022.00 | 0 |
1990-05-12 | Acid Treatment | 1020.00 | 1022.00 | 0 |
1991-01-02 | Packing Device Capped w/Cement | 796.80 | 1018.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 933 | 0.0 | 0.0 | 0.0 |
For data sources see[5]