If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104270808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.806985,"lon":-113.620294,"icon":""}]} |
Location: 00/08-08-010-27W4/0 | |
Location Alias: 00/08-08-10-27 W4M | |
Location Alias 2: 00/08-08-010-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 27 | |
Section: 08 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: CNRL AMELIA 8-8-10-27 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0079809 | |
License Date: 1979-12-11 | |
License Status: RecCertified | |
Spud Date: 1979-12-21 | |
Final Drill Date: 1980-03-24 | |
Well Total Depth: 2720.00 m | |
Surface Hole Latitude: 49.806985 | |
Surface Hole Longitude: -113.620294 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-12-11 | Obtained License |
1979-12-21 | Direction Drilling Operation Performed - 98 |
1980-01-03 | Lost Circulation Occurred |
1980-01-08 | Lost Circulation Occurred |
1980-01-18 | Lost Circulation Occurred |
1980-01-23 | Well Log Performed |
1980-01-26 | Production Casing Operation Performed |
1980-02-21 | Perforation Treatment Performed - Jet Perforation |
1980-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-23 | Perforation Treatment Performed - Fractured |
1980-03-24 | Finished Drilling |
1980-03-24 | Well Mode changed to Drilled and Cased |
1980-03-28 | Water Flow Occurred |
1980-04-01 | Perforation Treatment Performed - Cement Plug |
1980-04-29 | Perforation Treatment Performed - Jet Perforation |
1980-05-01 | Perforation Treatment Performed - Fractured |
1980-05-25 | Well Began Production |
1980-05-25 | Well Fluid changed to Crude Oil |
1980-05-25 | Well Mode changed to Pumping |
1981-07-31 | Well Fluid changed to Crude Oil |
1981-07-31 | Well Mode changed to Suspended |
1985-11-01 | Well Fluid changed to Crude Oil |
1985-11-01 | Well Mode changed to Pumping |
1995-08-31 | Well Fluid changed to Crude Oil |
1995-08-31 | Well Mode changed to Suspended |
1996-01-02 | Well Fluid changed to Crude Oil |
1996-01-02 | Well Mode changed to Pumping |
1996-08-31 | Well Fluid changed to Crude Oil |
1996-08-31 | Well Mode changed to Suspended |
1997-01-03 | Well Fluid changed to Crude Oil |
1997-01-03 | Well Mode changed to Pumping |
1997-08-31 | Well Fluid changed to Crude Oil |
1997-08-31 | Well Mode changed to Suspended |
1999-08-23 | Well Fluid changed to Crude Oil |
1999-08-23 | Well Mode changed to Pumping |
1999-12-05 | Perforation Treatment Performed - Cement Squeeze |
1999-12-05 | Plug Back Performed |
1999-12-05 | Well Fluid changed to Crude Oil |
1999-12-05 | Well Mode changed to Abandoned and Whipstocked |
2008-09-30 | Well Log Performed |
2008-10-02 | Well Log Performed |
2008-10-04 | Well Log Performed |
2008-10-05 | Well Log Performed |
2008-10-06 | Well Log Performed |
2008-10-28 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1979-12-21 | 2350.00 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-02-21 | Perforation | 2155.00 | 2165.00 | 7 |
1980-02-22 | Acid Treatment | 2155.00 | 2165.00 | 0 |
1980-02-23 | Fracture | 2155.00 | 2165.00 | 0 |
1980-04-01 | Cement Plug | 2100.00 | 2260.00 | 0 |
1980-04-29 | Perforation | 2050.00 | 2053.00 | 7 |
1980-05-01 | Fracture | 2050.00 | 2053.00 | 0 |
1999-12-05 | Cement Squeeze | 2050.00 | 2053.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 313 | 0.0 | 0.0 | 0.0 |
1981 | 2497 | 0.0 | 0.0 | 0.0 |
1982 | 1534 | 0.0 | 0.0 | 0.0 |
1983 | 240 | 0.0 | 0.0 | 0.0 |
1984 | 72 | 0.0 | 0.0 | 0.0 |
1985 | 192 | 0.0 | 0.0 | 0.0 |
1986 | 2386 | 0.0 | 0.0 | 0.0 |
1987 | 4488 | 0.0 | 0.0 | 0.0 |
1988 | 2945 | 0.0 | 0.0 | 0.0 |
1989 | 2665 | 0.0 | 0.0 | 0.0 |
1990 | 3144 | 0.0 | 0.0 | 0.0 |
1991 | 3225 | 0.0 | 0.0 | 0.0 |
1992 | 3480 | 0.0 | 0.0 | 0.0 |
1993 | 2860 | 0.0 | 0.0 | 0.0 |
1994 | 2850 | 0.0 | 0.0 | 0.0 |
1995 | 2036 | 0.0 | 0.0 | 0.0 |
1996 | 958 | 0.0 | 0.0 | 0.0 |
1997 | 1849 | 0.0 | 0.0 | 0.0 |
1999 | 1088 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-01-03 | Lost Circulation | 1350.00 | 1350.00 |
1980-01-08 | Lost Circulation | 1740.00 | 1767.00 |
1980-01-18 | Lost Circulation | 2243.00 | 2243.00 |
1980-03-28 | Water Flow | 2720.00 | 0.00 |
For data sources see[7]